Loading ...
Loading ...
Loading ...
31-2000734 Rev. 0 9
NEW CONSTRUCTION, PRE-PLANNING, OR REMODELING
NOTE: For existing instruction, skip to the next section.
FOR TOP VENTING
■Forductedinstallationthroughthetop,the10”
diameter hole for the duct in the ceiling must be
centered 6-1/4” away from the finished rear wall in the
installation space.
FOR BACK VENTING
■Forductedinstallationthroughtheback,the
10-1/2”x13-1/4” cut out for the duct in the wall must
be centered in the installation space, left to right and
located 5-7/8” above intended install height from
bottom of the hood.
Installation Preparation
6-1/4”
5-7/8”
10-1/2”x13-1/4”
Bottom of Hood
■Thehoodjunctionboxknockoutislocated10-1/2”tothe
left from center of the hood. Ensure enough wire length is
available to make electrical connection.
Loading ...
Loading ...
Loading ...