Loading ...
Black - Element Return Wire
Black - Element Wire
Black - Control Wire
Blue - Control Wire
Blue control wire and black element return wire are connected.
Connect L2/Neutral to these during installation.
Black wire from control.
Connect L1 to this during installation.
Yellow control wire and black element wire are connected.
Do not change during installation.
Control Board
LPC
Thermal Cutoff
Ground
L2 / Neutral
L1
Yellow - Control Wire
Operation
3. Furniture: Place furniture no closer than 3” (7.62 cm) from
the front of the Smart Baseboard. (Figure 1D)
4. Overhanging Solid Objects (Except Plastic): Position
Smart baseboard so there is at least 14” (35.6 cm) between
the top of the heater and any solid object that obstructs or
redirects the vertical air ow out of the top of the unit. (Fig-
ure 1C)
5. Overhanging Plastic Objects: All Plastic items that can-
not withstand extended exposure to temperatures 60º C or
higher should be kept a minimum of 20” (50.8cm) above the
unit. (Figure 1C))
!
NOTE: Ensure that when 2 Smart Baseboards are installed
near the same corner they are both a minimum of 6” from
the corner.
Installation
All Smart Baseboards must be connected from the right side
of the heater.
!
NOTE: The left hand end of the enclosure can be used as
a junction box and the space under the heater can be used as
a wireway.
CAUTION: Disconnect power supply before installation to
prevent electric shock.
1. Unpack and place Smart Baseboard on oor face up, use
packaging to protect oor if required. Remove front covers.
!
NOTE: Remove the center cover, by releasing the top
rst.
!
NOTE: Heater ns can be easily bent. For optimal per-
formance ensure that they remain vertical.
2. Orient unit in desired location and mark pilot holes - top and
bottom at both ends and at least one set in middle.
3. Wire unit as per diagrams (below) and National and Local
Electrical Codes.
CAUTION: Connect heaters to a branch circuit used only
for permanently installed heater and protected by over cur-
rent devices rated or set at no more than 30 amperes. The
total connected load should not be more than 80% of the
rating of the over current devices. It may cause a re haz-
ard if not installed and maintained in accordance with these
instructions.
4. Position LPC, pushing cable back into wall (or conduit), run
screws through pre-selected mounting holes and spacers
(if applicable), using appropriate wall anchors, if necessary.
!
NOTE: Screw should be backed off 1/2 turn from snug
1. This smart baseboard must be properly installed before it
is used.
2. Prior to energizing, remove all construction dirt (plaster,
sawdust, etc.) from interior and exterior of smart baseboard.
Dimplex smart baseboards are designed and tested for safe
and trouble-free operation. All Dimplex smart baseboards are
protected against overheating by a built-in thermal cutout.
Free airow throughout the smart baseboard is very impor-
tant for the most efcient operation of the smart baseboard.
Restricted airow may cause the thermal overload protector
to cycle the smart baseboard “ON and OFF”. A cycling smart
baseboard will not supply sufcient heat to the room.
CAUTION: Avoid direct contact of paper, fabric, or furniture
with smart baseboard, to prevent a possible re.
When power is rst supplied to the LPC the Setpoint Tempera-
ture will ash in the temperature display area. At any time ei-
ther the + or - button can be pressed to have the temperature
setpoint displayed again.
A. Setting/Temperature Display
The LPC is designed to control the temperature of a room any-
where from 32-86°F (0-30°C). Pressing the + or - will increase
or decrease the desired temperature for the room to be heated
by 0.5° (in either °C or °F).
After 5 seconds the Setpoint Temperature will switch to dis-
play the intake temperature of the room.
!
NOTE: Pressing the + and - at the same time will toggle
between °C and °F.
2 www.dimplex.com
Wiring Diagram
position to allow free expansion and contraction of housing
and to ensure quiet operation.
5. Replace covers on unit.
!
NOTE: Install the center cover rst, by installing the top
rst, then the bottom.
Usage of Multiple Smart Baseboards
Multiple Smart Baseboards can be wired in parallel on a single
circuit. To use/control multiple Smart Baseboards from a single
source, a CONNEX
TM
controller can be used. By synchroniz-
ing one CONNEX
TM
controller to multiple LPC’s, the controller
can control all of the heaters from one location. Each compo-
nent must be within 15m (45ft) of any other component in the
system for the entire system to operate.
Loading ...
Loading ...