Loading ...
Loading ...
Loading ...
Unit Venting
Do not restrict the air flow.
The ventilation opening can either be directly over the
appliance
1
, above the cabinet and below the ceiling
2
or through a vent installed in a soffit
3
.
IMPORTANT
The clear ventilation cross-section must be at
least 31 in² (200 cm²) from the lower ventilation
opening right to the upper one.
The section below the freezer door and the floor
must not be covered.
6
I
nStallatIon
1/4" socket
22 mm
wrench
IMPORTANT
After final installation, this screw must be turned
down until it has proper floor contact to support
the hinge bracket.
Leveling the Appliance
The height can be
adjusted in front by twist-
ing the leveling feet.
Twist the adjusting bolt to set up
the back of the appliance. Align
the appliance with sides of kitchen
cabinets by adjusting leveling feet
and the supports.
Loading ...
Loading ...
Loading ...