Loading ...
Loading ...
Loading ...
Commissioning
19
During commissioning, the following settings must be carried out.
You will be asked to program settings one after the other
automatically, and currently selected values will have a check
beside them. The commissioning process requires a set period of
time which cannot be interrupted.
The Commercial Dishwasher will guide you automatically through the
steps required.
Reactivation is carried out during the first program following
commissioning.
If the first program after commissioning is not completed and the
Commercial Dishwasher is then switched off, the initial
commissioning process must be carried out again.
The following options (with the exception of “Plumbing
connections”) can be altered subsequently by selecting the
“Settings ” menu and “Additional settings”.
Switching on the
machine
The dishwasher must be connected to the electrical supply.
Close the door
(door must be completely closed for commissioning).
Press the button until the button's LED lights up.
Setting
the language
The commissioning process automatically begins at the language
setting screen, where you will be prompted to set the display
language.
Language 
,
;
(
english (GB)
deutsch
Use the and arrow buttons to select the desired language and
confirm your choice with the OKbutton.
Loading ...
Loading ...
Loading ...