Loading ...
Loading ...
Loading ...
49-7798 11
Installation Instructions
INSTALLATION INSTRUCTIONS
3. PREPARE THE AIR CONDITIONER
(continues)
E. Remove the ground screw from the left
VLGHRIWKHFDVH.HHSLWLQDVDIHORFDWLRQ
127(%HVXUHWRVDYHWKLVVFUHZ<RXZLOO
need them later in the installation.
F. Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or
lift on the foam discharge area.
FRONT
Do not
pull or
lift in this
area—
damage
to the
unit may
result
4. PREPARE THE CASE
C. Slide each side retainer onto the edge of each
according panel. The figure shows the orientation
of each accordion panel and side retainer assembly
relative to the case from a top view of the unit.
D. Remove the backing from the accordion seal (two
short strips). Stick one sealing strip respectively
on the left side and right side of the accordion
panels, as shown.
E. Slide the left and right accordion panels into the
top and bottom mounting rails.
F. $WWDFKWKHVLGHUHWDLQHUVWRWKHFDVHXVLQJ
type A screws.
4. PREPARE THE CASE
A. Attach the top rail gasket to the bottom of
the top rail.
B. Install the top mounting rail with 4 type A
screws from the inside of the case. Press
firmly to drive the screws into the gasket and
through the top mounting rail.
WINDOW FILLER PANEL
WINDOW FILLER PANEL
SIDE RETAINER
SIDE RETAINER
Top mounting rail
Top left
Top right
Top mounting rail
%RWWRPPRXQWLQJUDLO
Loading ...
Loading ...
Loading ...