Baumatic BSO612W Ovens

User Manual - Page 19

For BSO612W.

PDF File Manual, 28 pages, Read Online | Download pdf file

BSO612W photo
Loading ...
Loading ...
Loading ...
INSTALLATION
The installation must be carried out by a suitably
the Scottish Development
rk Regulations.
nnecting the appliance, make sure that the supply voltage
essible position adjacent to the appliance. The spur
outlet must still be accessible even when your oven is located in
its housing.
n it must be replaced
by an appropriate replacement which can be obtained from the
Spares Department.
19
qualified person, in accordance with the current
version of the following.
o UK Regulations and Safety Standards or their European
Norm Replacements.
o Building Regulations (issued by the Department of the
Environment).
o Building Standards (issued by
Department).
o IEE Wiring Regulations.
o Electricity At Wo
Electrical connection
Before co
marked on the rating plate corresponds with your mains supply
voltage.
WARNING: THIS APPLIANCE MUST BE EARTHED.
o This appliance should be wired into a 13A double pole switched
fused spur outlet, having 3 mm contact separation and placed in
an easily acc
o To connect the oven power cord, loosen and remove the cover
on the terminal block, in order to gain access to the contacts
inside. Make the connection, securing the cord in place with the
cable clamp provided and then immediately close the terminal
block cover again.
o If you have to change the oven power cord, the earthing
(yellow/green) conductor must always be 10 mm longer than the
line conductors.
o Care must be taken to ensure that the temperature of the mains
supply cable does not exceed 50°C.
o If the mains supply cable is damaged, the
Loading ...
Loading ...
Loading ...