Candy FDP 299 N Ovens

User Manual - Page 14

For FDP 299 N.

PDF File Manual, 20 pages, Download pdf file

Loading ...
Loading ...
Loading ...
- Operations to be carried out to make a new connection:
• Choose the supply cord in accordance with the recommendations in the table
• The oven must be in situation as shown:
• Pass the supply cord into the clamp.
• Strip the end of each conductor of the supply cord a 10 mm length, by taking in account
the cord for the connection on the terminal block.
According to the installation and with the help of should have recovered in the first
operation, fix the conductor as shown on the chart.
• Engage the earth wire yellow/green on the earth terminal, tighten the nut and verify the
continuity of the earth.
• Secure the cable clamp.
• Fix the cover.
CABLE
Area 3 G 2,5 mm 3 G 2,5 mm
Connection to
the terminal
block
PH N
E
PH N
E
To shunt : make
a bridge with a
shunt bar
1 rst Phase
Shunt 1-2
Shunt 2-3
Neutral
Shunt 4-5
Earth
1 rst Phase
Shunt 1
Neutral
Shunt 2
Earth
IMPORTANT: Blue wire = Neutral Yellow/green wire = Earth
For the connection to the terminal block, you must:
• respect the n° 1,2,3,4, and 5,
• tighten the screws,
• do not forget to fix the earth wire (yellow/green) on the earth terminal n° 6
Loading ...
Loading ...
Loading ...