Loading ...
Loading ...
Loading ...
3-16
E
EJU01835
Switches
Check the start switch 1, the engine stop
switch 2, and the engine shut-off switch 3
for proper operation.
To check these switches, place the water-
craft in the water to provide adequate cooling.
Start the engine, and then pull the engine
shut-off cord 5 to remove the clip 4 from the
engine shut-off switch. Verify that the engine
stops immediately. (See pages 2-7 to 2-9 for
information on proper operation of the start
switch, the engine stop switch and the engine
shut-off switch.)
EJU01806
Cooling water pilot outlet
Check that water comes out from the port
(left) pilot water outlet while the engine is
running and the watercraft is in the water.
(See page 2-9 for further instructions.)
EJU01246
Multifunction meter
Check the operation of the multifunction
meter. (See pages 2-15 to 2-19 for operation
of the meter.)
UF1B11.book Page 16 Friday, November 8, 2002 3:22 PM
Loading ...
Loading ...
Loading ...