Capital GRT24WK-L Cooking 24" Power-Wok - LP

User Manual - Page 19

For GRT24WK-L.

PDF File Manual, 23 pages, Read Online | Download pdf file

GRT24WK-L photo
Loading ...
Loading ...
Loading ...
18
INSTALLER FINAL CHECKLIST
GENERAL
Placement of unit.
Specified clearance maintained to cabinet surfaces.
Unit level – front to back, side to side.
All packaging material and tie straps removed, drip pans clean and empty.
Backguard attached if there is less than 12” clearance above the cooking surface to combustibles
behind unit.
ELECTRICAL
Receptacle with 15 ampere over-current protection is provided for service cord connection.
Adequate ground connection.
GAS SUPPLY
Connection: 1/2 NPT with a minimum 5/8” diameter metal flex line.
Site gas supply is compatible with wok model, & sufficient pressure is available
(see gas requirements pg. 12)
Manual gas shut-off valve installed in accessible location.
Unit tested and free of gas leaks.
OPERATION
All internal packing materials removed.
Bezel centered on burner knob and knob turn freely.
Burners lights satisfactorily.
Burner grate correctly positioned, level, and do not rock.
Loading ...
Loading ...
Loading ...