GE - General Electric GBS22KBRBB GE ENERGY STAR 22.3 Cu. Ft. Bottom-Freezer Door Refrigerator

User Manual - Page 21

For GBS22KBRBB.

PDF File Manual, 124 pages, Read Online | Download pdf file

GBS22KBRBB photo
Loading ...
Loading ...
Loading ...
Installation Instructions
21
SET THE CONTROLS
Set the controls to the recommended
setting.
8
REMOVE PACKAGING
START ICEMAKER
(icemaker models)
A) Remove all tape, foam and protective
packing from shelves and drawers.
B) Remove the tie downs from the freezer
baskets.
C) Place half width basket onto drawer
slides. See About the freezer section
for instructions.
Set the icemaker power switch to the
I (on) position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.
9
Power
switch
Loading ...
Loading ...
Loading ...