Loading ...
Loading ...
Loading ...
49-5000567 Rev. 0 11
ENGLISH
4. PREPARE THE CASE
NOTE: Attach curtains to the air conditioner before
placing the air conditioner in the window.
A. Install top mounting rail (if not already installed) with
four type A screws.
B. Slide left-hand curtain assembly into left end of top
and bottom mounting rail. Repeat for right hand
curtain assembly.
C. Fasten curtain retainer strips to the sides of the
outer case with four type A screws on each side.
holes. Use 4 type B screws to secure the side panels
in place.
3/8” Self Tapping
Screws
3/8” Self Tapping
Screws
Top Channel
Side Curtains
6 INSTALL OUTER CASE IN WINDOW
A. Place outer case in window. Lower sash until it rests
behind front flange of top mounting rail. Bottom
mounting rail must rest behind window sill.
B. Expand the curtain panels to fill the window. Secure
with type C wood screw in top and bottom corners.
If needed, use drill and 1/8” bit to drill pilot holes for
the screws.
C. Use three type C screws to secure the case to the
window sill. Drill pilot holes if necessary.
Bottom rail
Top rail
Window sash
SILL
About
ÛÛ
1” Wood Screws
(2) 1” Wood
Screws
5. PREPARE WINDOW FOR
INSTALLATION
A. Measure the width of the window opening.
B. Mark the center line on the inside windowsill.
C. Apply the weather seals provided to the bottom,
top and sides of the window to the seal around the
perimeter of the air conditioner.
B
A
Cut and apply
weather strip to
front and bottom
edge of window
frame.
Cut and apply
weather strip to
back edge of
the window sill.
Cut and apply a
weather strip to
side of the curtain
frame (one on
each side).
A. Width of window opening
B. Center line
INSTALLATION INSTRUCTIONS
Loading ...
Loading ...
Loading ...