Loading ...
Loading ...
Loading ...
December 2014
Page 16
C0530D through C1030D
Remote Condenser Models - User Manual
Adjustments
Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge thickness
adjustment screw in 1/8 turn increments CW
to increase bridge thickness. Rotate CCW to
decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain and evaporator cover to their
normal positions.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to automatically adjust
the amount of water purged per cycle. The setting
can be changed to one of 5 manual settings or left on
automatic.
Purge
setting
1 - Minimum 2 - Moderate 3 - Standard 4 - Heavy 5 - Maximum A - Automatic
Water
Type
RO water or
equivalent,
TDS less than
35
Low TDS non
- RO water
Setting for
typical water
High TDS
water
Very High
TDS water,
greater than
256
Factory setting,
suitable for
any water with
conductivity not
less than 10
microSiemens/cm.
To set:
1. Switch the machine OFF by holding the Off button in until a number or the letter A shows on the display.
2. Press and release the On button repeatedly until the number on the display corresponds to the desired
setting.
3. Press and release the Off switch again to return to the normal control state.
Too Big
Just Right
small cube
Just Right
med cube
Too Small
Ice Bridge Thickness Check
1/8 - 3/16 “
bridge
Bridge Thickness Adjustment Mechanism
Loading ...
Loading ...
Loading ...