l To AVOID damaging gas, power or other underground utility lines,
contact underground utility locating companies BEFORE digging more
than 18 inches (46 cm) deep.
l ALWAYS wear protective gloves and eye protection when changing
the battery or working around the battery compartment.
Installation Tips
Do's
l Weld a horizontal bar across entire gate on any installation for
strength. Make sure that the operator is mounted level or it will not
function properly.
l Make sure there is slack in the operator cable.
l The operator can be mounted on top of the gate frame.
l The operator must be installed at least 12" (30 cm) from the ground.
Don'ts
l DO NOT install upside down.
l DO NOT install next to sprinklers or any area that may expose the
bottom of operator to water.
l DO NOT install on uphill or downhill gates.
l DO NOT install on ANY pedestrian passageways, doorways, or gates.
l DO NOT over-bend the operator cable. Doing this will cause the wires to
eventually break.
l DO NOT weld the crossbar on just a few pickets, or they could bend.