Loading ...
Loading ...
Loading ...
Page 8
BEFORE FIRST OPERATION
1. Grip each side of the bucket and pull to remove the bucket from the
dehumidier (Fig. 4).
2. Check inside the bucket to make sure the oat system is in the correct
position. If not, place the oat in the correct position (Fig. 5).
3. Re-insert the bucket once you have determined the oat system is in the
correct position (Fig. 6)
The oat in the bucket is essential to the “bucket full” system working properly.
Do not remove the oat and make sure the oat can rotate freely.
SET UP & USE
Fig. 4
Fig. 5
Fig. 6
Loading ...
Loading ...
Loading ...