Loading ...
Loading ...
Loading ...
Assembly Procedure
Two people will be required for this procedure.
Read and understand all instructions thoroughly before assembling this unit. Check all items carefully. If
there is damage, see the Customer Service section of this manual for proper procedure to return, replace,
or reorder parts.
If machine CAN fit through doorway
Two people will be required for this procedure
1. Move to desired location.
2. Remove shipping cones using a 3/4” socket or wrench.
3.
Remove bolt from shipping cone with hammer. Recycle cone.
4. Attach foot pads to each foot of frame.
5. If weight stack needs to be installed, follow procedure for installing weight plates and weight plate decal.
Securely anchor machine to floor
Owner should not allow equipment to be used until it is properly anchored as described below.
Anchoring equipment:
To maximize stability and eliminate rocking, tipping, or falling over, equipment
must be anchored to a solid, level surface, utilizing all anchoring holes provided.
Fasteners must have a minimum of 500 lbs. tensile capacity. Cybex recommends
.3/8” grade 2 bolts or better. A minimum pull force of 220 lbs/100 kgs is required
for each anchor position.
If leg frames do not contact surface, DO NOT pull down with anchors. Shim any
leg or frame not in contact with surface using flat washers.
Due to the wide variation of flooring on which machines may be anchored or
installed, consult with a qualified and licensed contractor to ensure proper
anchoring and installation.
Verify proper operation
If machine CANNOT fit through doorway
Two people will be required for this procedure
1. Remove shipping cones using a 3/4” socket or wrench.
2.
Remove bolt from shipping cone with hammer. Recycle cone.
Page 10 of 25
Loading ...
Loading ...
Loading ...