Loading ...
Loading ...
Loading ...
Medium weight automotive engine oil
Assembly Procedure
Two people will be required for this procedure.
TIP: Read and understand all instructions thoroughly before assembling this unit. Check all items carefully.
If there is damage, see the Customer Service section of this manual for proper procedure to return, replace,
or reorder parts.
If machine CAN be moved without adding or removing weight stack
Two people will be required for this procedure
1. Move to desired location.
2. Remove shipping cones using a 3/4" socket or wrench.
3.
Remove bolt from shipping cone with hammer. Recycle cone.
4. Attach foot pads to each foot of frame.
Securely anchor machine to floor
Owner should not allow equipment to be used until it is properly anchored as described below.
WARNING: Anchoring equipment:
To maximize stability and eliminate rocking, tipping, or falling over, equipment must be anchored to a
solid, level surface, utilizing all anchoring holes provided.
Fasteners must have a minimum of 500 lbs. tensile capacity. Cybex recommends .3/8” grade 2 bolts or
better. A minimum pull force of 220 lbs/100 kgs is required for each anchor position.
If leg frames do not contact surface, DO NOT pull down with anchors. Shim any leg or frame not in contact
with surface using flat washers.
Due to the wide variation of flooring on which machines may be anchored or installed, consult with a
qualified and licensed contractor to ensure proper anchoring and installation.
Verify proper operation
If machine CANNOT be moved without adding or removing weight stack
Two people will be required for this procedure
1. Remove shipping cones using a 3/4” socket or wrench.
2.
Remove bolt from shipping cone with hammer. Recycle cone.
Disconnect belt
1. Make a note of the current belt routing and connections. This will assist you in reinstalling them properly.
Page 10 of 23
Loading ...
Loading ...
Loading ...