3. Pull cable tight and secure in place with spiral pin using a 3/16” pin punch and a hammer.
Qty.Description
1Spiral pin1
1Cable2
1Top weight connector3
4. Place weight stack selector pin in each plate to verify proper installation.
5. Lift top weight up and down simulating normal operation (without selecting any resistance).
6. Verify that the cable is moving smoothly and is routed straight from the pulley bracket to the top weight
connector.
Install back shroud
1. Place shroud into position.
2. Starting at the bottom replace the two BHSCS to secure bottom support bracket to the shroud.
3. Install but do not tighten remaining BHSCS securing shroud.
4. Tighten all BHSCS.
Securely anchor machine to floor
Owner should not allow equipment to be used until it is properly anchored as described below.
WARNING: Anchoring equipment:
To maximize stability and eliminate rocking, tipping, or falling over, equipment must be anchored to a
solid, level surface, utilizing all anchoring holes provided.
Fasteners must have a minimum of 500 lbs. tensile capacity. Cybex recommends .3/8” grade 2 bolts or
better. A minimum pull force of 220 lbs/100 kgs is required for each anchor position.
If leg frames do not contact surface, DO NOT pull down with anchors. Shim any leg or frame not in contact
with surface using flat washers.
Due to the wide variation of flooring on which machines may be anchored or installed, consult with a
qualified and licensed contractor to ensure proper anchoring and installation.
Verify proper operation
Page 14 of 23