Loading ...
Loading ...
Loading ...
6
Installation Instructions
Parts List
Remove all packing materials and parts. Inspect to make sure all parts listed below are present
and in good condition:
1 double draft arm assembly (with washer)
1 CO
2
cylinder
1 CO
2
regulator
2 keg taps (American Sankey type)
1 cleaning kit
Vinyl tubing
1 stainless steel (removable) floor to protect the unit during keg insertion
1 drip tray
Hose clamps
Various screws
Before Using Your Appliance:
Remove the exterior and interior packing.
Before connecting the unit to a power source, let it stand for approximately 2 hours. This will reduce
the possibility of a malfunction in the cooling system from handling during transportation.
Clean the interior surfaces of the unit with lukewarm water using a soft cloth.
Installing the Kegerator:
Place the unit on a floor that is strong enough to support the appliance when it is fully loaded. To level
the unit, adjust the two leveling legs at the front.
Your appliance is designed to be either built-in or free-standing. Take care that the air vents at the
front of the appliance are never covered or blocked in any way.
Locate the unit away from direct sunlight and sources of heat (oven, heater, radiator, etc.). Direct
sunlight may affect the acrylic coating and heat sources may increase electrical consumption.
Extremely cold ambient temperatures may also affect the unit's performance.
Avoid locating the unit in moist areas. Too much moisture in the air will cause frost to form quickly on
the evaporator, requiring more frequent defrosting of the interior.
Plug the unit into an exclusive, properly installed and grounded wall outlet. Do not under any
circumstances cut or remove the third (ground) prong from the power cord. Any questions concerning
power and/or grounding should be directed toward a certified electrician or authorized service center.
Loading ...
Loading ...
Loading ...