Bose CS CC 64 ACC ControlSpace CC-64 Control Center

Safety Instructions & Install Guide - Page 7

For CS CC 64 ACC.

PDF File Manual, 16 pages, Read Online | Download pdf file

CS CC 64 ACC photo
Loading ...
Loading ...
Loading ...
7
Installation
Quick start
What you will need:
The following items are needed for most installations:
- 5-gang electrical wall box
- UTP Cat-5 cable terminated with RJ45 plugs (standard Ethernet wiring)
- Ethernet hub
- Power supply (not included with the CC-64)
WARNING: The product must be connected to a limited-power (<240VA)
power supply.
Step 1: Wiring
Run a Cat-5 cable from a hub or router to the CC-64 location. Run a separate,
2-conductor power cable from the power supply location to the CC-64. In some
cases, power can be provided over the Cat-5 cable.
Step 2: Install a mounting box if necessary
The CC-64 can be installed in a rack or podium, and can be wall-mounted. For
wall-mount applications, a standard North American 5-gang electrical box is
recommended.
Step 3: Connect wires
Connect the Ethernet cable to the CC-64’s network jack (RJ45) and connect the
PC, ESP-88 and control center to the same hub or router. Connect the power
cable to the control center’s power plug (or, if using power over the Cat-5,
remove the back box and move the jumpers to the appropriate position). Insert
the unit into the electrical box and attach using the provided screws.
Step 4: Run the ControlSpace™ Designer software
You must run the ControlSpace
Designer software to configure the CC-64.
You must also have a ControlSpace Engineered Sound Processor (ESP-88)
connected for the control center to work. See the ControlSpace Designer
software user’s guide for more information.
CAUTION: The building code may require professional installation by a skilled
technician or licensed contractor.
Installation
Loading ...
Loading ...
Loading ...