Loading ...
Loading ...
Loading ...
804052 - CS Residential- Installation Instructions - Sept 2016 - v3.01 Page 17 of 20
Section 5
Commissioning
5.2 - CO
2
Purge
1.
Press the [START] button to commence the purging
process.
2.
Purge for 10 seconds and ensure all water has stopped
flowing through the tap. (You will hear the CO
2
gas
escaping from the tap).
3.
Press the [Stop] button.
4.
Press [Next] for the filter flush screen
The HydroTap is now ready to be commissioned.
•
Turn ON the water and gas and check for any leaks.
•
Turn the power ON at the GPO and at the side of the undersink unit
•
Familiarise yourself with the operation of the Tap, in preparation for use (See User Manual)
•
Follow the Installation instructions below (and review Section C of the User Manual).
•
Initially you will be prompted to select a language
•
After commissioning, the system may be customised by selecting further options in
Section G - Settings, within the User Manual.
5.1 - Select the Language
Initial Commissioning screen
Language selection screen
Loading ...
Loading ...
Loading ...