Loading ...
Loading ...
Loading ...
subzero.com
|
9
INSTALLATION
Water Line
Purge the water line prior to nal connection to the unit. This
will remove any debris that may be present in the tubing
from installing the new water line. Connect the plastic tubing
from the unit to the house water supply line with the tting
connection kit provided. Check all water line ttings for
leaks.
Locate the water line in the notch as shown in the illustration
below.
IMPORTANT NOTE: If a reverse osmosis system used, it is
recommended that the water ltration system be bypassed
by removing the lter.
IMPORTANT NOTE: Water lines can not be exposed to
freezing temperatures.
WATER LINE
CONNECTION
NOTCH
Water line.
Alignment
DEPTH ADJUSTMENT
Adjust the depth of the unit to t ush with surrounding
cabinetry. Follow these steps for a precision t:
1 Place decorative panel on a protected work surface.
Place the panel thickness gauge next to the panel to
determine which notch corresponds with the panel thick-
ness. Refer to the illustration below. Once the proper
notch has been determined, mark that notch with a
marker.
2 With the door closed, position the top of the unit using
the panel thickness gauge. Refer to the illustration
below. Insert a #8 x
1
/2" stainless steel screw above the
hinge, then insert a #8 x
1
/2" pan head screw on the
handle side of the unit. For narrower units, the door may
need to be opened to access the handle side screw
location. Repeat the process to align the bottom.
ANCHORING
Once the top and bottom are aligned, verify doors and
drawers open properly, then install remaining screws in each
side trim.
PANEL THICKNESS
GAUGE
FRONT OF
UNIT
CABINETRY
FACE
FRAME
SCREW
SIDE TRIM
Panel thickness.
Unit depth.
Loading ...
Loading ...
Loading ...