Loading ...
Loading ...
Loading ...
31
EN
Wall Drilling and Bracket Fixing
As a rst step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in
which the hood is to be tted.
(A) A horizontal line A at 1083–1183 mm above the cooker top.
(B) A horizontal line B at a 40-377 mm above the horizontal line A.
(C) A horizontal line C at a 118 mm below the horizontal line A.
Mark Points
Note: The specied values are [mm].
(1) Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical
reference line. Repeat this step on the left side of the reference line and make sure
that the two points are at the same height.
(2) Mark a point (2) on the horizontal line B, 60 mm to the right of the vertical
reference line. Repeat this operation on the other side , checking that the two marks
are leveled.
(3) Mark a point (3) on the horizontal line C, 80 mm to the right of the vertical
reference line. Repeat this step on the left side of the reference line and on the
reference line itself. At the end you should have 3 points at the same height.
Fix the brackets (optional)
Drill at the marked points (1), (2), (3) using a10 mm drill bit.
Insert the Wall Plugs into the holes (1),(2), (3).
Fix the hood xing bracket with 3 screws (5x50) at the horizontal line B.
Fix the Chimney xing bracket with 2 screws (5x50) at the horizontal line C.
Loading ...
Loading ...
Loading ...