Sonance 60039 Legacy Product

Product's Documents

Below are documents related to this product, you can read online or download:
Installation Instruction
  • PBF Pre-Construction Board JAMES Installation Guide Manual. - (English) Read Online | Download pdf
  • QX JAMES Installation Guide. - (English) Download
  • SPLCS JAMES Installation Guide. - (English) Download
  • QX In-Wall SoundBar Installation 20190710. - (English) Download
Specification
  • 60039 SPLCS QX-SPL5-CS JAMES Data sheet. - (English) Download
Other Documents
  • QX QXQT UTB-NYB. - (English) Download
  • 60039 SPLCS QX-SPL5-CS JAMES cad file.pdf - (English) Download
60039 photo

PBF Pre-Construction Board JAMES Installation Guide Manual.

This is the main product document for model 60039.

The file format is pdf, 2 pages, you can download this manual here .

background
INSTALLATION GUIDE
PBF Pre-construction Board Installation guide
PBF (
FLUSH
) PRE-CONSTRUCTION BOARD INSTALLATION GUIDE
Before installing the PBF pre-construction board,
we recommend securing two horizontal studs, at
PBF board height, between the vertical studs of
the chosen installation location to add additional
support.
1
2
Measure the PBF board and make an outline of the
board on a new panel of sheet rock.
4
3
After this has been done, ensure that the
board is level before fully securing it to the
wall studs.
Lay the frame panel of sheet rock over the PBF
board and fasten the frame to studs of the wall.
6
5
Cut along the traced path to make a frame for
the pre-construction board.
Once the board has been properly leveled, fasten
the PBF board to the vertical and horizontal studs.
background
James Loudspeaker | 535 Airpark Road, Napa, CA 94558 | 707.265.6343 | www.JamesLoudspeaker.com
®
20171027
PBF PRECONSTRUCTION BOARD INSTALLATION GUIDE
8
After the speaker installation is completed, the
grille will be flush with the wall.
Mount the speaker bracket to the wall, and begin
the speaker installation process.
7
8
After you finish the mudding process,the inner
plug can now be removed and sanding can be
performed to remove any unwanted surface
features.
Now, cover the seams around the board with
mesh tape, and begin the mudding process.
Make sure to apply mud up to the lip of the PBF
board.
7
10
9

Specifications

Indexed Terms: Speaker, In-wall

Sonance 60039 Questions and Answers

Questions and Answers

Related Products