Sun Joe 24V-PS8-LTE-SJG-RM 24-Volt iON+ Cordless Telescoping Pole Chainsaw Kit 8-Inch W/ 2.0-Ah Battery and Charger Certified Refurbished

User Manual - Page 12

For 24V-PS8-LTE-SJG-RM.

PDF File Manual, 24 pages, Read Online | Download pdf file

24V-PS8-LTE-SJG-RM photo
Loading ...
Loading ...
Loading ...
12
3. Remove the bar and chain from the mounting surface
(Fig. 6).
4. Remove the old chain from the bar.
5. Lay out the new saw chain in a loop and straighten
any kinks. THE SHARP SIDE OF THE TEETH MUST
FACE AWAY FROM YOU IN THE DIRECTION OF THE
CHAIN ROTATION INDICATED ON THE GUIDE BAR
. If the teeth face backwards,
turn the loop over (Fig. 7).
6. Starting at the tip, mount the chain drive links into the
bar groove, leaving a loop at the back of the bar. The
chain will loosely t until it is placed on the sprocket
(Figs. 8 – 9).
NOTE: Make certain of the direction of the chain
.
If the chain is mounted
backwards, the saw will vibrate abnormally and will not cut.
7. Hold the chain in position on the bar and place the loop
around the sprocket. Fit the bar ush against the mounting
surface so that the bar studs are in the long slot of the bar
and the adjusting pin is in the chain tension pin hole
(Fig. 10).
8. Replace the chain/sprocket end cover by positioning the
cover onto the saw head. Tighten the end cover knob,
but leave the bar free to move for tension adjustment.
Put back the hex bolt by screwing it clockwise with the
hex key wrench.
9. Remove all slack from the chain by turning the chain
tensioner ring clockwise until the chain seats snugly
against the bar with the drive links in the bar groove
(Fig. 11).
R
Chain/sprocket
end cover
Fig. 5
R
Cutting chain
Guide bar
Fig. 6
Chain rotation
Sharp cutting edge
Chain drive link
Fig. 7
R
Fig. 8
R
Loop
Fig. 9
R
Sprocket
Adjusting pin
Chain tension
pin hole
Fig. 10
Loading ...
Loading ...
Loading ...