
Air Switch (GDAS 01)
Installation Steps
1. Thread the air tube through the
air tube as shown and tighten
the knob.
2. Fit the air tube onto the start
button and tighten.
3. Fit the air tube onto the
power box and tighten.
4. The correct connection of the
air switch is shown in the picture.
Installation Position
1. Food waste disposer
2. Air switch power box
3. Air switch button
4. Air switch air tube
5. Air switch power cord
6. Wall reserved socket
7. Disposer power cord
1.1”(28mm)
1.3”~1.6”(32~40mm)
Hole Size
1
2
3
5
7
6
4
