Loading ...
Loading ...
Loading ...
5
SITE PREPARATION
This appliance has been designed to be installed directly against rear walls and side base cabinets. It
cannot be installed directly against tall side cabinets, side walls, tall appliances or base cabinets extending
beyond 24 inches [610 mm].
Side trims must be at least 11/16 inch [17.5 mm] above the adjoining counter top surfaces.
Any openings in the back wall or the floor of the installation site must be sealed.
Each gas appliance shall be located with respect to building construction and other equipment to permit
access to the appliance. Such access and clearance is necessary for cleaning and servicing.
Due to its size and weight, a rolling lift jack, air sled or pallet jack should be used to move the appliance
into position.
Do not push against the edges or sides of any appliance in an attempt to slide it into position. Although
all sharp metal parts are de-burred during the manufacturing process, serious injury could occur if the
appliance were to move suddenly while being positioned. We recommend you use gloves during the
installation process.
For optimum performance the appliance should be leveled during installation. A carpenter-type level
should be placed on the unit three ways: side to side, front to back, and diagonally.
Appliances on bullet legs may be leveled by screwing the various leg assemblies in or out. If the
appliance is installed in an island or cabinet cut-out, the edges should be shimmed with small metal
coupons.
Any opening in the wall behind the rangetop and in the floor under the rangetop should be sealed.
Loading ...
Loading ...
Loading ...