GE PNRQ21LRB Filtration System

User Manual - Page 17

For PNRQ21LRB. Also, The document are for others GE - General Electric models: PNRQ21LBN

PDF File Manual, 84 pages, Read Online | Download pdf file

PNRQ21LRB photo
Loading ...
Loading ...
Loading ...
Installation Instructions
STORAGE TANK AND STARTUP
STORAGE TANK INSTALLATION
1. Remove the protective cap from the top
of the tank.
2. Apply 2–3 wraps
of thread tape,
in a clockwise
direction, to the
tank threads.
3. Install the push-to-connect fittings on the
threaded fitting on the tank as shown.
4. Push the 3/8 red banded tubing from the
Reverse Osmosis System into the fitting
on the storage tank.
SYSTEM STARTUP PROCEDURE
CAUTION:
If installing the unit in
new construction, ensure that house plumbing
is flushed thoroughly before opening the water
supply valve.
1. Check that all tubing connections are
secure.
2. Turn on the Feed Water Supply Valve.
3. Check all connection points for leaks.
4. Follow the Sanitization procedures on
page 19.
5. After sanitization is complete, reinstall
prefilter, postfilter and Reverse Osmosis
cartridges.
6. Membrane contains a food grade
preservative. Allow the system to fill the
tank, then drain it completely four times
before using the water from the system.
7. Recheck all water connection points a few
days later to check for small leaks.
Storage
tank
Thread
tape
17
Loading ...
Loading ...
Loading ...