Loading ...
Loading ...
Loading ...
Installation
28
Connection of the appliance to the gas
supply must be in accordance with the
requirements of AS5601. A ½” BSP
connector at the inlet is recommended and
the gas supply line to the appliance must be
of adequate length to allow sufficient
withdrawal of appliance for service or
disconnection and be:
1. annealed copper pipe or;
2. flexible hose according to AS/NZ1869
& be at least Class “B”, 10 mm diameter.
The appliance must be installed according
to applicable provisions to allow the gas to
be turned off and disconnected for
servicing and removal of the appliance as
required from the gas supply company.
Before the appliance is operated make
certain all relevant parts are placed in the
correct position.
On completion of the installation, the
installer MUST check for gas leaks and test
each burner individually for the correct
flame. Once all burners have been tested
individually, turn all burners on together.
Warranty service calls do not cover these
adjustments!
To check the operating pressure of the
appliance it is recommended at least 2
large size burners are used. Ensure
appliance is secured to wall when
installation is completed.
N.G. The regulator supplied must be fitted
to the ½ BSP thread at the rear of the
appliance. An approved manual shut-off
valve must be installed. The N.G. regulator
must be checked and adjusted to 1.0kPa
after installation.
U.L.P.G. Can be connected to the inlet
fitting directly. The pressure must be
checked to ensure it is operating at
2.75kPa. A separate test point fitting must
be installed between the piping & the
appliance for the pressure to be checked to
ensure it is operating at 2.75kPa.
Loading ...
Loading ...
Loading ...