Loading ...
Loading ...
Loading ...
4 Installation Procedures
4.1 Site requirements
Select a flat, dry, and clean workbench space for the QIAreach™ eHub. Make sure that the space
is free of excessive moisture and dust, protected from direct sunlight, large temperature
fluctuations, heat sources, vibration and electrical interference. Refer to Section 9 for the weight
and dimensions of the QIAreach™ eHub and the correct operating conditions (temperature and
humidity). There should be sufficient clearance on the workbench to allow unimpeded access to
the eStick connection ports, USB port, and ON/OFF button.
Note: Before installing and using the QIAreach™ eHub, see Operating the QIAreach™ eHub to
become familiar with the QIAreach™ eHub operating conditions.
CAUTION
Do not place the QIAreach™ eHub in close proximity to sources of (C2)
strong electromagnetic radiation (e.g., unshielded intentional RF
sources), as these can interfere with proper operation. For more
information, see
FCC Compliance: Supplier’s Declaration of
Conformity.
QIAreach eHub User Manual 05/2021
15
Loading ...
Loading ...
Loading ...