Loading ...
Loading ...
Loading ...
Page 13
SERVICE (cont.)
10860.1 071598
THERMAL CUT-OFFS
FIG. 8 THERMAL CUT-OFFS
P1262
Location:
The thermal cut-offs are located inside the hood
connected to the tank heater terminals.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the thermal cut-off from the terminal
on the black lead of the ready light wiring harness.
3. With an ohmmeter, check for continuity across the
thermal cut-off terminals.
If continuity is present as described, the thermal cut-
off is operating properly.
If continuity is not present as described, replace the
thermal cut-off.
4. Disconnect the thermal cut-off from the tank heater
termnal and the red lead from the main wiring
harness.
5. Check for continuity across the thermal cut-off
terminals.
If continuity is present as described, the thermal cut-
off is operating properly.
If continuity is not present as described, replace the
thermal cut-off.
Removal and Replacement:
1. Disconnect the thermal cut-off from the terminal
on the black lead from ready light harness and the
black lead from the control thermostat or the tank
heater terminal and the red lead from the main
harness.
2. Remove the white lead from the tank "keep warm"
heater from the thermal cut-off terminal.
3. Install new thermal cut-off.
4. Refer to Fig. 9 when reconnecting wires.
FIG.9 THERMAL CUT-OFF TERMINALS
P1389
BLK Lead
BLK Lead from
Control Thermostat
Thermal Cut-Off
BLK Lead from
Ready Light
Harness
Tank Heater Terminals
WHI from "Keep Warm"
Heater
RED Lead from
Main Harness
Thermal Cut-Off
Loading ...
Loading ...
Loading ...