Haier GDG480BW 6.5 Cu. Ft. Capacity Top-Load Gas Dryer

User Manual - Page 18

For GDG480BW.

PDF File Manual, 98 pages, Download pdf file

Loading ...
Loading ...
Loading ...
16
2. Insert a UL listed strain relief into the mounting bracket hole. Position the strain
relief so that one tab is pointing up and one tab is pointing down. Tighten the
strain relief screws just enough to hold the two halves together.
Tab
Strain Relief
A
B
3. Insert a power cord into the strain relief. Take care to ensure that the wire
insulation of the power cord is inside the strain relief.
4. Connect power cord wires following Part A for a 4-wire power cord
connection or Part B for a 3-wire power cord connection.
4-wire (recommended) if your home has a 4-wire receptacle (NEMA
14-30 type SRDT or ST):
3-wire (if 4-wire is not available) if your home has a 3-wire receptacle
(NEMA 10-30 type SRDT):
CAUTION: A 4-wire connection is required for mobile homes and
where local codes do not permit the use of 3-wire connections.
5. Tighten strain relief screws.
6. Be sure that none of the wires are touching the dryer drum inside the dryer
cabinet.
7. Reinstall the terminal block cover.
PART A - 4-WIRE POWER CORD
A
B
C
F
E
G
D
Ground Screw (Green)
Terminal Block Screw
Neutral-Ground Jumper Wire
(Green)
Power Cord Ground Wire (Green)
Power Cord Neutral Wire (White)
Power Cord Line Wires (One Red;
One Black)
Power Cord
Loading ...
Loading ...
Loading ...