Faber STRTIS48WH400-B Stratus Glass

User Manual - Page 8

For STRTIS48WH400-B.

PDF File Manual, 40 pages, Download pdf file

Loading ...
Loading ...
Loading ...
8
1
Put a thick, protective covering over cooktop
to protect from damage or dirt.
Determine and clearly mark with a pencil on the
ceiling where the rangehood will be installed.
Determine and make necessary cuts for the
ductwork. The duct opening is shown on the
mounting template.
Install ductwork before mounting the hood.
Determine the proper location for the Power
Supply Cable as indicated on the template.
Use a 1 1/4" Drill Bit to make this hole. Run
the Power Supply Cable. Use caulking to seal
around the hole.
A knockout for threading through the Power
Supply from the ceiling is located on the top
of the frame. Do not connect the Power Cable
to the Wiring Box or power up the hood at this
time. Run enough power cable from the ceiling
to reach the wiring box on the hood.
Do not make any cutouts until you have decided whether this installation will be ducted or
non-duct and then plan accordingly.
DUE TO THE SIZE AND
WEIGHT OF THIS RANGE-
HOOD, THE SUPPORT MUST
BE FIRMLY ATTACHED TO
THE CEILING. For plaster or
sheet rock ceiling, the support
must be attached to the joists.
If this is not possible, a support
structure must be built behind
the plaster or sheet rock. The
manufacturer assumes no re-
sponsibility for injury or damage
caused by improper installa-
tions.
WARNING
!
Loading ...
Loading ...
Loading ...