Loading ...
Loading ...
Loading ...
PDR 908 HP en-AU, NZ
10 11 276 500/01
Installation and anchoring
The machine must be installed on a perfectly smooth, level and firm
surface which is able to withstand the quoted loads.
The floor load created by the machine is concentrated and transferred
to the installation footprint via the machine feet.
The tumble dryer should be levelled in both directions with the aid of
the adjustable feet.
Plinth installation
The tumble dryer can be installed on a plinth (open or box plinth,
available as an optional Miele accessory) or on a concrete plinth to be
provided on site.
The quality of the concrete and its strength must be assessed
according to the machine load. Ensure that any raised concrete plinth
is adequately bonded to the floor below.
Washer-dryer stack
The tumble dryer can be installed as a washer-dryer stack together
with a Miele washing machine. A stacking kit (optional accessory)
is required for this.
The stacking kit must be installed by Miele Professional Service or an
authorised Miele service technician.