Loading ...
Loading ...
Loading ...
24
Performance Checklist
—Verify cabinet size.
— Verify electrical supply and water supply
(if applicable).
— Install anti-tip device(s) and verify unit is
secure.
— Position unit in cutout, level at desired
height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
• Verify icemaker ll tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
—Align/square door(s).
— Verify drain pan is properly installed and
there are no leaks on water connection.
—Install kickplate.
— Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:__________________________
Installer’s company:_______________________
Date: ___________________________________
Loading ...
Loading ...
Loading ...