Loading ...
Loading ...
Loading ...
8
Install In-Line Smart Kit - Optional
NOTE: Your range hood can work with either an internal or an
inline (external) blower motor system. An optional In-Line Smart
Kit (purchased separately) allows the blower motor that comes
with this range hood to be installed in a location other than
inside the range hood cavity.
CAUTION: To reduce the risk of fire and electric shock, install
this range hood only with the In-Line Smart Kit manufactured
by Whirlpool, Part Number W10692945.
For installation see the In-Line Smart Kit installation instructions.
See the “Assistance or Service” section to order.
Assemble Range Hood
1. Install transition on top of hood (if removed for shipping)
with 2 - 3.5 x 9.5 mm sheet metal screws.
2. Position the 4 vertical supports (A) with the notches
at the bottom and attach to the range hood using
16 - 4.2 x 8 mm screws.
3. Attach the horizontal support (B) using 8 -
4.2 x 8 mm screws.
4. Attach a second set of vertical supports (A) and set
the vertical height (B). See “Installation Dimensions”
in the “Location Requirements” section to help
determine the desired dimension for vertical height “B.”
Secure with 16 - 4.2 x 8 mm T20
®
screws.
Install Range Hood
Non-Vented (recirculating) Installation
1. Attach the air deflector to the upper horizontal support
using 4 mounting screws.
2. Measure the length of 6" (15.2 cm) duct needed
to connect the transition to the deflector.
NOTE: Vent should fit up inside the deflector
1" (2.5 cm) minimum.
3. Install vent between the transition and the deflector.
NOTE: To make vent installation easier, temporarily remove
the deflector from the chimney support bracket and replace
after vent section is in place.
4. Seal all connections with vent clamps. Continue
with “Range Hood Installation” in this section.
Range Hood Installation
1. Using 2 or more people, lift the range hood assembly
and attach it by snapping the vertical supports to the
spring clips in the upper horizontal support bracket
that is mounted to the ceiling.
NOTE: The range hood assembly must be held in place
while you are installing the screws in the next step.
2. Install 16 - 4.2 x 8 mm screws and tighten to secure.
Connect Vent System
1. Install vent system.
2. Push duct over the exhaust outlet. Seal all connections
with vent clamps.
3. Use caulk to seal all openings.
B
A
A. Vent transition
B. 3.5 x 9.5 mm screw
B
A
A
C
C
A. Vertical supports
B. Horizontal support
C. Notched end
B
A
A
A. Vertical supports
B. Vertical height
B
B
A
A. Deflector
B. Mounting screws
A
A. Mounting screws
Loading ...
Loading ...
Loading ...