Goodman GRVT960803BN GRVT96 Gas Furnace 96% AFUE Variable-Speed Upflow/Horizontal

Product's Documents

Below are documents related to this product, you can read online or download:
Installation Instruction Other Documents
GRVT960803BN photo

Installation Guide

This is the main product document for model GRVT960803BN.

The file format is pdf, 56 pages, you can download this manual here .

background
Installation Instructions for
*DVT96* & *RVT96* Two-Stage Gas Furnace
(Type FSP CATEGORY IV Direct or Non Direct Vent Air Furnace)
(Type FSP CATÉGORIE IV Direct ou four á air soufflé non direct)
IOG-2044
03/2024
19001 Kermier Rd., Waller, TX 77484
www.goodmanmfg.com • www.amana-hac.com
© 2024 Daikin Comfort Technologies Manufacturing, L.P.
is a registered trademark of Maytag Corporation or its related companies
and is used under license. All rights reserved.
The precautions listed in this Installation Manual are
intended as supplemental to existing practices. However, if
there is a direct conict between existing practices and the
content of this manual, the precautions listed herein take
precedence.
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
Installer:
Ax all manuals
adjacent to the unit.
These furnaces comply with requirements embodied
in the American National Standard/National Standard
of Canada ANSI Z21.47•CSA-2.3 Gas Fired Central
Furnaces.
DO NOT LIFT
PRODUCT USING
HEAT EXCHANGER
Do not bypass safety devices.
WARNING
Only personnel that have been trained to install, adjust,
service, maintenance or repair (hereinafter, “service”)
the equipment specified in this manual should service the
equipment.
This equipment is not intended for use by persons
(including children) with reduced physical, sensory or
mental capacities, or lack of experience and knowledge,
unless they have been given supervision or instruction
concerning use of the appliance by a person responsible
for their safety.
Children should be supervised to ensure that they do not
play with the equipment.
The manufacturer will not be responsible for any injury
or property damage arising from improper supervision,
service or service procedures. If you service this unit, you
assume responsibility for any injury or property damage
which may result. In addition, in jurisdictions that require
one or more licenses to service the equipment specified in
this manual, only licensed personnel should service the
equipment. Improper supervision, installation, adjustment,
servicing, maintenance or repair of the equipment specified
in this manual, or attempting to install, adjust, service
or repair the equipment specified in this manual without
proper supervision or training may result in product
damage, property damage, personal injury or death.
WARNING
This furnace may be paired with a cooling unit that uses R-32
Refrigerant. If the refrigeration unit paired with this furnace
does not use R-32, The R-32 Function in the furnace control
board needs to be turned off. Please see the electrical
and the R-32 sections for more details. Refrigerant
systems other than 410A or R32 may require an additional
mitigation control board. refer to the installation manual
of the indoor evaporator coil to determine installation
requirements for that supplier’s refrigerant detection
system.
WARNING
background
2
Startup Procedure & Adjustment ............................ 38
Normal Sequence of Operation ............................... 42
Safety Circuit Description ....................................... 42
Troubleshooting ......................................................... 43
Maintenance ................................................................. 44
Filters ............................................................................ 44
Before Leaving an Installation ................................ 44
Repair and Replacement Parts ................................. 44
Menu Options ................................................................ 45
Status Codes ................................................................ 46
Troubleshooting Chart ............................................. 47
Wiring Diagram ............................................................ 52
Start-Up Checklist ...................................................... 53
SAFETY CONSIDERATIONS
Adhere to the following warnings and cautions when
installing, adjusting, altering, servicing, or operating the
furnace. To ensure proper installation and operation,
thoroughly read this manual for specics pertaining to the
installation and application of this product.
This furnace is manufactured for use with natural gas. It
may be eld converted to operate on L.P. gas by using the
appropriate L.P. conversion kit listed in the PROPANE
GAS/HIGH ALTITUDE INSTALLATIONS section of this
manual
Install this furnace only in a location and position
as specied in LOCATION REQUIREMENTS &
CONSIDERATIONS section and INSTALLATION
POSITIONS section of this manual.
Provide adequate combustion and ventilation air to the
furnace as specied in COMBUSTION & VENTILATION
AIR REQUIREMENTS section of this manual.
Combustion products must be discharged to the outdoors.
Connect this furnace to an approved vent system only, as
specied in VENT/FLUE PIPE & COMBUSTION AIR PIPE
section of this manual.
Never test for gas leaks with an open ame. Use a
commercially available soap solution made specically for
the detection of leaks to check all connections, as specied
in GAS SUPPLY AND PIPING section of this manual.
Always install a furnace to operate within the furnace’s
intended temperature-rise range with a duct system which
has external static pressure within the allowable range, as
specied on the furnace rating plate and OPERATIONAL
CHECKS section of these instructions.
A gas-red furnace for installation in a residential
garage must be installed as specied in the LOCATION
REQUIREMENTS AND CONSIDERATIONS section of
this manual.
This furnace may be used as a construction site heater
only if certain conditions are met. These conditions are
listed in the Product Application section.
TABLE OF CONTENTS
Safety Considerations ................................................. 2
Location Requirements & Considerations ............... 5
Combustion & Ventilation Air Requirements........... 8
Installation Positions .................................................. 8
Horizontal Applications & Considerations ............ 10
Vent/Pipe and Combustion Air .................................. 11
Special Instructions for Products Installed
in the State of Massachusetts ............................ 17
Condensate Drain Lines & Drain Trap ..................... 18
R-32 Information ......................................................... 23
Gas Supply and Piping ................................................ 24
Propane Gas/High Altitude Installations .............. 24
Duct Work .................................................................... 27
Electrical Connections ............................................ 30
Accessories ................................................................. 36
This device, which was assembled by Daikin Comfort Technologies
Manufacturing, L.P., contains a component that is classied as an
intentional radiator. This intentional radiator has been certied by the
FCC: FCC ID QOQBGM111. And this international radiator has an
Industry Canada ID: IC 5123A-BGM111.
This device complies with Part 15 of the FCC’s Rules. Operation of this
device is subject to two conditions:
(1) This device may not cause harmful interference; and
(2) This device must accept any interference received, including
interference that may cause undesirable operation.
And this device meets the applicable Industry Canada technical
specications.
The manufacturer of the intentional radiator (model no. BGM111) is
Silicon Laboratories Finland Oy, which can be contacted by calling 617-
951-0200. (www.silabs.com)
Daikin Comfort Technologies Manufacturing, L.P. may be contacted by
calling 713-861-2500, or at 19001 Kermier Rd., Waller TX 77484. (www.
daikincomfort.com)
NOTE: This equipment has been tested and found to comply with
the limits for a Class B digital device, pursuant to part 15 of the FCC
Rules. These limits are designed to provide reasonable protection
against harmful interference in a residential installation. This equipment
generates, uses and can radiate radio frequency energy and, if not
installed and used in accordance with the instructions, may cause
harmful interference to radio communications. However, there is no
guarantee that interference will not occur in a particular installation. If
this equipment does cause harmful interference to radio or television
reception, which can be determined by turning the equipment o󰀨 and
on, the user is encouraged to try to correct the interference by one or
more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
- Connect the equipment into an outlet on a circuit di󰀨erent
from that to which the receiver is connected.
- Consult the dealer or an experienced radio/TV technician for
help.
This equipment complies with FCC radiation exposure limits. To ensure
compliance, human proximity to the antenna shall not be less then
20cm during normal operations.
Changes for modications not expressly approved by the party
responsible for compliance could void the user’s authority to operate the
equipment.
background
3
CAUTION
FROZEN AND BURST WATER PIPE HAZARD
Failure to protect against the risk of freezing may result in
property damage.
Special precautions MUST be made if installing furnace
in an area which may drop below freezing. This can cause
improper operation or damage to equipment. If the furnace
environment has the potential of freezing, the drain trap
and drain line must be protected. The use of accessory drain
trap heaters, electric heat tape and/or RV antifreeze is
recommended for these installations.
WARNING
To prevent personal injury or death due to improper
installation, adjustment, alteration, service or maintenance,
refer to this manual. For additional assistance or
information, consult a qualified installer, servicer agency
or the gas supplier.
WARNING
If the information in these instructions is not followed
exactly, a fire or explosion may result causing property
damage, personal injury or loss of life.
- do not store or use gasoline or other flammable vapors
and liquids in the vicinity of this or any other appliance.
- WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
• Do not touch any electrical switch; do not use any
phone in your building.
• Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions. If
you cannot reach your gas supplier, call the fire
department.
- Installation and service must be performed by a qualified
installer, service agency or the gas supplier.
Failure to follow the safety warnings exactly could
result in serious injury, death or property damage.
Never test for gas leaks with an open flame.
Use a commercially available soap solution made
specifically for the detection of leaks to check all
connections. A fire or explosion may result causing
property damage, personal injury or loss of life.
WARNING
FIRE OR EXPLOSION HAZARD
AVERTISSEMENT
RISQUE D’INCENDIE OU D’EXPLOSION
Si les consignes de sécurité ne sont pas suivies à la lettre,
cela peut entraîner la mort, de graves blessures ou des
dommages matériels.
Ne jamais vérifier la présence de fuites de gaz au moyen
d’une flamme nue. Vérifier tous les raccords en utilisant
une solution savonneuse commerciale conçue spécialement
pour la détection de fuites. Un incendie ou une explosion
risque de se produire, ce qui peut entraîner la mort, des
blessures ou des dommages matériels.
B10259-216
CO can cause serious illness including permanent brain
damage or death.
Advertencia especial para la instalación de calentadores ó manejadoras
de aire en áreas cerradas como estacionamientos ó cuartos de servicio.
B10259-216
El monóxido de carbono puede causar enfermedades severas
como daño cerebral permanente ó muerte.
Las emisiones de monóxido de carbono pueden circular a través
del aparato cuando se opera en cualquier modo.
B10259-216
RISQUE D'EMPOISONNEMENT AU
MONOXYDE DE CARBONE
Le monoxyde de
des
carbone peut causer des maladies graves telles que
dommages permanents au cerveau et meme la mort.
Cette ventilation est nécessaire pour éviter le danger d'intoxication
au CO pouvant survenir si un appareil produisant du monoxyde
de carbone continue de fonctionner au sein de la zone confinée.
background
4
WARNING
Should overheating occur or the gas supply fail to shut
off, turn off the manual gas shutoff valve external to the
furnace before turning off the electrical supply.
To The Installer
Before installing this unit, please read this manual
thoroughly to familiarize yourself with specic items which
must be adhered to, including but not limited to: unit
maximum external static pressure, gas pressures, BTU
input rating, proper electrical connections, circulating air
temperature rise, minimum or maximum CFM.
WARNING
To prevent property damage, personal injury or death due to
fire, do not install this furnace in a mobile home, trailer, or
recreational vehicle.
Product Application
Furnace Alone
- - -
Furnace + 1 Stage Non-Communicating A/C
Furnace + 2 Stage Non-Communicating A/C
Furnace + 1 Stage Non-Communicating H/P
Furnace + 2 Stage Non-Communicating H/P
Furnace + Communicating A/C
Furnace + Communicating H/P
Furnace +
Communicating A/C Inverter
Furnace + Communicating H/P Inverter
VALID EQUIPMENT COMBINATIONS
Table 1
This furnace is primarily designed for residential home-
heating applications. It is NOT designed or certied for
use in mobile homes, trailers or recreational vehicles.
Neither is it designed or certied for outdoor applications.
The furnace must be installed indoors (i.e., attic space,
crawl space, or garage area provided the garage area is
enclosed with an operating door).
This furnace can be used in the following non-industrial
commercial applications: schools, o󰀩ce buildings,
churches, retail stores, nursing homes, hotels/motels,
common or o󰀩ce areas. In such applications, the furnace
must be installed with the following stipulations:
• It must be installed per the installation instructions
provided and per local and national codes.
• It must be installed indoors in a building constructed
on site.
• It must be part of a ducted system and not used in a
free air delivery application.
• It must not be used as a “make-up” air unit.
WARNING
Heating unit should not be utilized without reasonable,
routine, inspection, maintenance and supervision. If the
building in which any such device is located will be vacant,
care should be taken that such device is routinely inspected,
maintained and monitored. In the event that the building
maybe exposed to freezing temperatures and will be vacant,
all water-bearing pipes should be drained, the building
should be properly winterized, and the water source closed.
In the event that the building may be exposed to freezing
temperatures and will be vacant, any hydronic coil units
should be drained as well and, in such case, alternative heat
sources should be utilized.
WARNING
To prevent possible property damage, personal injury or
death due to electrical shock, the furnace must be located
to protect the electrical components from water.
WARNING
Possible property damage, personal injury or death due to
fire, explosion, smoke, soot, condensation, electrical shock
or carbon monoxide may result from improper installation,
repair operation, or maintenance of this product.
Shipping Inspection
All units are securely packed in shipping containers
tested according to International Safe Transit Association
specications. The carton must be checked upon arrival
for external damage. If damage is found, a request for
inspection by carrier’s agent must be made in writing
immediately.
The furnace must be carefully inspected on arrival for
damage and bolts or screws which may have come loose
in transit. In the event of damage the consignee should:
1. Make a notation on delivery receipt of any visible
damage to shipment or container.
2. Notify carrier promptly and request an inspection.
3. With concealed damage, carrier must be notied as
soon as possible - preferably within ve days.
4. File the claim with the following support documents
within a nine month statute of limitations.
• Original or certied copy of the Bill of Lading, or
indemnity bond.
• Original paid freight bill or indemnity in lieu
thereof.
• Original or certied copy of the invoice, showing
trade and other discounts or reductions.
• Copy of the inspection report issued by carrier’s
representative at the time damage is reported to
carrier.
The carrier is responsible for making prompt inspection of
damage and for a thorough investigation of each claim.
The distributor or manufacturer will not accept claims from
dealers for transportation damage.
background
5
NOTE: The Commonwealth of Massachusetts
requires that the following additional
requirements must also be met:
• Gas furnaces must be installed by a licensed plumber
or gas tter.
• A T-handle gas cock must be used.
• If the unit is to be installed in an attic, the passageway
to and the service area around the unit must have
ooring.
To ensure proper furnace operation, install, operate
and maintain the furnace in accordance with these
installation and operation instructions, all local
building codes and ordinances.
In their absence, follow the latest edition of the National
Fuel Gas Code (NFPA 54/ANSI Z223.1), and/or CAN/CSA
B149.1-15 Installation Codes, local plumbing or waste
water codes, and other applicable codes.
A copy of the National Fuel Gas Code (NFPA 54/ANSI
Z223.1) can be obtained from any of the following:
American National Standards Institute
25 West 43rd Street, 4th Floor
New York, NY 10036
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
CSA International
8501 East Pleasant Valley
Independence, OH 44131
The rated heating capacity of the furnace should be greater
than or equal to the total heat loss of the area to be heated.
The total heat loss should be calculated by an approved
method or in accordance with “ASHRAE Guide” or “Manual
J-Load Calculations” published by the Air Conditioning
Contractors of America.
A copy of the CAN/CSA B149.1-15 Installation Codes can
also be obtained from:
CSA International
178 Rexdale Boulevard
Etobicoke, Ontario, Canada M9W 1R3
LOCATION REQUIREMENTS &
CONSIDERATIONS
Follow the instructions listed below and the guidelines
provided in the Combustion and Ventilation Air
Requirements section when selecting a furnace location.
WARNING
To prevent possible equipment damage, property damage,
personal injury or death, the following bullet points must
be observed when installing this unit.
• It must be installed as a two-pipe systems for
combustion air.
• All other warranty exclusions and restrictions apply
This furnace is an ETL dual-certied appliance and is
appropriate for use with natural or propane gas
NOTE: If using propane, a propane conversion kit is
required.
Dual certication means that the combustion air inlet pipe
is optional and the furnace can be vented as a:
Non-direct vent (single pipe) central forced air furnace in
which combustion air is taken from the installation area or
from air ducted from the outside or,
Direct vent (dual pipe) central forced air furnace in which
all combustion air supplied directly to the furnace burners
through a special air intake system outlined in these
instructions.
NOTE: This furnace may be used as a construction
site heater ONLY if all of the following
conditions are met:
• The vent system is permanently installed per these
installation instructions.
• A room thermostat is used to control the furnace.
Fixed jumpers that provide continuous heating
CANNOT be used and can cause long term
equipment damage. Bi-metal thermostats, or any
thermostat a󰀨ected by vibration must not be used
during construction.
• Return air ducts are provided and sealed to the
furnace.
• A return air temperature range between 60ºF (16ºC)
and 80ºF (27ºC) is maintained.
• MERV 11 (Example P/N AMP-11-2025-45) air lter(s)
are installed in the system and inspected daily and
replaced as needed during construction and upon
completion of construction.
• The input rate and temperature rise are set per the
furnace rating plate.
• The furnace must be installed as a two pipe system,
using 100% outside air for combustion during
construction.
• The furnace heat exchanger, components, duct
system, air lters and evaporator coils are thoroughly
cleaned following nal construction clean up by a
qualied person.
• All furnace operating conditions (including ignition,
input rate, temperature rise and venting) are veried
by a qualied person according to these installation
instructions.
• Furnace doors must be in place on the furnace while
the furnace is operating in any mode.
• Damage or repairs due to failure to comply with these
requirements are not covered under the warranty.
background
6
- chlorinated waxes or cleaners
- paint removers
- chlorine-based swimming pool chemicals
- varnishes
- water softening chemicals
- hydrochloric acid
- carbon tetrachloride
- cements and glues
-deicing salts or chemicals
- halogen type refrigerants
- antistatic fabric softeners for clothes dryers
- masonry acid washing materials
• Isolate a non-direct vent furnace if it is installed
near an area frequently contaminated by any of the
above substances. This protects the non-direct vent
furnace from airborne contaminants. To ensure that
the enclosed non-direct vent furnace has an adequate
supply of combustion air, vent from a nearby
uncontaminated room or from outdoors. Refer to the
Combustion and Ventilation Air Requirements for
details.
• If the furnace is used in connection with a cooling coil
unit, install the furnace upstream or in parallel with the
cooling coil unit. Premature heat exchanger failure
will result if the cooling unit is placed ahead of the
furnace.
• For vertical (upow or downow) applications, the
minimum cooling coil width shall not be less than
furnace width minus 1”. Additionally, a coil installed
above an upow furnace or under a counterow
furnace may be the same width as the furnace or may
be one size larger than the furnace.
Example: a “C” width coil may be installed with
a “B” width furnace.
For upow applications, the front of the coil and
furnace must face the same direction.
• If the furnace is installed in a residential garage,
position the furnace so that the burners and ignition
source are located not less than 18 inches (457 mm)
above the oor. Protect the furnace from physical
damage by vehicles.
• If the furnace is installed horizontally, ensure the
access doors are not on the “up/top” or “down/bottom”
side of the furnace.
• Do not connect this furnace to a chimney ue that
serves a separate appliance designed to burn solid
fuel.
• On Counterow Installations, the air conditioning coil
must be downstream on the supply (positive) side of
the furnace heat exchanger.
• Counterow Installation over a noncombustible oor.
Before setting the furnace over the plenum opening,
ensure the surface around the opening is smooth
and level. A tight seal should be made between the
furnace base and oor by using a silicone rubber
caulking compound or cement grout.
WARNING
Possible property damage, personal injury or death due to
fire, explosion, smoke, soot, condensation, electrical shock
or carbon monoxide may result from improper installation,
repair operation, or maintenance of this product.
• Centrally locate the furnace with respect to the
proposed or existing air distribution system.
• Ensure the temperature of the return air entering the
furnace is between 55°F and 100°F when the furnace
is heating.
• Provide provisions for venting combustion products
outdoors through a proper venting system. Special
consideration should be given to vent/ue pipe routing
and combustion air intake pipe when applicable.
Refer to Vent/Flue Pipe and Combustion Air Pipe
-Termination Locations for appropriate termination
locations and to determine if the piping system from
furnace to termination can be accomplished within
the guidelines given. NOTE: The length of ue and/
or combustion air piping can be a limiting factor in the
location of the furnace.
• Locate the furnace so condensate ows downwards
to the drain. Do not locate the furnace or its
condensate drainage system in any area subject to
below freezing temperatures without proper freeze
protection. Refer to Condensate Drain Lines and Trap
for further details.
• Ensure adequate combustion air is available for
the furnace. Improper or insu󰀩cient combustion air
can expose building occupants to gas combustion
products that could include carbon monoxide. Refer to
Combustion and Ventilation Air Requirements.
• Set the furnace on a level oor to enable proper
condensate drainage. If the oor becomes wet or
damp at times, place the furnace above the oor
on a concrete base sized approximately 1-1/2” larger
than the base of the furnace. Refer to the Horizontal
Applications and Considerations for leveling of
horizontal furnaces.
• Ensure upow or horizontal furnaces are not installed
directly on carpeting, or any other combustible
material. The only combustible material allowed is
wood.
• A special accessory subbase must be used for upright
counterow unit installations over any combustible
material (including wood). Refer to subbase
instructions for installation details. NOTE: A subbase
will not be required if an air conditioning coil is located
beneath the furnace between the supply air opening
and the combustible oor.
• Exposure to contaminated combustion air will result
in safety and performance-related problems. Do
not install the furnace where the combustion air is
exposed to the following substances:
- permanent wave solutions
- cleaning solutions (such as perchloroethylene)
- printing inks
background
7
NOTE: Installations must adhere to the clearances
to combustible materials to which this furnace
has been design certified. The minimum clearance
information for this furnace is provided on the
unit’s clearance label. These clearances must be
permanently maintained. Clearances must also
accommodate an installation’s gas, electrical,
and drain trap and drain line connections. If the
alternate combustion air intake or vent/flue
connections are used additional clearance must
be provided to accommodate these connections.
Refer to Vent/Flue Pipe and Combustion Air Pipe
for details.
Clearance in accordance with local installation
codes, the requirements of the gas supplier and the
manufacturer’s installation instructions.
Dégaugement conforme aux dodes d’installation locaux,
aux exigences du fournisseur de gaz et aux instructions
d’installation du fabricant.
NOTE: In addition to the required clearances to
combustible materials, a minimum of 24 inches
service clearance must be available in front of
the unit.
A furnace installed in a conned space (i.e., a closet or
utility room) must have two ventilation openings with a
total minimum free area of 0.25 square inches per 1,000
BTU/hr of furnace input rating. Refer to Specication
Sheet applicable to your model for minimum clearances to
combustible surfaces. One of the ventilation openings must
be within 12 inches of the top; the other opening must be
within 12 inches of the bottom of the conned space. In a
typical construction, the clearance between the door and
door frame is usually adequate to satisfy this ventilation
requirement.
Existing Furnace Removal
NOTE: When an existing furnace is removed from
a venting system serving other appliances, the
venting system may be too large to properly vent
the remaining attached appliances.
The following vent testing procedure is repro duced from
the American National Standard/National Standard of
Canada for Gas-Fired Central Furnaces ANSI Z21.47,
CSA-2.3 latest edition Section 1.23.1.
• Counterow Installation over a combustible oor.
If installation over a combustible oor becomes
necessary, use an accessory subbase (see
Specication Sheet applicable for your model for
details). A special accessory subbase must be
used for upright counterow unit installations over
any combustible material including wood. Refer to
subbase instructions for installation details. Follow the
instructions with the subbase for proper installation.
Do not install the furnace directly on carpeting, tile, or
other combustible material other than wood ooring.
NOTE: A subbase will not be required if an air
conditioning coil is installed between the supply
air opening on the furnace and the floor.)
POSITION* SIDES REAR FRONT BOTTOM FLUE TOP
Upflow 0" 0" 3" C 0" 1"
Horizontal 6" 0" 3" C 0" 6"
C = If placed on combustible floor, floor MUST be wood only.
*RVT96 MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS
(INCHES)
Table 2
POSITION* SIDES REAR FRONT BOTTOM FLUE TOP
Counterflow 0" 0" 3" NC 0" 1"
Horizontal 6" 0" 3" C 0" 6"
C = If placed on combustible floor, floor MUST be wood only.
NC = For installation on non-combustible floors only. A combustible subbase
must be used for installations on combustible flooring.
*DVT96 MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS
(INCHES)
Table 3
TOP
BOTTOM
TOP
BOTTOM
Counterflow
Figure 1
Clearances and Accessibility
NOTE: For servicing or cleaning, a 24” front
clearance is required. Unit connections
(electrical, flue and drain) may necessitate
greater clearances than the minimum clearances
listed above.
NOTE: In all cases, accessibility clearance must
take precedence over clearances from the
enclosure where accessibility clearances are
greater.
background
8
COMBUSTION & VENTILATION AIR
REQUIREMENTS
WARNING
To avoid property damage, personal injury or death,
sufficient fresh air for proper combustion and ventilation
of flue gases must be supplied. Most homes require outside
air be supplied into the furnace area.
Improved construction and additional insulation in buildings
have reduced heat loss by reducing air inltration and
escape around doors and windows. These changes have
helped in reducing heating/cooling costs but have created
a problem supplying combustion and ventilation air for
gas red and other fuel burning appliances. Appliances
that pull air out of the house (clothes dryers, exhaust
fans, replaces, etc.) increase the problem by starving
appliances for air.
House depressurization can cause back drafting or
improper combustion of gas-red appliances, thereby
exposing building occupants to gas combustion products
that could include carbon monoxide.
If this furnace is to be installed in the same space with
other gas appliances, such as a water heater, ensure there
is an adequate supply of combustion and ventilation air
for the other appliances. Refer to the latest edition of the
National Fuel Gas Code NFPA 54/ANSI Z223.1 or CAN/
CSA B149.1-15 Installation Codes or applicable provisions
of the local building codes for determining the combustion
air requirements for the appliances.
Most homes will require outside air be supplied to the
furnace area by means of ventilation grilles or ducts
connecting directly to the outdoors or spaces open to the
outdoors such as attics or crawl spaces.
INSTALLATION POSITIONS
This furnace may be installed in an upright position or
horizontal on either the left or right side panel. Do not
install this furnace on its back. For upright upow furnaces,
return air ductwork may be attached to the side panel(s)
and/or basepan. For upright counterow furnaces,
return air ductwork must be attached to the top end of
the blower compartment. For any horizontally installed
furnaces, return ductwork must be attached to the blower
compartment end of the furnace.
NOTE: Ductwork must never be attached to the
back of the furnace. Contact your distributor
for proper airflow requirements and number
of required ductwork connections. Refer to
“Recommended Installation Positions” figure
for appropriate installation positions, ductwork
connections, and resulting airflow arrangements.
The following steps shall be followed with each appliance
connected to the venting system placed in operation, while
any other appliances connected to the venting system are
not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the National Fuel Gas
Code, ANSI Z223.1 or the Natural Gas and Propane
Installation Code, CAN/CSA B149.1-15 and these
instructions. Determine that there is no blockage or
restriction, leakage, corrosion and other deciencies
which could cause an unsafe condition.
3. As far as practical, close all building doors and
windows and all doors between the space in which
the appliance(s) connected to the venting system are
located and other spaces of the building.
4. Close replace dampers.
5. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any exhaust
fans, such as range hoods and bathroom exhausts,
so they shall operate at maximum speed. Do not
operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance
being inspected in operation. Adjust thermostat so
appliance shall operate continuously.
7. Test for spillage from draft hood appliances at the
draft hood relief opening after 5 minutes of main
burner operation. Use the ame of a match or candle.
8. If improper venting is observed during any of the
above tests, the venting system must be corrected in
accordance with the National Fuel Gas Code ANSI
Z223.1/NFPA 54 and/or National Gas and Propane
Installation Code CAN/CSA B149.1-15.
9. After it has been determined that each appliance
connected to the venting system properly vents when
tested as outlined above, return doors, windows,
exhaust fans, replace dampers and any other gas
burning appliance to their previous conditions of use.
If resizing is required on any portion of the venting system,
use the appropriate table in Appendix G in the latest edition
of the National Fuel Gas Code ANSI Z223.1 and/or CAN/
CSA B149.1-15 Installation Codes.
background
9
AVERTISSEMENT
RISQUE D’INTOXICATION AU MONOXYDE DE CARBONE
Si les étapes décrites ci-dessous ne sont pas suivies pour
chacun des appareils raccordés au système de ventilation
au moment de sa mise en marche, cela peut entraîner une
intoxication au monoxyde de carbone ou la mort.
Les étapes suivantes doivent être suivies pour chacun des
appareils raccordés au système de ventilation au moment de
sa mise en marche, alors que tous les autres appareils
raccordés au système de ventilation ne sont pas en marche :
1. Sceller toutes les ouvertures inutilisées du système de
ventilation.
2. Inspecter le système de ventilation afin de vérifier si la
taille et l’inclinaison par rapport à l’horizontale sont
conformes aux exigences du National Fuel Gas Code,
ANSI Z223.1/NFPA 54 ou du Code d’installation du gaz
naturel et du propane, CSA B149.1 et à ces instructions.
Vérifier qu’il n’y a pas d’obstruction ou de restriction,
de fuite, de corrosion et d’autres problèmes qui
pourraient entraîner une situation dangereuse.
3. Si possible, fermer toutes les portes et fenêtres du
bâtiment ainsi que toutes les portes séparant l’endroit
où se trouvent les appareils raccordés au système de
ventilation et les autres zones du bâtiment.
4. Fermer le registre des foyers.
5. Mettre les sécheuses en marche ainsi que tous les
autres appareils qui ne sont pas raccordés au système
de ventilation. Mettre en marche tous les ventilateurs
de tirage, comme celui des hottes de cuisine et des
salles de bains, et les régler à la puissance maximale.
Ne pas mettre en marche les ventilateurs d’été.
6. Suivre les instructions d’allumage. Mettre en marche
l’appareil soumis à l’inspection. Régler le thermostat de
manière à ce que l’appareil fonctionne en continu.
7. Vérifier la présence de fuite au niveau de l’ouverture
du coupe-tirage des appareils qui en sont dotés après
5 minutes de fonctionnement du brûleur principal.
Utiliser la flamme d’une allumette ou d’une bougie.
8. Si un problème de ventilation est observé pendant l’un
des essais décrits ci-dessus, des correctifs doivent être
apportés au système de ventilation conformément au
National Fuel Gas Code, ANSI Z223.1/NFPA 54 et (ou) au
Code d’installation du gaz naturel et du propane, CSA
B149.1.
9. Une fois qu’il a été déterminé que chaque appareil
raccordé au système de ventilation fonctionne
correctement au moyen des essais décrits ci-dessus,
les portes, les fenêtres, les ventilateurs, les registres
de foyer et tous les autres appareils de combustion
alimentés au gaz doivent être remis dans leur état
initial.
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each
appliance connected to the venting system being placed into
operation could result in carbon monoxide poisoning or
death.
The following steps shall be followed with each appliance
connected to the venting system placed in operation, while
any other appliances connected to the venting system are
not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the National Fuel
Gas Code, ANSI Z223.1 or the Natural Gas and Propane
Installation Code, CSA B149.1-15 and these instructions.
Determine that there is no blockage or restriction,
leakage, corrosion and other deficiencies which could
cause an unsafe condition.
3. As far as practical, close all building doors and
windows and all doors between the space in which
the appliance(s) connected to the venting system are
located and other spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any exhaust
fans, such as range hoods and bathroom exhausts, so
they shall operate at maximum speed.
Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance
being inspected in operation. Adjust thermostat so
appliance shall operate continuously.
7. Test for spillage from draft hood appliances at the
draft hood relief opening after 5 minutes of main
burner operation. Use the flame of a match or candle.
8. If improper venting is observed during any of the
above tests, the venting system must be corrected
in accordance with the National Fuel Gas Code ANSI
Z223.1/NFPA 54 and/or National Gas and Propane
Installation Code CSA B149.1-15.
9. After it has been determined that each appliance
connected to the venting system properly vents when
tested as outlined above, return doors, windows,
exhaust fans, fireplace dampers and any other gas
burning appliance to their previous conditions of use.
background
10
HORIZONTAL APPLICATIONS &
CONSIDERATIONS
PROVIDE 8” MINIMUM CLEARANCE
BETWEEN CENTER ROD AND FURNACE
CABINET TO ALLOW FOR CIRCULATOR
BLOWER REMOVAL
ASSURE FURNACE IS LEVEL FROM
END TO END AND HAS A SLIGHT
FORWARD TILT WITH THE FRONT
OF THE FURNACE 0”-3/4” BELOW
THE BACK OF THE FURNACE
3/8” DIAMETER
THREADED ROD
(6 PLACES)
HOLD DOWN
NUTS
SUPPORT
NUTS
2”x2”x1/8” ANGLE IRON
(3 PLACES)
POSITION AS CLOSE AS POSSIBLE TO
BLOWER DECK TO ALLOW FOR
CIRCULATOR BLOWER REMOVAL
TILT OUTWARD TO ALLOW FOR
DOOR AND CIRCULATOR BLOWER
REMOVAL
Figure 2
When installing a furnace horizontally, additional
consideration must be given to the following:
Furnace Suspension
If suspending the furnace from rafters or joists, use 3/8”
threaded rod and 2”x2”x1/8” angle iron as shown in the
following diagram. The length of rod will depend on the
application and the clearances necessary.
If the furnace is installed in a crawl space it must be
suspended from the oor joist or supported by a concrete
pad. Never install the furnace on the ground or allow it to
be exposed to water.
Front Cover Pressure Switch Tube Location
When a furnace is installed horizontally with left side down
the front cover pressure switch tube must be re-located to
the lower port of the collector box cover.
1. Remove tube from front cover pressure switch and
collector box cover.
2. Remove rubber plug from bottom collector box port
and install on top collector box port.
3. Locate 24” x 1/4” tube in bag assembly.
4. Install one end on front cover pressure switch.
5. Route tube to lower port on collector box cover and
cut o󰀨 excess tubing.
Drain Trap and Lines
In horizontal applications the condensate drain trap is
secured to the furnace side panel, suspending it below the
furnace. A minimum clearance of 5 ½” below the furnace
must be provided for the drain trap. Additionally, the
appropriate downward piping slope must be maintained
from the drain trap to the drain location. Refer to
Condensate Drain Trap and Lines for further details. If the
drain trap and drain line will be exposed to temperatures
near or below freezing, adequate measures must be taken
to prevent condensate from freezing.
Alternate Vent/Flue Location
Figure 3A
Figure 3B
Figure 3C
Figure 3D
Recommended Installation Positions
background
11
or components of one manufacturer with materials or
components of another manufacturer. Refer to the following
chart for plastic pipe & ttings specications
Materials - Installation in Canada
All installations in Canada must conform to the
requirements of CAN/CSA B149.1-15 code. All vent
components, including primer and cement, must be listed
to ULC S636. The certied pipe and ttings should be
clearly marked with the ULC standard “S636”. The primer
and cement used must be of the same manufacturer as
the vent system. For Royal Pipe System 636; use GVS-
65 Primer (Purple) and GVS-65 PVC Solvent Cement.
For IPEX System 636, use PVC/CPVC Primer, Purple
or clear. Use PVC Solvent cement (Gray). For Canadian
installations, ABS may be used as a combustion air pipe
only. ABS is not an approved vent material in Canada.
If ABS is used as a combustion air pipe, it must be CSA
certied. Always follow the manufacturer’s instructions
in the use of primer and cement. Do not use primer and
cement around potential sources of ignition. Do not use
primer or cement beyond its expiration date.
Leveling
Leveling ensures proper condensate drainage from
the heat exchanger. For proper ue pipe drainage, the
furnace must be level lengthwise from end to end. The
furnace should have a slight tilt from back to front with the
access doors downhill from the back panel approximately
1/2 to 3/4 inches. The slight tilt allows the heat exchanger
condensate, generated in the recuperator coil, to ow
forward to the recuperator coil front cover.
Alternate Electrical and Gas Line Connections
This furnace has provisions allowing for electrical and gas
line connections through either side panel. In horizontal
applications the connections can be made either through
the “top”or “bottom” of the furnace.
Drain Pan
A drain pan must be provided if the furnace is installed
above a conditioned area. The drain pan must cover the
entire area under the furnace (and air conditioning coil if
applicable).
Freeze Protection
Refer to Horizontal Applications and Conditions - Drain
Trap and Lines.
WARNING
Possible property damage, personal injury or death may
occur if the correct conversion kits are not installed. The
appropriate kits must be applied to ensure safe and proper
furnace operation. All conversions must be performed by a
qualified installer or service agency.
VENT PIPE & COMBUSTION AIR
This manual will refer to the pipe that discharges products
of combustion to the outdoors as the “vent” pipe or
“ue” pipe. The pipe that supplies air for combustion
to the furnace will be referred to as the “intake” pipe or
“combustion air” pipe.
This furnace is dual certied and may be installed as a
non-direct vent (single pipe) or direct vent (dual pipe)
appliance.
Materials - Installations in the U.S.A.
PVC, CPVC, or ABS pipe & ttings are typically used as
venting and intake pipe materials. All 90° elbows must
be medium or long radius types. A medium radius elbow
should measure ~3-1/16” minimum from the plane of
one opening to the center line of the other opening for 2”
diameter pipe, and ~4-9/16” minimum for 3” pipe.
In addition to these materials, Innoue® by Centrotherm
Eco Systems is also an approved vent and combustion
air materials for installations in the U.S.A. Manufacturers
Installation instructions for these products must be
followed. These products have specic instructions for
installing, joining and terminating. Do not mix materials
PVC
ASTM
STANDARD
SCHEDULE 40 PIPE D1785
SDR
21
or
26 PIPE D2241
SYTSTEM
1738
®
(IPEX)
D1784, UL 1738
SCHEDULE
40
FITTINGS D2466
SYTSTEM
1738
®
FITTINGS
D1784, UL 1738
ABS
SCHEDULE 40 PIPE D1527
FITTINGS D2468
CPVC
SCHEDULE 40 PIPE F441
SDR
21
or
26 PIPE F442
FITTINGS F438
POLYPROPYLENE
INNOFLUE
®
(CENTROTHERM)
UL
1738
PRIMER & SOLVENT CEMENT
PVC PRIMER F656
CPVC PRIMER F656
PVC SOLVENT CEMENT D2564
CPVC
SOLVENT
CEMENT
F493
ABS SOLVENT CEMENT D2235
D2564, D2235, F493
TRANSITION
CEMENT FOR ABS TO PVC or CPVC D3188
INSTALLATIONS IN CANADA
PVC
&
CPVC
PIPE & FITTINGS
PVC & CPVC SOLVENT CEMENT
TRANSITION CEMENT
INNOFLUE
®
(CENTROTHERM)
POLYPRO
®
(DURAVENT)
SYSTEM 636
®
(IPEX)
VENTING MATERIAL REQUIREMENTS
ULC
S636
background
12
WARNING
To avoid bodily injury, fire or explosion, solvent cements
must be kept away from all ignition sources (i.e., sparks, open
flames, and excessive heat) as they are combustible liquids.
Avoid breathing cement vapors or contact with skin and/or
eyes.
PREFERRED
Figure 4
TRANSITION NO LESS
THAN 45 DEGREES TO
HORIZONTAL PLANE TO
AVOID CREATING A WATER
TRAP IN VENT PIPING.
ACCEPTABLE
Figure 5
NO TRANSITION ON
HORIZONTAL PLANE,
THIS CREATES A
WATER TRAP AND
RESTRICTS FLUE
GASES
Figure 6
Pipe Installation
This furnace is manufactured with 2” CPVC vent & intake
couplings. Use transition cement to connect PVC or ABS
pipe to these ttings. For furnaces requiring installation
of 3” pipe, the transition from 2” to 3” should be done as
close to the furnace as possible, and only when the piping
is sloped enough to prevent condensation from collecting.
This furnace must not be connected to Type B, BW, or
L vent or vent connector, and must not be vented into
masonry chimney. A masonry chimney may be used as
a chase or passageway for approved venting materials
providing the masonry chimney is not also being used to
vent products of combustion. Never common vent this
appliance with another appliance. Never use a vent which
is used by a solid fuel appliance.
Piping may run vertically or horizontally and must be
adequately supported to prevent strain on joints, sagging,
separation, and detachment from the furnace. Horizontal
runs of piping must be supported every three to ve
feet. Condensation within the furnace secondary heat
exchanger and in the vent pipe is a normal occurrence.
Vent pipe must be installed to maintain a minimum inch
per foot downward slope toward the furnace to return
condensate to the furnace’s drain system. Condensation
may also occur in the intake pipe. This commonly takes
place during the summer months when humid air enters
an intake pipe that runs through a cool basement or other
conditioned space.
Precautions should be taken to prevent condensate from
freezing inside the ue/vent pipe, combustion air intake
pipe and/or at the pipe terminations. All ue/vent and/
or combustion air piping exposed to temperatures below
35°F for extended periods of time should be insulated
with 1/2” thick closed cell foam. All vent/ue piping exposed
to outdoors in excess of the terminations permitted as
described in the provided installation manual should be
insulated with 1/2” thick closed cell foam. Inspect piping
for leaks prior to installing insulation. If the combustion air
intake or ue vent pipe is to be installed above a nished
ceiling or other area where dripping of condensate will
be objectionable, insulating the combustion air pipe may
be necessary. Use 1/2” thick closed cell foam insulation
where required. Refer to vent & intake options for using the
RF000142 kit and managing condensation.
WARNING
Upon completion of the furnace installation, carefully
inspect the entire flue system both inside and outside of the
furnace to assure it is properly sealed. Leaks in the flue
system can result in serious personal injury or death due to
exposure to flue products, including carbon monoxide.
WARNING
Failure to follow these instructions can result in bodily
injury or death. Carefully read and follow all instructions
given in this section.
background
13
1
2 3 4 5 6 7 8
2 120 115 110 105 100 95 90 85
3 134 127 120 113 106 99 92 85
2 100 95 90 85 80 75 70 65
3 151 144 137 130 123 116 109 102
2 45 40 35 30 25 20 15 10
3 113 106 99 92 85 78 71 64
2 70 65 60 55 50 45 40 35
3 89 82 75 68 61 54 47 40
2 N/A N/A N/A N/A N/A N/A N/A N/A
3 120 113 106 99 92 85 78 71
2 N/A N/A N/A N/A N/A N/A N/A N/A
3 151 144 137 130 123 116 109 102
2 N/A N/A N/A N/A N/A N/A N/A N/A
3 151 144 137 130 123 116 109 102
2 120 115 110 105 100 95
90 85
3 185 178 171 164 157 150 143 136
2 85 80 75 70 65 60 55 50
3 168 161 154 147 140 133 126 119
2 40 35 30 25 20 15 10 5
3 120 113 106 99 92 85 78 71
2 N/A N/A N/A N/A N/A N/A N/A N/A
3 113 10
6 99 92 85 78 71 64
2 N/A N/A N/A N/A N/A N/A N/A N/A
3 151 144 137 130 123 116 109 102
*RVT960403BN
*RVT96/*DVT96 Direct Vent (2 - Pipe) and Non-Direct Vent (1- Pipe)
Maximum Allowable Length of Vent/Flue Pipe
& Combustion Air Pipe (ft)
MODEL
Pipe Size
(in.)
Number of Elbows
*DVT960603BN
*DVT960804CN
*DVT961005CN
*DVT961205DN
*RVT960603BN
*RVT960803BN
*RVT960804CN
*RVT961005CN
*RVT961205DN
*DVT960403BN
*RVT961005DN
Table 4
VENT-DRAIN
Figure 8
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
Termination Locations
Non-Direct Vent
Vent/Flue Termination
No Terminations
Above Walkway
Non-Direct Vent
Vent/Flue Termination
Direct Vent
Vent/Flue Termination
Forced Air
Inlet
Non-Direct Vent
&
Direct Vent
Vent/Flue Terminations
Grade or Highest
Anticipated
Snow Level
Vent Clearances
Figure 7
background
14
Vent & Intake Options for Condensate Management
The RF000142 coupling (Figure 8) can be secured directly
to the furnace intake and/or vent piping if condensation
is a concern. If the RF000142 is used on the combustion
air inlet, it must be installed with the arrow pointing up. It
should be noted, the combustion air will actually be moving
in a direction opposite of the arrow on the RF000142
coupling. It must have a eld supplied, trapped drain tube
free-draining to proper condensate disposal location. A
loop in the drain tube can serve as a trap. The unused
RF000142 drain tting should be capped. A tee installed in
the vent and/or intake pipe is also an acceptable method
of capturing condensation. For vertical vent piping, a PVC
wye can be used for capturing condensation (see Figure
12). Any of these options must have a eld supplied,
trapped drain tube or pipe, free-draining to proper
condensate disposal location. A loop in the drain tube can
serve as a trap.
Pipe Termination
Products of combustion must always be vented outside. A
vent pipe must never terminate in an attic, crawl space, or
any other part of a dwelling. Follow the vent pipe & intake
pipe termination requirements listed below as well as all
applicable local, State and National codes.
All terminations (vent and/or intake) must be located at
least 12” above ground level or the anticipated snow level.
All vent terminations (non-direct and direct vent) must
terminate at least 3 feet above any forced air inlet located
within 10 feet.
The vent termination of a non-direct vent application must
terminate at least 4 feet below, 4 feet horizontally from, or
1 foot above any door, window, or gravity air inlet into any
building.
The vent termination of a direct vent application must
terminate at least 12” from any opening through which ue
gases may enter a building (door, window, or gravity air
inlet).
The vent termination of vent pipe run vertically through a
roof must terminate at least 12” above the roof line (or the
anticipated snow level) and be at least 12” from any vertical
wall (including any anticipated snow build up).
A vent termination shall not terminate over public walkways
or over an area where condensate or vapor could create a
nuisance or hazard or could be detrimental to the operation
of regulators, relief valves, or other equipment.
The combustion air intake termination of a direct vent
application should not terminate in an area which is
frequently dusty or dirty.
Vent & combustion air pipes may terminate vertically
through a roof, or horizontally through an outside wall. The
combustion air intake and vent pipe can be terminated
in two di󰀨erent pressure zones. The intake pipe can be
terminated on one side of the building, while the ue
vent can be terminated on another side of the building or
through the roof. In addition, the combustion air intake
can be terminated in a su󰀩ciently ventilated attic. Vertical
vent pipe terminations should be as shown in gure *. The
penetration of pipes through the roof must be sealed water
tight with proper ashing such as is used with a plastic
plumbing vent.
Figure 9
Insert flange. Cut 2 ½” long.
RF000142
Figure 10
Figure 11
WARNING
The rubber elbow is not designed to support a load. When
the rubber elbow is mounted externally to the furnace
cabinet, extreme care must be taken to adequately support
field-supplied vent/flue piping, as damage can result in leaks
causing bodily injury or death due to exposure to flue gases,
including carbon monoxide.
background
15
CAUTION
Be sure not to damage internal wiring or other components
when reinstalling coupling and screws.
NOTE: For installations at or above 7,000 feet
altitude, use 3” venting.
Vent/Flue Pipe Terminations
12" MIN.
VENT/FLUE TEE (
or
45° ELBOW
TURNED DOWN or
90° ELBOW TURNED
DOWN
OPTIONAL)
Horizontal Termination (Single Pipe)
Above Highest Anticipated Snow Level
Figure 14
12" MIN. TO GRADE OR
HIGHEST ANTICIPATED
SNOW LEVEL
6” MAX
4” MIN
Standard Horizontal Terminations (Dual Pipe)
Figure 15
Horizontal vent pipe terminations should be as shown in
the following gures. To secure the pipe passing through
the wall and prohibit damage to piping connections, a
coupling should be installed on either side of the wall and
solvent cemented to a length of pipe connecting the two
couplings. The length of pipe should be the wall thickness
plus the depth of the socket ttings to be installed on the
inside and outside of the wall. The wall penetration should
be sealed with silicone caulking material.
Intake & Vent Pipe Options
Figure 12
Combustion Air Intake Options
Figure 13
background
16
STRAIGHT
ELBOWS
Direct Vent (Dual Pipe) Piping
Figure 19
90°
ELBOWS
3” - 24”
Alternate Horizontal Vent Termination (Dual Pipe)
Figure 20
VENT/FLUE
TEE
COMBUSTION
AIR INTAKE.
DISTANCE BETWEEN
COMBUSTION AIR
INTAKE AND GRADE
DISTANCE BETWEEN
VENT AND GRADE
Figure 21
Vent Pipe
Use alternate vent
& combination
air locations
Combustion Air Pipe
Field Supplied
Drain Tee on Vent Pipe
Condensate trapped
to prevent flue gas from escaping
and routed to field supplied
condensate disposal
1/4” per foot min.
slope to furnace
6’ Max.
Floor
B
a
s
e
m
e
n
t
/
C
r
a
w
l
s
p
a
c
e
DOWN VENTING UPFLOW MODEL FURNACES ONLY
All piping and fittings must be joined per material manufacturers specifications
to prevent separation and flue gas leaks.
Figure 16
COMBUSTION AIR INTAKE
(OPTIONAL)
*Not required for
single pipe installation
TEE (OPTIONAL)
9
6
”
M
A
X
.
-
3
”
M
I
N.
R
O
O
F
L
I
N
E
12” MIN
HEIGHT DIFFERENCE
BETWEEN
INTAKE AND VENT
12” MIN TO ROOF OR HIGHEST
ANTICIPATED SNOW LEVEL
Figure 17
12" MIN. TO GRADE OR
HIGHEST ANTICIPATED
SNOW LEVEL
6” MAX
10”- 24”
4” MIN
Standard Horizontal Vent Termination (Dual Pipe)
Figure 18
background
17
Refer to the directions furnished with the Side Wall
Vent Kit (p/n 0170K00000S or 0170K00001S) for
installation specications.
Vertical Installation
Horizontal Installation
Figure 24
SPECIAL INSTRUCTIONS FOR
PRODUCTS INSTALLED IN THE STATE OF
MASSACHUSETTS
For all side wall horizontally vented gas fueled equipment
installed in every dwelling, building or structure used in
whole or in part for residential purposes, including those
owned or operated by the Commonwealth and where
the side wall exhaust vent termination is less than seven
(7) feet above nished grade in the area of the venting,
including but not limited to decks and porches, the
following requirements shall be satised:
1. INSTALLATION OF CARBON MONOXIDE
DETECTORS. At the time of installation of the side
wall horizontal vented gas fueled equipment, the
installing plumber or gastter shall observe that a hard
wired carbon monoxide detector with an alarm and
battery back-up is installed on the oor level where
the gas equipment is to be installed. In addition,
the installing plumber or gastter shall observe that
a battery operated or hard wired carbon monoxide
detector with an alarm is installed on each additional
level of the dwelling, building or structure served by
the side wall horizontal vented gas fueled equipment.
It shall be the responsibility of the property owner to
secure the services of qualied licensed professionals
for the installation of hard wired carbon monoxide
detectors.
a. In the event that the side wall horizontally
vented gas fueled equipment is installed in a
crawl space or an attic, the hard wired carbon
monoxide detector with alarm and battery back-
up may be installed on the next adjacent oor
level.
b. In the event that the requirements of this
subdivision can not be met at the time of
completion of installation, the owner shall have
a period of thirty (30) days to comply with the
above requirements; provided, however, that
during said thirty (30) day period, a battery
operated carbon monoxide detector with an
alarm shall be installed.
Combustion Air Intake may also be snorkeled to obtain 12” min ground clearance.
90°
ELBOWS
3”-24” BETWEEN PIPES
Alternate vent termination above anticipated
snow level (dual pipe)
Figure 22
Vent/Flue and Combustion Air Pipe Terminations
3” MIN
12” MIN TO GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL
3”MIN
24”MAX
12” MIN SEPARATION
Termination of Multiple Direct Vent Furnaces
Figure 23
Vent/Intake Terminations For Installation of
Multiple Direct Vent Furnaces
If more than one direct vent furnace is to be installed
vertically through a common roof top, maintain the same
minimum clearances between the exhaust vent and air
intake terminations of adjacent units as with the exhaust
vent and air intake terminations of a single unit.
If more than one direct vent furnace is to be installed
horizontally through a common side wall, maintain the
clearances as in the following gure. Always terminate all
exhaust vent outlets at the same elevation and always
terminate all air intakes at the same elevation.
Concentric Vent Termination
Refer to the directions provided with the Concentric Vent
Kit or IO-619 for installation specications.
Side Wall Vent Kit
This kit is to be used with 2” or 3” direct vent systems.
The vent kit must terminate outside the structure and may
be installed with the intake and exhaust pipes located
side-by-side or with one pipe above the other. These kits
are NOT intended for use with single pipe (indirect vent)
installations.
background
18
2. The “special venting systems” shall be Product
Approved by the Board, and the instructions for
that system shall include a parts list and detailed
installation instructions.
e. A copy of all installation instructions for all
Product Approved side wall horizontally vented
gas fueled equipment, all venting instructions,
all parts lists for venting instructions, and/or all
venting design instructions shall remain with the
appliance or equipment at the completion of the
installation.
#
3
#1
#2
#4
#5
#
6
#7
#8
#9
#10
#11
100 Degree
Elbow
Coupling
Figure 25
NOTE: Drain components shown for information
purposes only. For horizontal installations, a
Horizontal Drain Kit may be needed. Refer to the
Specifications Sheet for kit part number.
CONDENSATE DRAIN LINES & DRAIN
TRAP
A condensing gas furnace achieves its high level
of e󰀩ciency by extracting heat from the products of
combustion to the point where condensation takes place.
The condensate must be collected in the furnace drain trap
and routed to an appropriate drain location in compliance
with local and national codes.
Follow the bullets listed below when installing the drain
system. Refer to the following sections for specic details
concerning furnace drain trap installation and drain hose
hook ups.
• The drain trap supplied with the furnace must be
used.
• The drain trap must be primed at time of installation.
• The drain line between furnace and drain location
must meet local and nation codes.
• The drain line between furnace and drain location
must maintain a 1/4 inch per foot downward slope
toward the drain.
2. APPROVED CARBON MONOXIDE DETECTORS.
Each carbon monoxide detector as required in
accordance with the above provisions shall comply
with NFPA 720 and be ANSI/UL 2034 listed and IAS
certied.
3. SIGNAGE. A metal or plastic identication plate
shall be permanently mounted to the exterior of
the building at a minimum height of eight (8) feet
above grade directly in line with the exhaust vent
terminal for the horizontally vented gas fueled heating
appliance or equipment. The sign shall read, in print
size no less than one-half (1/2) inch in size, “GAS
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL
OBSTRUCTIONS”.
4. INSPECTION. The state or local gas inspector of the
side wall horizontally vented gas fueled equipment
shall not approve the installation unless, upon
inspection, the inspector observes carbon monoxide
detectors and signage installed in accordance with the
provisions of 248 CMR 5.08(2)(a)1 through 4.
Exemptions
The following equipment is exempt from 248 CMR 5.08(2)
(a)1 through 4:
1. The equipment listed in Chapter 10 entitled
“Equipment Not Required To Be Vented” in the most
current edition of NFPA 54 as adopted by the Board;
and
2. Product Approved side wall horizontally vented gas
fueled equipment installed in a room or structure
separate from the dwelling, building or structure used
in whole or in part for residential purposes.
c. MANUFACTURER REQUIREMENTS - GAS
EQUIPMENT VENTING SYSTEM PROVIDED.
When the manufacturer of Product Approved
side wall horizontally vented gas equipment
provides a venting system design or venting
system components with the equipment, the
instructions provided by the manufacturer for
installation of the equipment and the venting
system shall include:
1. Detailed instructions for the installation of the venting
system design or the venting system components;
and
2. A complete parts list for the venting system design or
venting system.
d. MANUFACTURER REQUIREMENTS - GAS
EQUIPMENT VENTING SYSTEM NOT
PROVIDED. When the manufacturer of a
Product Approved side wall horizontally
vented gas fueled equipment does not
provide the parts for venting the ue gases,
but identies “special venting systems”, the
following requirements shall be satised by the
manufacturer:
1. The referenced “special venting system” instructions
shall be included with the appliance or equipment
installation instructions; and
background
19
Drain Exiting Right Side
1. Locate and Install the 45º pipe / hose drain coupling
from the outside of the cabinet (barbed end goes
in the cabinet) through hole in the right side of the
cabinet and secure with two eld supplied #8 self-
tapping screws (see Figure 23).
2. Locate the long drain hose #3 and cut at line “A”.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and
secure with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
Side Cut-Out
12”
3”
Right side shown.
Acceptable
area for
drain hole.
Figure 26
Installer selects right or left side drain
and installs this hose accordin
g
l
y
.
Hose #1
Hose #2
45 degree
barb-pipe
adapter
45 degree
barb-pipe
adapter
Figure 27
Drain Exiting Left Side
1. Install the 45 degree pipe / hose drain coupling from
the outside of the cabinet (barbed end goes in the
cabinet) through the hole in the left side of the cabinet
and secure with two eld supplied #8 self-tapping
screws (see Figure 23).
2. Locate the long drain hose #3 and cut at “B” line for a
17.5” cabinet; cut at line “C” for a 21” cabinet; do not
cut for a “D” width cabinet.
• Do not trap the drain line in any other location than at
the drain trap supplied with the furnace.
• If the drain line is routed through an area which may
see temperatures near or below freezing, precautions
must be taken to prevent condensate from freezing
within the drain line.
• If an air conditioning coil is installed with the furnace,
a common drain may be used. An open tee must be
installed in the drain line, near the cooling coil, to
relieve positive air pressure from the coil’s plenum.
This is necessary to prohibit any interference with the
function of the furnace’s drain trap.
NOTE: In vertical installations, air conditioning
coil condensate may drain into the furnace trap
as long as there is a trap between the coil and the
furnace trap and the drain pipe is not terminating
below the water level of the furnace trap.
General Drain Information
All furnace models come with a factory installed drain trap.
For vertical installations, the trap will remain in the factory
position except for a counterow when the installer desires
the drain to exit the right side. All furnace models installed
horizontally require the trap to be relocated. Many drain
hoses have a built–in grommet which will provide a cabinet
seal when installed. See instructions below for your model
and installation position.
NOTE: Both sides of the drain trap must be primed
prior to initial furnace start up
Field Supplied Drain
Drain the furnace and air conditioning coil if applicable,
in compliance with code requirements. In horizontal or
counterow installations, a eld installed rubber coupling
will allow the drain trap to be removed for cleaning. The
drain trap must be primed before initial furnace start up.
When an air conditioning coil drain is connected to the
eld supplied furnace drain, it must be vented, with an
open tee installed at a height no higher than the bottom
of the furnace collector box to prevent air conditioning
condensate from backing up into the furnace if the common
drain was blocked.
Upflow Model Installed Vertically
The trap and factory installed hoses remain as shipped.
The furnace drain may exit either the right or left side of the
furnace cabinet. Both sides of the cabinet have two .875”
diameter holes which can be used interchangeably for
drain and low voltage wiring purposes. If a higher drain exit
is needed, a .875” diameter hole may be added in the area
shown in Figure 22. Any unused cabinet opening must be
sealed. Do not allow drain hose to sag or trap
water.
background
20
Upflow Model Installed Horizontally
with Left Side Down
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
*Also see Front Cover Pressure Switch Tube Location on
page 10.
Hose #6
Hose #5
Hose #11
Figure 29
1. Remove the clamps from the two drain tubes on the
trap.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and hoses from the blower deck .
4. Remove the two plugs from the left side of the cabinet
and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #6. Measuring
from the non-grommet end; cut o󰀨 and discard 1 ½”
for a “D” width cabinet, 5” for a “C” width cabinet, 8 ½”
for a “B” width cabinet.
6. Remove the rubber plug from vent – drain elbow side
port. Place hose #6 on the vent – drain elbow side
port and secure with a silver clamp .
7. Unused vent-drain elbow drip leg port must be
sealed to prevent ue gases from escaping.
Insert the rubber plug removed in Step 6 into the
unused elbow drain port; Inserting a blunt tool
such as a 3/16” Allen wrench into the center of
the rubber plug will stretch the plug and allow
complete insertion.
8. Locate hose #5 and cut 3” from the non-grommet end.
Discard the section without the grommet.
9. Insert the cut end of tube #5 through the lower cabinet
drain hole.
10. Connect hose #6 & hose #5 using 100º elbow and
secure with two red clamps
11. (Draining the Collector Box) Remove cap from left
side collector box drain port (bottom in horizontal left
position) and install it on the right side (top) collector
box drain port.
12. Install the non-grommet end of hose #11 from outside
the cabinet in the upper drain hole. Install on collector
box and secure with a silver clamp.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and
secure with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
Upflow Model Installed Horizontally
with Right Side Down
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
Hose #11
Hose #2
Figure 28
1. Remove the clamps from both ends of the drain
hoses.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and two hoses from the blower deck
4. Remove the two plugs from the right side of the
cabinet and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #2 (factory
installed) and cut 1” away from the 45 degree bend,
discard the 45 degree section. Insert hose #2 from
outside the cabinet through the cabinet drain hole
nearest the top. Secure it to the barbed tting in the
elbow with a red clamp.
6. (Draining the Collector Box) Install the non-grommet
end of hose #11 from outside the cabinet in the
bottom drain hole. Install on collector box and secure
with a silver clamp.
7. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
8. Refer to Field Supplied Drain section for instructions
on eld supplied/installed drain on outlet of furnace
trap.
background
21
Hose #4 x 3
Hose #5
Figure 31
Counterflow Model Installed Vertically
The furnace drain may exit the right or left side of the
furnace cabinet (left side preferred). Trap and factory
installed hoses remain as shipped if the drain will exit the
left side of the cabinet. Draining from the right side requires
re-location of the trap to outside the cabinet.
Drain Exiting Left Side
1. Install a eld supplied rubber coupling secured with
a 1 1/4” clamp to enable removing the trap for future
cleaning. Alternately, a PVC tting may be glued on
the trap outlet.
2. Install drain per local and National codes.
13. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
14. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
Upflow Model Installed Horizontally
With Left Side Down - Alternate
* Also see the Front Cover Pressure Switch Tube Location.
Insert flange. Cut 2 ½” long.
R 000142F
Figure 30
1. (Draining the RF000142 Coupling) Locate hose #2
(factory installed). Cut o󰀨 and discard the 45°radius
end.
2. Install 90°radius end of hose #2 on RF000142 drain
outlet and secure with a red clamp.
3. Insert coupling in hose #2 and secure with a red
clamp.
4. Locate hose #5 and cut 3” from the non-grommet end.
Discard the section without the grommet.
5. Insert the cut end of tube #5 through the lower cabinet
drain hole.
6. Insert 100 degree elbow in the cut end of hose #5.
7. Locate hose #6. Using red clamps, connect between
the coupling and 100 degree elbow, cutting o󰀨 excess
tubing.
8. (Draining the Collector Box) Remove cap from left
side collector box drain port (bottom in horizontal left
position) and install it on right side (top) collector box
drain port.
9. Install the non-grommet end of hose #11 from outside
the cabinet in the upper drain hole. Install on collector
box and secure with a silver clamp.
10. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
background
22
Counterflow Model Installed Horizontally with
Right Side Down
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
NOTE: For horizontal installations, some of the
required hoses are found in the factory-installed
hose assemblies. Remove the hose clamps to obtain
the respective hoses needed for installation, and
install per the following directions.
Figure 33
1. Remove the drain trap and factory installed drain tube
assemblies.
2. Remove two 1” plugs from right side of cabinet
3. (Draining the Collector Box) From outside the cabinet,
insert the non-grommet end hose #7 into the back
drain hole and secure to collector box drain port using
a silver clamp.
4. (Draining the Vent Elbow) Insert the straight barbed
coupling into the vent – drain elbow drip leg and
secure with a red clamp.
5. From outside the cabinet, insert the non-grommet
end of hose #8 into the front cabinet drain hole and
secure on the vent - drain elbow barb tting using a
red clamp.
6. Using the two sheet metal screws provided in the
cabinet, secure the trap to the furnace.
7. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
Drain Exiting Right Side
Figure 32
1. Remove hose clamps and hoses from trap.
2. Remove trap.
3. (Draining the Vent Elbow) Insert the non-grommet end
hose #10 into the cabinet back drain hole. Insert a
coupling into the drip leg of the vent-drain elbow and
secure with a silver clamp. Secure hose #10 on vent-
drain elbow barb tting with a silver clamp.
4. (Draining the Collector Box) Insert non-grommet end
of hose #9 into the cabinet front drain hole and secure
on collector box drain port with a silver clamp.
5. Mate the drain trap inlets to the hoses and secure with
silver clamps.
6. Line up the trap mounting holes with the pre-drilled
holes in the furnace and secure with 2 screws
removed in step 2.
7. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
background
23
14. Connect the 4” straight section of hose #4 to the 100º
elbow and the PVC pipe and secure with red clamps.
15. Connect the hoses to the trap inlets and secure
with silver clamps, drain trap outlet must point to the
original bottom of the furnace.
16. Using the two sheet metal screws provided in the
cabinet, secure the trap to the furnace.
17. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
CAUTION
To prevent unreliable operation or equipment damage, the
inlet gas supply pressure must be as specified on the unit
rating plate with all other household gas fired appliances
operating.
R-32 INFORMATION
This furnace is equipped with a control board that is
capable of shutting o󰀨 the gas heat and turning on the
blower fan in case of an R-32 refrigerant leak in the indoor
cooling unit. If the cooling unit that is paired with this
furnace does not utilize R-32 as the refrigerant, the R-32
functionalities in the furnace control board will need to be
turned o󰀨 for the furnace to run properly.
R-32 function on the control board is ON by default. The
R-32 function can be disabled through the furnace control
by entering the A2L Function Enabled menu and selecting
“no”. If A2L function is disabled, the furnace control will
ignore all A2L functions. If A2L function is enabled, the
control will monitor the R-32 sensor information.
To enter the A2L Function Enabled menu, press the left
or right switch until LED displays “A2E”. Press the center
switch and the LED will display the selected option (yes or
no). Press the left of right switch to select one of the two
options and press the middle switch to conrm the option.
R-32 Sensor Wire Routing
IMPORTANT NOTE: Wiring routing must not
interfere with circulator blower operation, filter
removal or routine maintenance. Wire should
not be routed near hot surfaces and should be
protected from sharp edges.
The R-32 Sensor wire coming from the indoor refrigeration
unit will need to be routed into the furnace and connected
to the connection point on the furnace control board. This
wire should be routed alongside the thermostat wires
through the low voltage openings in the left or right side of
the furnace blower compartment. Please see the electrical
section for the location of the R-32 Sensor connection on
the control board.
Counterflow Model Installed Horizontally
with Left Side Down
* Also see Front Cover Pressure Switch Tube Location on
page 10.
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
Hose #4
Hose #5
Hose #4
Hose #2
Figure 34
1. Remove the factory installed drain trap and hose
assemblies. Leave the 100° elbow inserted and
clamped in the vent-drain elbow.
2. Remove two 1”plugs from left side of cabinet
3. Drain the Collector Box. Remove the cap from the
left side of the collector box drain port (bottom in
horizontal left position) and install it on right side drain
port.
4. Place radius end of hose #4 (factory installed) on
the collector box drain port and secure with a silver
clamp.
5. Insert hose #2 from outside the cabinet in the front
drain hole.
6. Connect hose #4 & hose #2 together using a straight
barbed coupling and two gold clamps (factory
installed).
7. (Draining the Vent Elbow) Remove rubber plug from
vent – drain elbow side port.
8. The un-used vent-drain elbow drip leg port must
be plugged to prevent ue gases from escaping.
Insert rubber plug removed in step 7 into the 100°
elbow. (Inserting a blunt tool such as a 3/16” Allen
wrench into the center of the rubber plug will stretch
the plug and allow complete insertion).
9. Place radius end of hose #4 on the side port of vent –
drain elbow and secure with a gold clamp.
10. Insert a ½” diameter PVC pipe (factory installed) into
hose #4 and secure with a gold clamp.
11. Insert the non-grommet end of hose #5 (factory
installed) from outside the cabinet in the back drain
hole.
12. Insert 100º elbow in hose #5 and secure with a red
clamp.
13. Locate hose #4 and cut a cut o󰀨 a 4” straight section
and discard the radius end.
background
24
Natural Gas Minimum: 4.5" w.c. Maximum: 10.0" w.c.
Propane Gas Minimum: 11.0" w.c. Maximum: 13.0" w.c.
INLET GAS SUPPLY PRESSURE
GAS SUPPLY AND PIPING
The furnace rating plate includes the approved furnace gas
input rating and gas types. The furnace must be equipped
to operate on the type of gas applied. This includes any
conversion kits required for alternate fuels and/or high
altitude.
Inlet gas supply pressures must be maintained within the
ranges specied in the following table. The supply pressure
must be constant and available with all other household
gas red appliances operating. The minimum gas supply
pressure must be maintained to prevent unreliable ignition.
The maximum must not be exceeded to prevent unit
overring.
PROPANE GAS/HIGH ALTITUDE
INSTALLATIONS
High
Stage
Low
Stage
Natural None #45 3.5" w.c. 1.9" w.c. None
Propane
LPM-34*
1
1.25mm 10.0" w.c. 6.0" w.c. None
Gas Altitude Kit Orifice
Manifold Pressure
Pressure
Switch
Change
0-7000
NOTE: In Canada, gas furnaces are only certified to 4500 feet.
This furnace is shipped from the factory congured for
natural gas at standard altitude. Propane gas installations
require an orice change to compensate for the energy
content di󰀨erence between natural and propane gas.
For furnaces being converted to LP gas, it is strongly
recommended that a LPLP03 kit also be installed. The
use of this kit will prevent the furnace from ring when
the LP gas supply pressure is too low to support proper
combustion.
High altitude installations may require both a pressure
switch and an orice/spring change. These changes are
necessary to compensate for the natural reduction in the
density of both the gas fuel and the combustion air at
higher altitude.
For installations above 7000 feet, please refer to the
furnace Specication Sheets for required kit(s).
High altitude kits are purchased according to the
installation altitude and usage of either natural or propane
gas. The indicated kits must be used to insure safe
and proper furnace operation. All conversions must be
performed by a qualied installer, or service agency.
Furnace Start up
During furnace start up, the furnace control will identify the
connected R-32 sensor and will start monitoring the sensor
communication. A green LED located next to the sensor
connection will indicate if there is communication between
the furnace control and the R-32 sensor. The LED will be
ON during the duration of the startup and then will either
start blinking or turn OFF. The blinking LED signies that
communication with the R-32 sensor is present. The LED
OFF signies that there is no signal with the sensor.
If there are no alarms or faults, the furnace will go into
regular run mode after a warm up period. The furnace
control monitors the R-32 sensor once per second.
R-32 Refrigerant Leak
If the R-32 sensor on the indoor cooling unit detects a
specied concentration of R-32 refrigerant, the furnace
will enter Mitigation Mode to dilute the refrigerant
concentrations in case of a leak. In Mitigation Mode, the
furnace will do the following:
1) Display the A2L Refrigerant Leakage error code (EA0)
2) Shut down the gas operation
3) Energize the optional ventilation and alarm outputs.
4) Run the fan at max CFM airow
Once the R-32 sensor stops detecting a leak, the fan will
continue to run for 5 minutes. After the 5 minutes, if there
are no other alarms or faults, the control will de-energize
the optional ventilation and alarm outputs and then go back
to the original operating mode per the thermostat.
A2L Verification
The A2L Function Verication menu allows the installer to
verify if the R-32 function operates properly. This menu
simulates the refrigerant leak process and is only able to
be used when there are no active alarms or faults. To verify
the R-32 functions, enter the A2L Function Verication
menu and select “YES”. To enter the A2L Function
Verication menu, press the left or right switch until LED
displays “A2u”. Press the center switch and the LED will
display the selected option (yes or no). Press the left of
right switch to select one of the two options and press
the middle switch to conrm the option. Once “YES” is
selected, the furnace will do the following:
1) Display the A2L Refrigerant Leakage code (EA0)
2) Shut down the gas operation
3) Energize the optional ventilation and alarm outputs.
4) Run the fan at max CFM airow
The control will exit the verication function if:
1) The 5 minute timeout expires or
2) An alarm or fault is detected or
3) The user turns OFF the A2L Function Verication.
background
25
WARNING
To avoid possible unsatisfactory operation of equipment
damage due to underfiring or equipment, use the proper size
of natural/propane gas piping needed when running pipe from
the meter/tank to the furnace.
Gas Piping Connections
½
”
¾
”
1
”
1¼” 1 ½”
10 132 278 520 1050 1600
20 92 190 350 730 1100
30 73 152 285 590 980
40 63 130 245 500 760
50 56 115 215 440 670
60 50 105 195 400 610
70 46 96 180 370 560
80 43 90 170 350 530
90 40 84 160 320 490
100 38 79 150 305 460
CFH = BTUH Furnace Input _______________
_________
Heating Value of Gas (BTU/Cubic Foot)
Natural Gas Capacity of Pipe
In Cubic Feet of Gas Per Hour (CFH)
Nominal Black Pipe Size
Length of
Pipe in Feet
(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on
0.60 Specific gravity Gas)
The gas piping supplying the furnace must be properly
sized based on the gas ow required, specic gravity of the
gas, and length of the run. The gas line installation must
comply with local codes, or in their absence, with the latest
edition of the National Fuel Gas Code, NFPA 54/ANSI
Z223.1 or CAN/CSA B149.1-15.
To connect the furnace to the building’s gas piping, the
installer must supply a ground joint union, drip leg, manual
shuto󰀨 valve, and line and ttings to connect to gas valve.
In some cases, the installer may also need to supply a
transition piece from 1/2” pipe to a larger pipe size.
The following stipulations apply when connecting gas
piping. Refer to Gas Piping Connections gure for typical
gas line connections to the furnace.
• Gas piping must be supported external to the furnace
cabinet so that the weight of the gas line does not
distort the burner rack, manifold or gas valve.
• Use black iron or steel pipe and ttings for building
piping. Where possible, use new pipe that is properly
chamfered, reamed, and free of burrs and chips. If old
pipe is used, be sure it is clean and free of rust, scale,
burrs, chips, and old pipe joint compound.
• Use pipe joint compound on male threads ONLY.
Always use pipe joint compound (pipe dope) that
is APPROVED FOR ALL GASES. DO NOT apply
compound to the rst two threads.
• Use ground joint unions.
• Install a drip leg to trap dirt and moisture before it can
enter the gas valve. The drip leg must be a minimum
of three inches long.
The high altitude, kit will provide the proper design certied
input rate within the specied altitude range.
Do not derate the furnace by adjusting the manifold
pressure to a lower pressure than specied on the furnace
rating plate. The combination of the lower air density and a
lower manifold pressure will prohibit the burner orice from
drawing the proper amount of air into the burner. This may
cause incomplete combustion, ashback, and possible
yellow tipping.
In some areas the gas supplier may articially derate the
gas in an e󰀨ort to compensate for the e󰀨ects of altitude.
If the gas is articially derated, the appropriate orice size
must be determined based upon the BTU/ft
3
content of the
derated gas and the altitude. Refer to the National Fuel
Gas Code, NFPA 54/ANSI Z223.1 or CAN/CSA B149.1-15
in Canada, and information provided by the gas supplier to
determine the proper orice size.
Propane Gas Conversion
WARNING
Possible property damage, personal injury or death may
occur if the correct conversion kits are not installed. The
appropriate kits must be applied to ensure safe and proper
furnace operation. All conversions must be performed by a
qualified installer or service agency.
This unit is congured for natural gas. The appropriate
manufacturer’s propane gas conversion kit, must be
applied for propane gas installations. Refer to the Propane
Gas and/or High Altitude Installations for details.
Consult the furnace Specication Sheet for a listing of
appropriate kits. The indicated kits must be used to insure
safe and proper furnace operation. All conversions must be
performed by a qualied installer, or service agency.
Gas Valve
This unit is equipped with a 24 volt gas valve controlled
during furnace operation by the integrated control
module. As shipped, the valve is congured for natural
gas. The valve is eld convertible for use with propane
gas by replacing the regulator spring with a propane gas
spring from an appropriate manufacturer’s propane gas
conversion kit. Taps for measuring the gas supply pressure
and manifold pressure are provided on the valve.
The gas valve has a manual ON/OFF control located on
the valve itself. This control may be set only to the “ON”
or “OFF” position. Refer to the lighting instructions label
or Startup Procedure & Adjustment for use of this control
during start up and shut down periods.
background
26
Alternate
Gas Line
Location
Gas Valve
Burners
Manual Shut Off Valv
e
(upstream from
ground joint
pipe union)
Drip Leg
Grommet
in Standard
Gas Line
Hole
*Ground
Joint
Pipe
Union
*Ground
Joint
Pipe
Union
*NOTE: Union may be inside furnace cabinet where allowed by local codes.
Manifold
Figure 35
Alternate
Gas Line
Location
Plug in
Alternate
Gas Line
Hole
Gas Valve
Burners
Manual Shut Off Valve
(upstream from ground joint pipe union)
Drip Leg
Grommet
in Standard
Gas Line
Hole
*Ground
Joint
Pipe Unio
n
*Ground
Joint
Pipe Union
*NOTE: Union ma
y
be inside furnace cabinet where allowed b
y
local codes.
Figure 36
Drip Leg
Plug in Main Gas Line Hole
Alternate
Union
Location
Manual Shut Off Valve
(upstream from
ground joint pipe union)
Gas
Valve
Burners
Drain Trap
Manifold
Plug in Alternate Gas Line Hole
Grommet in
Standard Gas Line Hole
Figure 37
• Install a 1/8” NPT pipe plug tting, accessible for test
gage connection, immediately upstream of the gas
supply connection to the furnace.
• Always use a back-up wrench when making the
connection to the gas valve to keep it from turning.
The orientation of the gas valve on the manifold must
be maintained as shipped from the factory. Maximum
torque for the gas valve connection is 375 in-lbs;
excessive over-tightening may damage the gas valve.
• Install a manual shuto󰀨 valve between the gas
meter and unit within six feet of the unit. If a union
is installed, the union must be downstream of the
manual shuto󰀨 valve, between the shuto󰀨 valve and
the furnace.
• Tighten all joints securely.
• Connection method must be in compliance with all
local and national codes. US: National Fuel Gas Code
(NFGC) NFPA 54-2015 / ANSI Z223.1-2015 and the
Installation Standards, Warm Air Heating and Air
Conditioning Systems ANSI / NFPA 90B
In Canada, CANADA: National Standard of Canada,
Natural Gas and Propane Installation Code
(NSCNGPIC) CAN/CSA B149.1-15
• Connect the furnace to the building piping by one of
the following methods:
– Rigid metallic pipe and ttings.
– Semi-rigid metallic tubing and metallic ttings.
Aluminum alloy tubing must not be used in exterior
locations. In order to seal the grommet cabinet
penetration, rigid pipe must be used to reach the
outside of the cabinet. A semi-rigid connector to the
gas piping may be used from there.
• Use listed gas appliance connectors in accordance
with their instructions. Connectors must be fully in the
same room as the furnace.
• Protect connectors and semirigid tubing against
physical and thermal damage when installed. Ensure
aluminum-alloy tubing and connectors are coated to
protect against external corrosion when in contact
with masonry, plaster, or insulation, or subjected to
repeated wetting by liquids such as water (except rain
water), detergents, or sewage.
The gas piping may enter the left or right side of the
furnace cabinet. The installer must supply rigid pipe long
enough to reach the outside of the cabinet to seal the
grommet cabinet penetration. A semi-rigid connector to the
gas piping can be used outside the cabinet per local codes.
1/2” NPT pipe and ttings are required. For models with an
“L” shaped manifold, a 4 1/2” long nipple is required. For
models with a hook shaped manifold, a 2” long nipple is
required.
A semi-rigid connector to the gas piping can be used
outside the cabinet per local codes. From the elbow, the
length of pipe and the ttings required will vary by the side
chosen, location of union and cabinet width. The union may
be placed inside or outside of the cabinet.
background
27
200 PSIG
Maximum
5 to 15 PSIG
(20 PSIG Max.)
Continuous
11" W.C.
Second Stage
Regulator
First Stage
Regulator
Propane Gas Installation (Typ.)
Figure 39
A gas detecting warning system is the only reliable way to
detect a propane gas leak. Rust can reduce the level of
odorant in propane gas. Do not rely on your sense of smell.
Contact a local propane gas supplier about installing a
gas detecting warning system. If the presence of gas
is suspected, follow the instructions listed in the Safety
Considerations section of this manual.
All propane gas equipment must conform to the safety
standards of the National Board of Fire Underwriters,
NBFU Manual 58.
CANADA: National Standard of Canada, Natural Gas and
Propane Installation Code (NSCNGPIC) CAN/CSA B149.1-
15.
For satisfactory operation, propane gas pressure must be
10” WC at the furnace manifold with all gas appli ances in
operation. Maintaining proper gas pressure depends on
three main factors:
1. Vaporization rate, depending on temperature of the
liquid, and “wetted surface” area of the con tainer or
containers.
2. Proper pressure regulation (Two-stage regulation is
recommended for both cost and e󰀩ciency).
3. Pressure drop in lines between regulators, and
between second stage regulator and the appliance.
Pipe size will depend on length of pipe run and total
load of all appliances.
Complete information regarding tank sizing for vaporiza-
tion, recommended regulator settings, and pipe sizing is
available from most regulator manufacturers and propane
gas suppliers.
Always use a pipe thread sealant approved for all gases.
DUCT WORK
Duct systems and register sizes must be properly designed
for the CFM and external static pressure rat ing of the
furnace. Design the ductwork in accor dance with the
recommended methods of “Air Conditioning Contractors of
America” Manual D.
Manual Shut Off Valve
(upstream from
ground joint
pipe union)
Figure 38
Gas Piping Checks
CAUTION
To avoid the possibility of explosion or fire, never use a
match or open flame to test for leaks.
Before placing unit in operation, leak test the unit and gas
connections.
Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector, or
other approved testing methods.
NOTE: Never exceed specified pressures for
testing. Higher pressure may damage the gas valve
and cause subsequent overfiring, resulting in heat
exchanger failure.
Disconnect this unit and shuto󰀨 valve from the gas supply
piping system before pressure testing the supply piping
system with pressures in excess of 1/2 psig (3.48 kPa).
Isolate this unit from the gas supply piping system by
closing its external manual gas shuto󰀨 valve before
pressure testing supply piping system with test pressures
equal to or less than 1/2 psig (3.48 kPA).
Propane Gas Tanks and Piping
WARNING
If the gas furnace is installed in a basement, an excavated
area or confined space, it is strongly recommended to
contact a propane supplier to install a gas detecting
warning device in case of a gas leak.
• Since propane gas is heavier than air, any leaking gas
can settle in any low areas or confined spaces.
• Propane gas odorant may fade, making gas undetectable
except with a warning device.
background
28
For example:
-.1 0 .1 .2 .3
Difference is .4
.
.
Static reading from return duct = -.1” w.c.
Static reading from supply duct = .3” w.c.
Total external static pressure on this system =.4” w.c.
NOTE: Both readings may be taken simultaneously
and read directly on the manometer if so
desired. If an air conditioner coil or Electronic
Air Cleaner is used in conjunction with the
furnace, the readings must also include theses
components, as shown in the following drawing.
4. Consult the proper tables for the quantity of air.
If the total external static pressure exceeds the maximum
listed on the furnace rating plate, check for closed
dampers, registers, undersized and/or oversized poorly laid
out duct work.
NOTE: The temperature rise of the furnace must
be within the temperature rise range listed on the
furnace rating plate.
Bottom Return Air Opening [Upflow Models]
The bottom return air opening on upow models utilizes
a “lance and cut” method to remove sheet metal from the
duct opening in the base pan. To remove, simply press
out the lanced sections by hand to expose the metal strips
retaining the sheet metal over the duct opening. Using
tin snips, cut the metal strips and remove the sheet metal
covering the duct opening. In the corners of the opening,
cut the sheet metal along the scribe lines to free the duct
anges. Using the scribe line along the duct ange as a
guide, unfold the duct anges around the perimeter of the
opening using a pair of seamer pliers or seamer tongs.
NOTE: Airflow area will be reduced by
approximately 18% if duct flanges are left in
factory position. This could cause performance
issues and noise issues.
Install the duct system in accordance with Standards of
the National Board of Fire Underwriters for the Installation
of Air Conditioning, Warm Air Heating and Ventilating
Systems. Pamphlets No. 90A and 90B.
A closed return duct system must be used, with the return
duct connected to the furnace. NOTE: Ductwork must
never be attached to the back of the furnace. For upow
installations requiring 1800 CFM or more, use either two
side returns or bottom return or a combination of side /
bottom. Flexible joints may be used for supply and return
con nections to reduce noise transmission. To prevent the
blower from inter fering with combustion air or draft when a
central return is used, a connecting duct must be installed
between the unit and the utility room wall. Never use a
room, closet, or alcove as a return air chamber.
When furnace duct(s) supply air outside the space
containing the furnace, a return air duct must terminate in
the same space as the supply duct and be sealed to the
furnace casing.
Checking Duct Static
WARNING
Never allow the products of combustion, including carbon
monoxide, to enter the return duct work or circulation air
supply.
Refer to your furnace rating plate for the maximum ESP
(external duct static) rating.
Total external static refers to everything external to the
furnace cabinet. Cooling coils, lters, ducts, grilles,
registers must all be considered when reading your total
external static pressure. The supply duct pressure must be
read between the furnace and the cooling coil. This reading
is usually taken by removing the “A” shaped block o󰀨
plate from the end on the coil; drilling a test hole in it and
reinstalling the block o󰀨 plate. Take a duct static reading
at the test hole. Tape up the test hole after your test is
complete. The negative pressure must be read between
the lter and the furnace blower.
Too much external static pressure will result in insu󰀩cient
air that can cause excessive temperature rise. This can
cause limit switch tripping and heat exchanger failure.
To determine total external duct static pressure, proceed as
follows:
1. With clean lters in the furnace, use a manometer to
measure the static pressure of the return duct at the
inlet of the furnace. (Negative Pressure)
2. Measure the static pressure of the supply duct.
(Positive Pressure)
3. The di󰀨erence between the two numbers is .4” w.c.
background
29
Filters - Read This Section Before Installing
The Return Air Duct
CUT USING TIN SNIPS
SCRIBE LINES OUTLINING
DUCT FLANGES
Dual Flange Cut Outs
Figure 41
Filters must be used with this furnace. Discuss lter
maintenance with the building owner. Filters do not ship
with this furnace, but must be provided, sized and installed
externally by the installer. Filters must comply with UL900
or CAN/ULCS111 standards. Damage or repairs due to
the installation of the furnace without lters is not covered
under the warranty.
On upow units, guide dimples locate the side return cutout
locations. Use a straight edge to scribe lines connecting
the dimples. Cut out the opening on these lines.
NOTE: An undersized opening will cause reduced
airflow.
Horizontal Installations
Filters must be installed in either the central return register
or in the return air duct work.
Upright Installations
Depending on the installation and/or customer preference,
di󰀨ering lter arrangements can be applied. Filters can
be installed in the central return register or a side panel
external lter rack kit (upows). As an alternative a media
air lter or electronic air cleaner can be used as the
requested lter. Consider installing an air cleaner with
deep-pleated media lter at the time of furnace installation.
A deep-pleated lter with a MERV rating of 8 (minimum)
will often provide better ltration to protect equipment and
the air distribution system than a standard 1” lter and
often has lower static pressure loss than a 1” lter. Also
a deep-pleated lter will typically require less frequent
replacement intervals. Avoid using highly restrictive 1”
lters which produce static pressure loss greater than .25”
W.C. In some installations the minimum lter size required
will not lend itself to a lter installation on the side of the
furnace. The installation of a centrally installed air cleaner
cabinet or a return duct lter installation may o󰀨er more
practicality.
CUTAWAY OF DUCTWORK
TO EXPOSE COIL
DIGITAL
MANOMETER
RETURN
AIR
Mode
.
SUPPLY
AIR
Figure 40
When the furnace is used in connection with a cooling unit,
the furnace should be installed in parallel with or on the
upstream side of the cooling unit to avoid condensa tion
in the heating element. With a parallel ow arrange ment,
the dampers or other means used to control the ow of
air must be adequate to prevent chilled air from entering
the furnace and, if manually operated, must be equipped
with means to prevent operation of either unit unless the
damper is in the full heat or cool position.
WARNING
Edges of sheet metal holes may be sharp. Use gloves as
a precaution when removing sheet metal from return air
openings.
When the furnace is installed without a cooling coil, it is
recommended that a removable access panel be provided
in the outlet air duct. This opening shall be accessible
when the furnace is installed and shall be of such a size
that the heat exchanger can be viewed for visual light
inspection or such that a sampling probe can be inserted
into the airstream. The access panel must be made to
prevent air leaks when the furnace is in operation.
When the furnace is heating, the temperature of the return
air entering the furnace must be between 55°F and 100°F.
background
30
AIR FLOW
CENTRAL
RETURN
GRILLE
FILTER
SUPPORT
BRACKET
(Field Supplied)
Possible Upright Counterflow Filter Locations
Figure 48
ELECTRICAL CONNECTIONS
WARNING
High voltage!
To avoid the risk of electrical shock, wiring
to the unit must be polarized and grounded.
WARNING
High voltage!
To avoid personal injury or death due to
electrical shock, disconnect electrical power
before servicing or changing any electrical
wiring.
CAUTION
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and dangerous
operation. Verify proper operation after servicing.
Wiring Harness
The wiring harness is an integral part of this furnace. Field
alteration to comply with electrical codes should not be
required. Wires are color coded for identication purposes.
Refer to the wiring diagram for wire routings. If any of
the original wire as supplied with the furnace must be
replaced, it must be replaced with wiring material having
a temperature rating of at least 105°C. Any replacement
wiring must be a copper conductor.
Clean Comfort™ brand MERV 11 air cleaners have
5¼” media lters and are available in the following
congurations. Consult your distributor for information on
our complete line of IAQ Clean Comfort™ products.
Model Minimum Recommended Filter Size^
*RVT960403BN* 1 - 16 X 25 Side or Bo�om
*RVT960603BN* 1 - 16 X 25 Side or Bo�om
*RVT960803BN* 1 - 16 X 25 Side or Bo�om
*RVT960804CN* 1 - 16 X 25 Side or Bo�om
*RVT961005CN* 1 - 20 X 25 Bo�om or 2 - 16 X 25 Side Return
*RVT961005DN* 1 - 20 X 25 Bo�om or 2 - 16 X 25 Side Return
*RVT961205DN* 1 - 20 X 25 Bo�om or 2 - 16 X 25 Side Return
*DVT960403BN* 2 - 10 X 20 or 1 - 16 X 25 Top Return
*DVT960603BN* 2 - 10 X 20 or 1 - 16 X 25 Top Return
*DVT960804CN* 2 - 10 X 20 or 1 - 16 X 25 Top Return
*DVT961005CN* 2 - 14 X 20 or 1 - 20 X 25
Top Return
*DVT961205DN* 2 - 14 X 20 or 1 - 20 X 25 Top Return
^ Larger filters may be used, filters may also be centrally located
The following figures show possible filter locations.
FILTER
AIR FLOW
CENTRAL
RETURN
GRILLE
FILTER
SIDE RETURN
EXTERNAL FILTER
RACK KIT
(EITHER SIDE)
Possible Upright Upflow
Figure 47
background
31
WARNING
To prevent personal injury or death due to electric shock,
disconnect electrical power before installing or servicing
this unit.
Line voltage connections can be made through either the
right or left side panel. The furnace is shipped congured
for a left side electrical connection. To make electrical
connections through the opposite side of the furnace, the
junction box must be relocated to the right side prior to
making electrical connections. To relocate the junction box,
perform the following steps.
1. Remove the burner compartment door.
2. Remove and save the two screws securing the
junction box to the side panel.
3. Remove and save the two screws securing the
junction box to the side panel.
4. Relocate junction box and associated plugs and
grommets to opposite side panel. Secure with screws
removed in step 2.
To ensure proper unit grounding, the ground wire should
run from the furnace ground screw located inside the
furnace junction box all the way back to the electrical
panel. NOTE: Do not use gas piping as an electrical
ground. To conrm proper unit grounding, turn o󰀨 the
electrical power and perform the following check.
1. Measure resistance between the neutral (white)
connection and one of the burners.
2. Resistance should measure 10 ohms or less.
This furnace is equipped with a blower door interlock
switch which interrupts unit voltage when the blower door
is opened for servicing. Do not defeat this switch.
115 Volt Line Connections
Before proceeding with electrical connections, ensure
that the supply voltage, frequency, and phase correspond
to that specied on the unit rating plate. Power supply to
the furnace must be NEC Class 1, and must comply with
all applicable codes. The furnace must be electrically
grounded in accordance with local codes or, in their
absence, with the latest edition of The National Electric
Code, ANSI NFPA 70 and/or The Canadian Electric Code
CSA C22.1.
Use a separate fused branch electrical circuit containing
properly sized wire, and fuse or circuit breaker. The fuse
or circuit breaker must be sized in accordance with the
maximum overcurrent protection specied on the unit
rating plate. An electrical disconnect must be provided at
the furnace location.
Connect hot, neutral, and ground wires as shown in the
wiring diagram located on the unit’s blower door. Metal
conduit is not considered a substitute for an actual ground
wire to the unit.
Line polarity must be observed when making eld
connections. Line voltage connections can be made
through either the right or left side panel. The furnace
is shipped congured for a right side electrical
connection with the junction box located inside the burner
compartment (blower compartment for downows). To
make electrical connections through the opposite side of
the furnace, the junction box must be relocated to the other
side of the burner (or blower) compartment prior to making
electrical connections. To relocate the junction box, follow
the steps shown below.
NOTE: Wire routing must not to interfere with
circulator blower operation, filter removal, or
routine maintenance.
Junction Box Relocation
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
background
32
Any single-stage 24VAC thermostat can be used. For
proper operation the thermostat must be setup to control a
single-stage AC outdoor unit and to control a single stage
gas furnace. The control board does not accommodate an
O wire thermostat input (reversing valve signal). If a heat
pump is installed, the thermostat should be setup as stated
above. Setting the thermostat for the heat pump control or
multi stage control may result in incorrect performance.
1. Connect all necessary thermostat wires to the
thermostat connector on the furnace control as
instructed by the applicable wiring diagrams shown in
this section.
2. Connect the 1 & 2 wires between the indoor and
outdoor unit for communicating operation.
NOTE: Verify two stage outdoor units include a 24
VAC transformer (for outdoor control board power)
Two stage outdoor units may not behave properly
without this 24 VAC transformer.
R
C
G
Y
Optional
Optional
Optional if
feature
supported by
thermostat
INDOOR
BOARD TERMINAL
CONNECTIONS
OUTDOOR
BOARD TERMINAL
CONNECTIONS
OUTDOOR
TRANSFORMER
1
2
C
R
C
G
Y
1
2
C
Communicating Two Stage Air Conditioner or Heat Pump
Figure 52
1
2
C
R
C
G
Y
Optional
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
OUTDOOR
BOARD TERMINAL
CONNECTIONS
1
2
C
R
C
G
Y
24 VAC
Thermostat
Communicating Inverter Air Conditioner or Heat Pump
Figure 53
3. Download the CoolCloud HVAC phone application for
charging and to congure/test system operations.
4. Conrm thermostat heating and cooling calls function
properly with equipment.
CoolCloud™ HVAC Phone Application
Actual screens may look di󰀨erent based on the mobile
device being used.
Figure 49 Figure 50
Figure 51
This furnace is Bluetooth ready and functions with the
CoolCloud HVAC phone application designed to improve
the contractor’s setup / diagnostic experience. Users can
see specic model information, review active diagnostic
error codes, observe system status during operation,
make system menu adjustments, add site visit notes and
run system testing of all operational modes (heat / cool /
fan) directly from the phone. The phone application is also
capable of directly updating the furnace software anytime
updates are available. The application will automatically
notify the user if updates are available.
NOTE: The software update may take up to 20
minutes to complete.
Quick Start Guide For Communicating
Outdoor Units
EXTREMELY IMPORTANT: For all cooling calls the system
only requires a single Y input from the thermostat. For all
heating calls (including dual fuel applications) the system
only requires a single W input from the thermostat. Internal
algorithms will control all available cooling and heating
stages including dual fuel operation based on these inputs.
background
33
1. Use the wiring diagrams below to connect low voltage
thermostat wires.
NOTE: When installing the furnace with a non
communicating heat pump wire directly from the
“O” terminal on the thermostat to the reversing
valve “O” terminal on the non communicating heat
pump. See Figure 53 for single stage and Figure 54
for the two stage diagrams.
R
C
G
Y
Optional
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
1
2
C
R
C
G
Y
C
Y
Remote
Condensing Unit
(Single-Stage Cooling)
24 VAC
Thermostat
Non-communicating Single Stage A/C
Figure 54
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
1
2
C
R
C
G
Y
C
Y
Remote
Condensing Unit
(Two-Stage Cooling)
24 VAC
Thermostat
Y2
Non-communicating Two Stage A/C
Figure 55
NOTE: When new versions of Bluetooth
Communication Software and Furnace Control
Software are available, the phone application
notifies the user. Software updates are classified
as either optional or mandatory and installed by
using the phone application. Ensure all mandatory
software updates have been installed. Review
notes for optional software updates and install if
necessary.
NOTE: If an E11 code exists for the inverter system
immediately after line voltage is applied (code
shown in the CoolCloud HVAC phone application
or displayed on the inverter control), the System
Verification Test needs to be completed before
any other operation. See the following procedure.
1. Allow the system to remain Idle for 5 minutes.
2. Turn the system verication test on either by using
the phone application, or by entering the SUt menu
through the furnace push buttons.
3. Wait for the test to complete.
Charging
1. Inverter units using the CoolCloud HVAC phone
application or control board push button:
a. Inverter units are charged by setting
the CR9 menu (Charge Mode) to ON through
the furnace control board push buttons
or through the CoolCloud HVAC phone
application.
b. The System will remain in charge mode (high
speed) for 60 minutes before timing out.
c. The installer must manually shut o󰀨 charge
mode once complete.
2. Two-stage outdoor units using the CoolCloud HVAC
application:
a. Charge the outdoor unit as required using the
charging information provided with the outdoor
equipment.
Gas Furnace Testing
1. Two-stage Operation using the CoolCloud HVAC
application:
a. Select the gas heat icon after entering the
furnace menus.
b. Select any value less than 50% for low stage
operation and any value greater than 50% for
high stage operation.
Quick Start Guide For Non-Communicating
Outdoor Units
EXTREMELY IMPORTANT: For two-stage gas
heating, the system only needs a single W input.
Internal algorithms will control staging of the
gas furnace automatically based on the single W
input. For non-communicating outdoor unit wiring
see instructions below.
background
34
4. Go to the tonnage units menu (ton) and select the
tonnage value that corresponds to the desired airow
for the outdoor unit. See the following table.
NOTE: The arrow next to the display windows
refers to the correct orientation for reading
characters on the display.
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
Y
24 VAC
Thermostat
1
2
C
Heat Pump
Optional
R
C
Y
Non-Communicating Single Stage Heat Pump
Figure 56
R
C
G
Y
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
R
C
G
Y
24 VAC
Thermostat
1
2
C
Two Stage
Heat Pump
R
C
Y
Y2
Y2
Non-Communicating Two Stage Heat Pump
Figure 57
2. Download the CoolCloud HVAC phone application.
NOTE: When new versions of Bluetooth
Communication Software and Furnace Control
Software are available, the phone application
notifies the user. Software updates are classified
as either optional or mandatory and installed by
using the phone application. Ensure all mandatory
software updates have been installed. Review
notes for optional software updates and install if
necessary.
3. Select the Non-Comm Outdoor Setting menu (OdS)
using the on board push buttons or the CoolCloud
HVAC phone application. Select 1 AC for single stage
Air Conditioners, 1HP for single stage heat pumps,
2 AC for two stage air conditioners and 2 HP for two
stage Heat Pumps.
background
35
R
W
DH/Y2
24 VAC
Thermostat
Indoor
Board Terminal
Connections
C
G
Optional
Optional
Dehum
R
W
C
G
Gas Heat Only
Figure 58
2. Download the CoolCloud HVAC phone application
and use it to congure/test furnace operations.
NOTE: When new versions of Bluetooth
Communication Software and Furnace Control
Software are available, the phone application
notifies the user. Software updates are classified
as either optional or mandatory and installed by
using the phone application. Ensure all mandatory
software updates have been installed. Review
notes for optional software updates and install if
necessary.
Gas Furnace Testing
a. Two-stage Operation using the CoolCloud
HVAC application:
a. Select the gas heat icon after entering the
furnace menus.
b. Select any value less than 50% for low
stage operation and any value greater than
50% for high stage operation.
3. Conrm thermostat heating call functions properly
with equipment.
NOTE: For two stage non-communicating outdoor
units, system will stage airflow automatically for
low stage operation.
Tonnage
Selection
Airflow
Tonnage
Selection
Airflow
Tonnage
Selection
Airflow
Tonnage
Selection
Airflow
1 400
2.3 920 3.6 1440 4.9 1960
1.1 440 2.4 960 3.7 1480
5
2000
1.2 480 2.5 1000 3.8 1520 5.1 2040
1.3 520 2.6 1040 3.9 1560 5.2 2080
1.4 560 2.7 1080 4 1600 5.3 2120
1.5 600 2.8 1120 4.1 1640 5.4 2160
1.6 640 2.9 1160 4.2 1680 5.5 2200
1.7 680
3 1200 4.3 1720 5.6 2240
1.8 720 3.1 1240 4.4 1760 5.7 2280
1.9 760 3.2 1280 4.5 1800 5.8 2320
2 800 3.3 1320 4.6 1840 5.9 2360
2.1 840 3.4 1360 4.7 1880 6 2400
2.2 880 3.5 1400 4.8 1920
NOTE: The system will not provide airflows above
the Max Airflow Value.
3 Ton Models = 1,400 CFM
4 Ton Models = 1,760 CFM
5 Ton Models = 2,200 CFM
5. Use the CoolCloud HVAC phone application to
congure/test furnace operations.
NOTE: The phone application cannot test a non-
communicating outdoor unit. The thermostat will
be required for outdoor unit testing.
Gas Furnace Testing
a. Two stage operation using the CoolCloud
HVAC application:
a. Select the gas heat icon after entering the
furnace menus.
b. Select any value less than 50% for low
stage operation and any value greater than
50% for high stage operation.
6. Conrm thermostat heating and cooling calls
function properly with equipment.
Quick Start Guide for Gas Heat Only Setup
(No Outdoor Unit)
EXTREMELY IMPORTANT: The furnace only requires
a single W input for 2 stage gas heat control.
Internal algorithms will control staging of the
gas furnace automatically.
1. Connect all necessary thermostat wires to the
thermostat connector on the furnace control as shown
in the following diagram.
background
36
NOTE: After scrolling to the desired option
within a menu, that option may be flashing on the
7-segment displays. This indicates the option has
not been officially selected. Pressing the Center
button two times will select that option. The first
press will stop the flashing. The second will make
the selection official and return you to the main
menu.
ACCESSORIES
Optional Field installed Supply Air & Return Air
Temperature Sensors
Optional Supply Air Sensor 0130F00933 & Return Air
Sensor 0130F00934 are available for purchase from
your distributor.
If an external humidier, dehumidier or ventilator is
installed, it may require airow from the HVAC system to
function accordingly.
1. Make sure the installed 24VAC thermostat is capable
of controlling the accessory or accessories.
2. Connect the appropriate accessory control wires
to the accessory devices from the thermostat
(See thermostat manual for connection and setup
instructions).
3. If the thermostat is capable of providing a continuous
fan call (G signal) during accessory operation:
Make sure to connect the thermostat G terminal to
the G terminal on the indoor unit. Setup thermostat
to ensure G signal is energized during accessory
operation.
Figure 60
4. Select the appropriate fan only airow for the
accessory using the indoor unit push button menus or
the CoolCloud HVAC phone application.
5. Using the thermostat, independently test each
accessory in addition to independently testing
continuous fan mode.
Dehumidification
Dehumidication allows the furnace’s circulator blower to
operate at a reduced speed during a combined thermostat
call for cooling demand with a parallel humidistat. This
lower blower speed increases dehumidication of the
conditioned air as it passes through the indoor coil. The
control board is equipped with a 24 volt dehumidication
input (DH) located on the thermostat wiring connector.
The terminal can be congured to enable dehumidication
when the input is energized or de-energized. When using
an external dehumidistat, connect it between the R and DH
terminals. If the humidistat closes on humidity rise or the
thermostat energizes this terminal when dehumidication is
required, set the control board “dHL” (Dehum Logic) menu
setting to “HI” using the push buttons or CoolCloud HVAC
phone application. If the humidistat opens on humidity
rise or the thermostat de-energizes this terminal when
dehumidication is required, set the “dHL” (Dehum Logic)
menu to “Lo” using the push buttons or CoolCloud HVAC
phone application.
Auxiliary Alarm Switch
The control is equipped with a 24VAC Aux Alarm to be
used for a condensate switch install (designated by
CONDENSATE IN/OUT on the control). By default, the
connected AUX switch is normally closed and opens when
the water level in the evaporator coil base pan reaches an
undesirable level. The control responds by displaying an
EEf error code and turning o󰀨 the outdoor condensing unit.
If the AUX switch is detected to be in the closed position
for 30 seconds, normal operation resumes and the error
message is no longer displayed.
Push Button Menu
LEFT CENTER
RIGHT
Figure 59
The furnace includes three on-board push buttons allowing
users to navigate indoor and outdoor system menus. The
Right and Left buttons allow the user to scroll through the
main menus and to then scroll through available options
within specic menus. The Center button is used to enter
into a main menu and to then permanently select options
within those menus.
background
37
• Prole B (2) ramps up to full cooling demand airow
by rst stepping up to 50% of the full demand for
30 seconds. The motor then ramps to 100% of the
required airow. A one (1) minute OFF delay at 100%
of the cooling airow is provided.
50% CFM
1/2 min
100% CFM
100% CFM
1 min
OFF
OFF
Figure 62
Ramping Profiles
The variable-speed circulator o󰀨ers four di󰀨erent ramping
proles. These proles may be used to enhance cooling
performance and increase comfort level. Select ramping
proles on the user menu.
• Prole A (1) provides only an OFF delay of one (1)
minute at 100% of the cooling demand airow.
OFF
100% CFM 100% CFM
1 min
OFF
Figure 61
R-32 SENSOR
24 VOLT A2L ALARM
(OPTIONAL))
24 VOLT VENTILATION
(OPTIONAL)
CONNECTION
LOCATION
FOR RA SENSOR
CONNECTION
LOCATION
FOR SA SENSOR
24 VOLT HUM.
(OPTIONAL)
background
38
• All eld wiring must conform to applicable codes.
• If it is necessary for the installer to supply additional
line voltage wiring to the inside of the furnace, the
wiring must conform to all local codes, and have a
minimum temperature rating of 105°C.
• All line voltage wire splices must be made inside the
furnace junction box.
Low Voltage Ventilation
The Ventilation connections provide dry contact for eld
ventilator wiring connections. These connections are
normally open and energize during the R-32 fault/alarm
condition. A VT IN and a VT OUT connectors are provided
and are shown in the image below.
Low Voltage A2L Alarm
The A2L alarm connection provides 24VAC for eld alarm
wiring connections. These connections are normally open
and energize during the R-32 fault/alarm condition. An A2L
Alarm connector is provided and is shown in the image
below.
Field Installed Accessories
Additional accessories that do not have dedicated
terminals on the furnace control board may require an
additional daughter board to be installed. Please refer to
service manual on your product for more information.
NOTE: This furnace is equipped with a control
board that is capable of monitoring for R-32
refrigerant leaks in the indoor refrigeration unit.
Please verify that the r-32 sensor wire is plugged
in to the furnace control board before startup,
if applicable. If furnace is not paired with a R-32
Refrigeration system, the default settings in the
furnace control board will need to be changed.
Please see the R-32 section for additional
information.
STARTUP PROCEDURE & ADJUSTMENT
Furnace must have a 115 VAC power supply properly
connected and grounded. Proper polarity must be
maintained for correct operation. In addition to the following
start-up and adjustment items, refer to further information
in Operational Checks section.
Furnace Cabinet
Check that all furnace cabinet sealing components are in
place (plugs, grommets, gaskets). NOTE: If the furnace
bottom panel has not been removed for a return duct
connection, all perforations must be sealed with duct
sealant compound or other suitable method to prevent
air leakage. For optimal performance verify that all door
gaskets are properly in place and replace as needed to
prevent air leakage.
• Prole C (3) ramps up to 85% of the full cooling
demand airow and operates there for approximately
7 1/2 minutes. The motor then steps up to the full
demand airow. Prole C also has a one (1) minute
100% OFF delay.
100% CFM
OFF
OFF
Figure 63
• Prole D (4) ramps up to 50% of the demand for 1/2
minute, then ramps to 85% of the full cooling demand
airow and operates there for approximately 7 1/2
minutes. The motor then steps up to the full demand
airow. Prole D has a 1/2 minute at 50% airow OFF
delay.
OFF
OFF
Figure 64
115 Volt Line Connection or Electronic Air
Cleaner
WARNING
High voltage!
To avoid personal injury or death due to
electrical shock, disconnect electrical power
before servicing or changing any electrical
wiring.
The accessory load specications are as follows:
EAC 1.0 AMP maximum at 120 VAC
The furnace integrated control module is equipped with
a line voltage accessory terminal for controlling power
to an optional eld supplied electronic air cleaner or any
device required to operate in parallel with a circulating fan
demand.
To connect an electronic air cleaner using the line voltage
EAC terminal:
• Turn OFF power to the furnace before installing any
accessories.
• Follow the air cleaner manufacturers’ instructions
for locating, mounting, grounding, and controlling
accessories. Utilize 1/4” quick connect terminals to
make accessory wiring connections to the furnace
integrated control module.
• Connect the hot terminal utilized for accessory
operation to the EAC terminal and the neutral side
of power to NEUTRAL bus on the integrated furnace
control or the neutral connection in the furnace
junction box.
background
39
Drain Trap Priming
The drain trap MUST be primed prior to furnace startup.
To prime, ll both sides of the drain trap with water.
This ensures proper furnace drainage upon startup and
prohibits the possibility of ue gases escaping through the
drain system.
Furnace Operation
Purge gas lines of air prior to startup. Be sure not purge
lines into an enclosed burner compartment. Follow NFPA
54, National Fuel Gas Code for proper purging methods.
In Canada, follow approved purging methods in CAN/CSA
B149.1-15.
Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector,
or other approved method. Verify that all required kits
(propane gas, high altitude, etc.) have been appropriately
installed.
Furnace Startup
1. Close the manual gas shuto󰀨 valve external to the
furnace.
2. Turn o󰀨 the electrical power to the furnace.
3. Set the room thermostat to the lowest possible
setting.
4. Remove the burner compartment door.
NOTE: This furnace is equipped with an ignition
device which automatically lights the burner. Do
not try to light the burner by hand.
5. Move the furnace gas valve manual control to the
OFF position.
6. Wait ve minutes then smell for gas. Be sure check
near the oor as some types of gas are heavier than
air.
7. If you smell gas after ve minutes, immediately follow
the safety instructions in the Safety Considerations
on page 3 of this manual. If you do not smell gas after
ve minutes, move the furnace gas valve manual
control to the ON position.
8. Replace the burner compartment door.
9. Open the manual gas shuto󰀨 valve external to the
furnace.
10. Turn on the electrical power to the furnace.
11. Adjust the thermostat to a setting above room
temperature.
12. After the burners are lit, set the thermostat to desired
temperature.
Furnace Shutdown
Set the thermostat to the lowest setting. The integrated
control will close the gas valve and extinguish ame.
Following a 15 second delay, the induced draft blower will
be de-energized. After the blower o󰀨 delay time expires,
the blower de-energizes.
13. Remove the burner compartment door and move the
furnace gas valve manual control to the OFF position.
14. Close the manual gas shuto󰀨 valve external to the
furnace.
15. Replace the burner compartment door.
Gas Supply Pressure Measurement
White-Rodgers Model 36J54 (Two-Stage)
White-Rodgers Model 36J54 (Two-Stage)
Figure 65A
M
a
no
m
e
t
er
M
a
n
o
m
e
t
e
r
H
o
s
e
High Fire Regulator
Adjust
Regulator
Vent
O
n
/O
f
f S
w
i
tc
h
H
ig
h
Fi
re
C
oi
l
T
e
rm
i
na
l
(
H
I)
C
o
a
x
i
al
C
o
il
Te
r
m
in
a
l
(
M
)
Common
Terminal(C)
White-Rodgers Model 36J54 Connected to Manometer
Mode
3.5
White-Rodgers Model 36J54 Connected to Manometer
Figure 65B
Natural Gas Minimum: 4.5" w.c. Maximum: 10.0" w.c.
Propane Gas Minimum: 11.0" w.c. Maximum: 13.0" w.c.
INLET GAS SUPPLY PRESSURE
CAUTION
To prevent unreliable operation or equipment damage, the
inlet gas supply pressure must be as specified on the unit
rating plate with all other household gas fired appliances
operating.
The line pressure supplied to the gas valve must be within
the range specied below. The supply pressure can be
measured at the gas valve inlet pressure tap or at a hose
tting installed in the gas piping drip leg. The supply
pressure must be measured with the burners operating.
To measure the gas supply pressure, use the following
procedure.
1. Turn OFF gas to furnace at the manual gas shuto󰀨
valve external to the furnace.
2. Connect a calibrated manometer (or appropriate gas
pressure gauge) at either the gas valve inlet pressure
tap or the gas piping drip leg. See White-Rodgers
36J54 gas valve (Figure 43B) to locate the inlet
pressure tap.
background
40
Mode
10.0
Measuring Inlet Gas Pressure (alt. method)
Figure 66
NOTE: When converting from natural gas to L.P.
consult your distributor for proper conversion
kit.
Range Nominal
Low Stage 1.6 - 2.2" w .c. 1.9" w .c.
High Stage 3.2 - 3.8" w .c. 3.5" w .c.
Low Stage 5.7 - 6.3" w .c. 6.0" w .c.
High Stage
9.7 - 10.3" w .c.
10.0" w .c.
Manifold Gas Pressure
Gas
Natural
Propane
Gas Input Rate Measurement (Natural Gas Only)
The actual gas input rate to the furnace must never be
greater than that specied on the unit rating plate. To
measure natural gas input using the gas meter, use the
following procedure.
1. Turn OFF the gas supply to all other gas-burning
appliances except the furnace.
2. While the furnace is operating at high re rate, time
and record one complete revolution of the gas meter
dial, measuring the smallest quantity, usually the dial
that indicates 1/2 cu. ft. per revolution. You will use this
number to calculate the quantity of gas in cubic ft. if
the furnace would consume if it ran steadily for one
hour (3600 seconds).
NOTE: If using the inlet pressure tap on the White-
Rodgers 36J54 gas valve, then use the 36G/J Valve
Pressure Check Kit, Part No. 0151K00000S.
3. Turn ON the gas supply and operate the furnace and
all other gas consuming appliances on the same gas
supply line.
4. Measure furnace gas supply pressure with burners
ring. Supply pressure must be within the range
specied in the Inlet Gas Supply Pressure table.
If supply pressure di󰀨ers from table, make the necessary
adjustments to pressure regulator, gas piping size, etc.,
and/or consult with local gas utility.
5. Turn OFF gas to furnace at the manual shuto󰀨 valve
and disconnect manometer. Reinstall plug before
turning on gas to furnace.
6. Turn OFF any unnecessary gas appliances stated in
step three.
Gas Manifold Pressure Measurement
and Adjustment
CAUTION
To prevent unreliable operation or equipment damage,
the gas manifold pressure must be as specified on the unit
rating plate. Only minor adjustments should be made by
adjusting the gas valve pressure regulator.
Only small variations in gas pressure should be made by
adjusting the gas valve pressure regulator. The manifold
pressure must be measured with the burners operating.
To measure and adjust the manifold pressure, use the
following procedure.
1. Turn OFF gas to furnace at the manual gas shuto󰀨
valve external to the furnace.
2. Turn o󰀨 all electrical power to the system.
3. Outlet pressure tap connections:
White-Rodgers 36J54 valve: Back outlet pressure
test screw (inlet/outlet pressure tap) out one turn
(counterclockwise, not more than one turn).
4. Attach a hose and manometer to outlet pressure tap .
5. Turn ON the gas supply.
NOTE: Follow this procedure to test the gas valve
pressure at 100% firing rate.
Run High Fire
NOTE: The Cool Cloud phone application be used
to assist with all functional tests. See the quick
start guide section for details.
The furnace should be inspected by a qualied installer, or
service agency at least once per year. This check should
be performed at the beginning of the heating season.
This will ensure that all furnace components are in proper
working order and that the heating system functions
appropriately. Pay particular attention to the following
items. Repair or service as necessary.
background
41
SUPPLY
AIR
RETURN
AIR
Temperature Rise Measurement
Temperature Rise Measurement
Figure 67
Diagnostics
Accessing the furnace’s diagnostic menu provides access
to the last six faults detected by the furnace. Faults are
stored most recent to least recent. Any consecutively
repeated fault is stored a maximum of three times.
EXAMPLE: A clogged return air lter causes the furnace
limit to trip repeatedly. The control will only store this fault
the rst three consecutive times the fault occurs.
NOTE: It is highly recommended that the fault
history be cleared when performing maintenance
or servicing the furnace.
3. If the 1/2 cu. ft. dial was used, multiply your number by
two. EXAMPLE: If it takes 23 seconds to complete
one revolution of the 1/2 ft. dial (23 x 2 = 46).
This tells us that at this rate, it would take 46 seconds to
consume one cu. ft. of gas. 3600 / 46 = 78.
This tells us that in one hour, the furnace would consume
78 cu. ft. of gas. The typical value range for 1 cu. ft. of
natural gas is around 1000 BTU. Check with your gas
utility, if possible. In this example, the furnace is consuming
78,000 BTUH.
NOTE: The final manifold pressure cannot vary
by more than ± 0.3” w.c. for Natural and + 0.5” for
LP from the specified setting. Consult your local
gas supplier if additional input rate adjustment is
required.
4. Turn ON gas to and relight all other appliances
turned o󰀨 in step 1. Be certain that all appliances
are functioning properly and that all pilot burners are
operating.
Temperature Rise
Temperature rise must be within the range specied on the
unit rating plate. An incorrect temperature rise may result
in condensing in or overheating of the heat exchanger.
An airow and temperature rise table is provided in the
Specication Sheet applicable to your model. Determine
and adjust temperature rise as follows:
1. Operate furnace with burners ring for approximately
ten minutes. Ensure all registers are open and all
duct dampers are in their nal (fully or partially open)
position.
2. Place thermometers in the return and supply ducts as
close to the furnace as possible. Thermometers must
not be inuenced by radiant heat by being able to
“see” the heat exchanger.
3. Subtract the return air temperature from the supply
air temperature to determine the air temperature rise.
Allow adequate time for thermometer readings to
stabilize.
4. Adjust temperature rise by adjusting the circulator
blower speed. Increase blower speed to reduce
temperature rise. Decrease blower speed to increase
temperature rise. Refer to Startup Procedure and
Adjustment - Circulator Blower Speeds for speed
changing details.
background
42
• Circulator blower continues running for the selected
heat o󰀨 delay period. The blower speed during this
period depends on the last heat call provided by the
thermostat. If the last call for heat was a call for low
heat, the air circulator motor will run on low heat
speed for the duration of the heat o󰀨 delay period. If
the last call for heat was a call for high heat, the air
circulating motor will run on low heat speed for the
duration of the heat o󰀨 delay period. If the last call
for heat was a call for high heat, the air circulating
motor will run on the high heating speed for thirty (30)
seconds and then switch to the low heating speed for
the reminder of the heat o󰀨 delay period.
• Circulator blower and electronic air cleaner terminal
are de-energized.
• Circulator blower shuts o󰀨 after the heat o󰀨 delay
period expires.
• Furnace awaits next call from thermostat.
Operational Checks
The burner ames should be inspected with the burner
compartment door installed. Flames should be stable,
quiet, soft, and blue (dust may cause orange tips but
they must not be yellow). Flames should extend directly
outward from the burners without curling, oating, or lifting
o󰀨. Flames must not impinge on the sides of the heat
exchanger ring tubes.
SAFETY CIRCUIT DESCRIPTION
Do not bypass safety devices.
WARNING
A number of safety circuits are employed to ensure safe
and proper furnace operation. These circuits serve to
control any potential safety hazards and serve as inputs
in the monitoring and diagnosis of abnormal function.
These circuits are continuously monitored during furnace
operation by the integrated control module.
Integrated Control Module
The integrated control module is an electronic device
which, if a potential safety concern is detected, will take the
necessary precautions and provide diagnostic information
through an LED.
Primary Limit
The primary limit control is located on the partition panel
and monitors heat exchanger compartment temperatures.
It is a normally-closed (electrically), automatic reset,
temperature-activated sensor. The limit guards against
overheating as a result of insu󰀩cient conditioned air
passing over the heat exchanger.
NORMAL SEQUENCE OF OPERATION
Power Up
The normal power up sequence is as follows:
• 115 VAC power applied to furnace.
• Integrated control module performs internal checks.
• Integrated control module monitors safety circuits
continuously.
• The furnace enters a three minute power up delay to
make sure the system is setup properly. During this
time thermostat calls will not be recognized.
• Furnace awaits call from thermostat. 7-segment LED’s
display Id L while awaiting call from thermostat.
Heating Mode
The normal operational sequence in heating mode is as
follows:
• W thermostat contact closes, initiating a call for heat.
• Integrated control module performs safety circuit
checks.
• Induced draft blower is energized on high speed for a
15-second prepurge.
• Induced draft blower steps to low speed following
prepurge. Low stage pressure switch contacts are
closed.
• Igniter warm up begins upon Inducer draft blower
step to low speed and presence of closed low stage
pressure switch contacts.
• Gas valve opens at end of igniter warm up period,
delivering gas to burners and establishing ame.
• Integrated control module monitors ame presence.
Gas valve will remain open only if ame is detected.
• Based on the furnace internal control algorithms the
gas valve and induced draft blower may continue
operating on low stage or both will change to high
stage. After a power cycle, the rst gas heat call will
result in high stage operation.
• Circulator blower is energized on heat speed following
the selected blower on delay and will begin to ramp
up. Electronic air cleaner terminal is energized with
circulator blower.
• Furnace is now operating on the specied stage
determined by the internal control algorithm.
• Furnace runs, integrated control module monitors
safety circuits continuously.
• If the internal algorithm changes the call from low
heat to high heat, the integrated control module
will immediately switch the induced draft blower,
gas valve, and circulator blower to their high stage
settings.
• If the internal algorithm changes the call from high
heat to low heat, the control will immediately switch
the induced draft blower and gas valve to their low
stage settings. The circulator blower remains on high
heating speed for 30 seconds before switching to the
low heat circulating speed.
• The W terminal thermostat contacts open, which ends
the call for heat.
• The gas valve closes, extinguishing the ame.
• Induced draft blower is de-energized following a 15
second post purge.
background
43
1. Disconnect all power to the furnace. Do not touch
the integrated control module or any wire connected
to the control prior to discharging your body’s
electrostatic charge to ground.
2. Firmly touch a clean, unpainted, metal surface of the
furnace away from the control. Any tools held in a
person’s hand during grounding will be discharged.
3. Service integrated control module or connecting
wiring following the discharge process in step 2.
Use caution not to recharge your body with static
electricity; (i.e., do not move or shu󰀪e your feet, do
not touch ungrounded objects, etc.). If you come in
contact with an ungrounded object, repeat step 2
before touching control or wires.
4. Discharge your body to ground before removing a
new control from its container. Follow steps 1 through
3 if installing the control on a furnace. Return any old
or new controls to their containers before touching
any ungrounded object.
Diagnostic Chart
WARNING
High voltage!
To avoid personal injury or death due to
electrical shock, disconnect electrical
power BEFORE performing any service or
maintenance.
Refer to the Troubleshooting Chart in the back of this
manual for assistance in determining the source of unit
operational problems. The 7-segment LED displays will
display an error code that may contain a letter and number.
The error code may be used to assist in troubleshooting
the unit.
Resetting From Lockout
Furnace lockout results when a furnace is unable to
achieve ignition after three attempts during a single call for
heat. It is characterized by a non-functioning furnace and
an EE0 code displayed on the 7-segment display. If the
furnace is in “lockout”, it will (or can be) reset in any of the
following ways.
1. Automatic reset. The integrated control module will
automatically reset itself and attempt to resume
normal operations following a one hour lockout period.
2. Manual power interruption. Interrupt 115 volt power to
the furnace.
3. Manual thermostat cycle. Lower the thermostat
so that there is no longer a call for heat for 1 - 20
seconds then reset to previous setting.
NOTE: If the condition which originally caused the
lockout still exists, the control will return to
lockout. Refer to the Troubleshooting Chart for
aid in determining the cause.
Auxiliary Limit
The auxiliary limit controls are located on or near the
circulator blower and monitors blower compartment
temperatures. They are a normally-closed (electrically),
manual-reset sensors. These limits guard against
overheating as a result of insu󰀩cient conditioned air
passing over the heat exchanger.
Rollout Limit
The rollout limit controls are mounted on the burner/
manifold assembly and monitor the burner ame. They
are normally-closed (electrically), manual-reset sensors.
These limits guard against burner ames not being
properly drawn into the heat exchanger.
Pressure Switches
The pressure switches are normally-open (closed during
operation) negative air pressure-activated switches. They
monitor the airow (combustion air and ue products)
through the heat exchanger via pressure taps located on
the induced draft blower and the coil front cover. These
switches guard against insu󰀩cient airow (combustion
air and ue products) through the heat exchanger and/or
blocked condensate drain conditions.
Flame Sensor
The ame sensor is a probe mounted to the burner/
manifold assembly which uses the principle of ame
rectication to determine the presence or absence of ame.
Burner Flame
Figure 68
TROUBLESHOOTING
Electrostatic Discharge (ESD) Precautions
NOTE: Discharge body’s static electricity before
touching unit. An electrostatic discharge can
adversely affect electrical components.
Use the following precautions during furnace installation
and servicing to protect the integrated control module
from damage. By putting the furnace, the control, and the
person at the same electrostatic potential, these steps
will help avoid exposing the integrated control module to
electrostatic discharge. This procedure is applicable to both
installed and uninstalled (ungrounded) furnaces.
background
44
MAINTENANCE
Annual Inspection
WARNING
To avoid electrical shock, injury or death,
disconnect electrical power before
performing any maintenance. If you must
handle the igniter, handle with care. Touching
the igniter element with bare fingers, rough
handling or vibration could damage the
igniter resulting in premature failure. Only
a qualified servicer should ever handle the
igniter.
The furnace should be inspected by a qualied installer, or
service agency at least once per year. This check should
be performed at the beginning of the heating season.
This will ensure that all furnace components are in proper
working order and that the heating system functions
appropriately. Pay particular attention to the following items
Repair or service as necessary.
• Flue pipe system. Check for blockage and/or leakage.
Check the outside termination and the connections at
and internal to the furnace.
• Heat exchanger. Check for corrosion and/or buildup
within the heat exchanger passageways.
• Burners. Check for proper ignition, burner ame, and
ame signal.
• Wiring. Check electrical connections for tightness and/
or corrosion. Check wires for damage.
• Filters.
• R-32 Sensor Wire. Check R-32 sensor wire
connection for tightness and check wire for damage.
FILTERS
Filter Maintenance
Improper lter maintenance is the most common cause
of inadequate heating or cooling performance. Filters
should be cleaned (permanent) or replaced (disposable) as
required.
Burners
Visually inspect the burner ames periodically during the
heating season. Turn on the furnace at the thermostat and
allow several minutes for ames to stabilize, since any
dislodged dust will alter the ames normal appearance.
Flames should be stable, quiet, soft, and blue (dust may
cause orange tips but they must not be yellow). They
should extend directly outward from the burners without
curling, oating, or lifting o󰀨. Flames must not impinge on
the sides of the heat exchanger ring tubes.
Induced Draft and Circulator Blowers
CAUTION
To ensure proper unit performance, adhere to the filter
sizes given in the recommended minimum filter size table or
specification sheet applicable to your model.
The bearings in the induced draft blower and circulator
blower motors are permanently lubricated by the
manufacturer. No further lubrication is required. Check
motor windings for accumulation of dust which may cause
overheating. Clean as necessary.
Condensate Trap and Drain System
(Qualified Servicer Only)
Annually inspect the drain tubes, drain trap, and eld-
supplied drain line for proper condensate drainage. Check
drain system for hose connection tightness, blockage, and
leaks. Clean or repair as necessary.
Flame Sensor (Qualified Servicer Only)
Under some conditions, the fuel or air supply can create a
nearly invisible coating on the ame sensor. This coating
acts as an insulator causing a drop in the ame sense
signal. If the ame sense signal drops too low the furnace
will not sense ame and will lock out. The ame sensor
should be carefully cleaned by a qualied servicer using
steel wool.
Flue Passages (Qualified Servicer Only)
The heat exchanger ue passageways should be inspected
at the beginning of each heating season.
BEFORE LEAVING AN INSTALLATION
• Cycle the furnace with the thermostat at least three
times. Verify cooling and fan only operation.
• Review the Owner’s Manual with the homeowner and
discuss proper furnace operation and maintenance.
• Leave literature packet near furnace.
REPAIR AND REPLACEMENT PARTS
• When ordering any of the listed functional parts, be
sure to provide the furnace model, manufacturing, and
serial numbers with the order.
• Although only functional parts are shown in the parts
list, all sheet metal parts, doors, etc. may be ordered
by description.
• Parts are available from your distributor.
Functional Parts List-
Gas Valve Blower Motor
Gas Manifold Blower Wheel
Natural Gas Orice Blower Mounting Bracket
Propane Gas Orice Blower Cuto󰀨
Igniter Blower Housing
Flame Sensor Inductor
Rollout Limit Switch Heat Exchanger with
Recuperator Coil
Primary Limit Switch Auxiliary Limit Switch
Pressure Switch Integrated Control Module
Induced Draft Blower Transformer
Door Switch Bluetooth Module
background
45
MENU OPTIONS
LED
Display
Menu Description
SE
Aux (condensate switch enabled)
St
Enable or disable inverter boost operation.
(compressor speed may increase when this feature is
on) (inverter only)
tt
Boost mode will operate above this selected
temperature. On = boost mode always on (default =
105°F) (inverter only)

Cooling Airflow Profile setting (default = profile D shown
as 4)

Heat Pump compressor lockout temperature. Furnace
will act as primary heat source below this temperature.
(Default = 45°F)
dL
Compressor off delay at the beginning and end of a
defrost cycle.(default = 30 seconds)
d
Cooling Airflow Off Delay Time. (default = 60 seconds)
L Resets all cooling settings to factory default.
d Cooling Airflow On Delay Time (default = 5 seconds)
 Control Firmware Revision Number
 Enable or disable inverter charge mode.

Select the range that includes the desired compressor
RPS for inverter cooling operation. See inverter manual
for menu options
S
Maximum Compressor RPS for cooling mode. (inverter
only)
St
Percentage of high stage cooling airflow to run during
low stageoperation. (default = 70%)
t Cooling Airflow Trim (default 0%)
t
High Cooling Airflow Trim for inverter units. See inverter
manual for menu options and defaults
tI
Intermediate Cooling Airflow Trim for inverter units. See
inverter manual for menu options and defaults
tL
Low Cooling Airflow Trim for inverter units. See inverter
manual for menu options and defaults
dI
Compressor run time between defrost cycles. (default =
30 minutes) (2 stage units)
dE
Enables or disables dehumidification feature in the
outdoor unit. (default = Enabled)
dL
Select "1" to enable dehumidification when the
thermostat DH terminal is energized. Select "0" to
enable dehumidification when the thermostat DH
terminal is de-energized. (default = 1)
dS
Gas heat operation during defrost. 1 = low heat, 2
(default) = high heat
L
View 6 most recent fault codes and Clear Fault Codes if
desired (outdoor communicating units)
d
Force system into a defrost cycle (inverter units)
Sd
Constant Fan Speed as percent of maximum airflow.
Default = 25%

Gas Heat Airflow (percentage of maximum system
airflow)
d Gas Heat Fan Off Delay (default = 90 seconds)
d Gas Heat Fan On Delay (default = 30 seconds)
t
Enables gas heat at 100% for pressure testing during
commissioning.
LED
Display
Menu Description
St
Percentage of high stage gas heating airflow to run
during low
stage gas heat operation. (default = 70%)
t
Gas Heat Airflow Trim (default = 0%)
dI
Maximum Compressor Run Time Between Defrost
Cycles (default
= 120 minutes)
d
Heat Pump Heating Airflow Off Delay Time (default = 60
seconds)
d
Heat Pump Heating Airflow On Delay Time (default = 5
seconds)

Select the range that includes the desired compressor
RPS for inverter heating operation. See inverter manual
for menu options
S
Maximum Compressor RPS for Heating Mode (inverter
only)
t
Reset all heat pump heating settings to factory default.
St
Percentage of high stage heat pump heating airflow to
run during
low stage operation. (default = 70%)
t
Heat Pump Indoor Airflow Trim (default = 0%)
t
High Heating Airflow Trim for Inverter Units. See inverter
manual for
menu options and defaults
tI
Intermediate Heating Airflow Trim for Inverter Units. See
inverter
manual for menu options and defaults
tL
Low Heating Airflow Trim for Inverter Units. See inverter
manual for
menu options and defaults
L
View 6 most recent fault codes and clear all fault codes
if desired (furnace)
L
Restart communications between the indoor and
outdoor unit.
dS
Select the number of stages for the non-
communicating outdoor unit. Default = OFF meaning no
outdoor unit.
d Enable Pump Down Mode
d Resets furnace settings to factory defaults.
St
Maximum Current Option (system will limit capacity to
percentage
of maximum current) (default = 100%)
S Control Shared Data Revision Number
St
Resets all outdoor unit settings to factory defaults.
SUt System Verification Test (inverters only)
t
Indoor Airflow for non-communicating outdoor units.
(values based on 400CFM per ton) (default = 3.0 Ton)
Ut
Select Outdoor Unit Elevation (SL=same level, OL =
outdoor lower, IL = indoor lower) Default = Outdoor
Lower
S
1 = system will try to satisfy the thermostat quickly.
5 (default) = system will try to satisfy the thermostat
more slowly.
background
46
STATUS CODESMENU OPTIONS
LED
Display
Menu Description

Menu is enabled if the CFS menu is set to 6. Select the
target time the system will attempt to satisfy the
thermostat.

Menu is enabled if the CFS menu is set to 6. Select the
percentage past the target time when the system will
transition to gas furnace operation during heat mode.

Menu is enabled if the CFS is set to 6. (the gas furnace
will run during the next heat call if the heat pump fails to
satisfy the custom target time for this number of
consecutive cycles) (default = 20 cycles)

Menu is enabled if the CFS menu is set to 6. (if low
stage gas heat is able to consecutively satisfy the
thermostat under the set target time for this number of
cycles, the system will transition to the heat pump for
primary heating)

Menu is enabled if the CFS menu is set to 6. (this
percentage will help determine when switching back to
heat pump operation is appropriate. Default = 20%. If
target time = 20 minutes, low stage furnace operation
must satisfy the thermostat by less than 16 minutes.
(target time - 20% default = 16 minutes).
LED
Display
Description of System Status

Compressor Cooling, Low Stage (non-communicating
units)

Compressor Cooling, High Stage (non-communicating
units)

Compressor Heat, Low Stage (non-communicating
units)

Compressor Heat, High Stage (non-communicating
units)

Compressor Cooling, Single-Stage (single stage non-
comm. units)

Compressor Cooling, Low Stage (communicating
units)

Compressor Cooling, High Stage (communicating
units)
 Defrost, Low Stage Gas Heat
 Defrost, High Stage Gas Heat
 Dehumidification
 Constant Fan

Compressor Heat, Single-Stage (single stage non-
comm. units)
 Gas Heat, Low Stage
 Gas Heat, High Stage

Compressor Heat, Single-Stage (Single Stage Non
Comm. Units)
 Compressor Heat, Low Stage (Communicating Units)
 Compressor Heat, High Stage (Communicating Units)
 Idle
 Inverter Cooling
 Inverter Heating


Last 10 Faults

A2L Function Verification
A2L Function Enabled
background
47
TROUBLESHOOTING CHART
Symptom
LED
Status
Fault Description Corrective Actions
Furnace fails to operate  Equipment lacks shared data
Populate shared data set using CoolCloud
HVAC App
Normal operation  Normal operation None
Furnace fails to operate
No 115 power to furnace or no 24 volt power to
integrated control module.
Restore high voltage power to furnace and
integrated control module.
Blown fuse or tripped circuit breaker
Correct condition which caused fuse to open,
replace fuse.
Integrated control module is non - functional
Replace non-functional integrated control
module.
Furnace fails to operate 
Circulator blower motor is not running when it
should be running.
Tighten or correct wiring connection. Verify
continuous circuit through inductor Replace if
open or short circuit.
Check circulator blower motor, replace if
necessary.
Tighten or correct wiring connection.
Check circulator blower motor. Replace if
necessary.
Check integrated control module, replace if
necessary.
Verify circulator blower motor horse power
match with nameplate, replace if necessary
.
Verify shared data set is correct for the specific
model, re-populate data using CoolCloud
HVAC App
Check filters for blockage, clean filters or remove
obstruction
.
Check ductwork for blockage and verify all
registers are fully open.
Verify ductwork is appropriately sized for system,
resize and/or replace ductwork if necessary.
Furnace fails to operate 
Circulator blower motor senses a loss of rotor
control.
Circulator blower motor senses high current.
Check filters, filter grille, registers, duct system
and equipment inlet/outlet for blockage, make
necessary corrections and retest.
Furnace fails to operate 
Circulator blower motor fails to start 10
consecutive times.
Check circulating blower for obstructions.
Repair or replace blower motor or wheel as
required.
Check circulating blower shaft for proper rotatio
n.
Circulator blower motor shuts down for over or
under voltage condition.
Circulator blower motor shuts down due to over
temperature condition on power module.
Circulator blower motor lacks information to
operate properly.
Check for locked rotor condition.
Motor fails to start 40 consecutive times.
Check integrated control module and verify it is
populated with the correct shared data.
Furnace fails to operate 
Furnace fails to ope
rate 
Check voltage to furnace and verify within
nameplate specified range.
Circulat
or blower motor is operating in a power,
temperature, or speed limiting condition.

Furnace operates at reduced
performance
Airflow delivered is less than
expected
Circulator blower motor horse power in shared
data set does not match circulator blower motor
horse power.
Furnace fails to operate
Integrated control module has lost
communications with circulator blower motor.
Furnace fails to operate

Integrated control module LED
display provides no signal
background
48
TROUBLESHOOTING CHART
Symptom
LED
Status
Fault Description Corrective Actions
Check filters for blockage, clean filters or remove
obstruction
.
Check ductwork for blockage and verify all
registers are fully open.
Verify ductwork is appropriately sized for system,
resize as necessary.
Furnace fails to operate 
Grounding fault
Poor neutral connection
Verify neutral wire connection to furnace &
continuity to ground source.
Furnace fails to operate  Open roll out switch
Check for correct gas pressure. Check for
correct burner alignment.
Check for and correct burner restriction.
NOTE: Allow time as the control may take up to
90 seconds to detect sensors.
Verify that the sensor
probe is plugged in all the
way.
Verify that the sensor probe connector is
properly crimped.
Verify that resistance across the sensor probe is
10kΩ at 77°F. Resistance is lower at
temperatures higher than 77°F. Resistance is
higher at temperatures lower than 77°F.
Replace PCB.
Check sensor probe terminals & conductors for
electrical short.
Check PCB connector for shorts if sensor short
error reported when sensor probe is not
plugged in.
Replace PCB.
Airflow is lower than demanded
Furnace operates at reduced
performance or operates on low
stage when high stage is expected
Return Air Temperature Sensor Circuit is Open
(External)

External return air temperature
reading not visible on CoolCloud
app

External return air te
mperature
reading not visible on CoolCloud
app
Return Air Temperature Sensor Circuit is
Shorted (External)
background
49
TROUBLESHOOTING CHART
Symptom
LED
Status
Fault Description Corrective Actions
NOTE: Allow time as the control may take up to
90 seconds to detect sensors.
Verify that the sensor probe is plugged in all the
way.
Verify that the sensor probe connector is
properly crimped.
Verify that resistance across the sensor probe is
10kΩ at 77°F. Resistance is lower at
temperatures higher than 77°F. Resistance is
higher at temperatures lower than 77°F.
Replace PCB.
Check sensor probe terminals & conductors for
electrical short.
Check PCB connector for shorts if sensor short
error reported when sensor probe is not
plugged in.
Replace PCB.
Power cycle the furnace, the control may take up
to 90 seconds to detect sensors.
Check PCB for any visible electrical or
mechanical damage to onboard sensor (R311).
Replace PCB.
Power cycle the furnace, the control may take up
to 90 seconds to detect sensors.
Ensure there are no foreign objects on the PC
B
that could cause an electrical short at onboard
sensor (R311).
Replace PCB.
Furnace fails to operate  Data not yet on network
Populate shared data set using CoolCloud
HVAC App
Operation different than expected o
r
no operation
 Invalid shared data
Onboard return air temperature sensor is
unplugged

Onboard return air temperature
reading not visible on CoolCloud
app

Onboard return air temperature sensor is
shorted
Onboard return air temperature
reading not visible on CoolCloud
app
Supply Air Temperature Sensor Circuit is Open
(External)

Supply air temperature reading not
visible on CoolCloud app

Supply Air Temperature Sensor Circuit is
Shorted (External)
Supply air temperature reading not
visible on CoolCloud app
Verify shared data set is correct for the specific
model, re-populate data using CoolCloud
HVAC App
background
50
TROUBLESHOOTING CHART
Slow closing gas valve.
Symptom
LED
Status
Fault Description Corrective Actions
Locate and correct gas interruption.
Check front cover pressure switch operation and
verify proper drainage (hose, wiring, contact
operation), correct if necessary.
Replace or realign igniter.
Check flame sense signal, clean sensor if
coated or oxidized.
Check flue piping for blockage, proper length,
elbows, and termination.
Verify proper induced draft blower performance.
Low stage pressure switch circuit is closed at
start of heating cycle.
Low stage pressure switch contacts sticking.
Short in pressure switch circuit wiring.
Low stage pressure switch circuit is not closed.
Pressure switch hose blocked pin
ched, or
connected improperly.
Inspect flue and/or inlet air piping for blockage,
proper length, elbows, and termination.
Check drain system, correct as necessary.
Check induced draft blower performance, correct
as necessary.
Incorrect pressure switch set point or
malfunctioning switch contacts.
Check pressure switch operation, replace as
needed.
Loose or improperly connected wiring.
Tighten or correct wiring connection.
Primary limit circuit is open.
Check filters and ductwork for blockage. Clean
filters or remove obstruction.
Insufficient conditioned air over the heat
exchanger.
Check circulator blower speed and performance.
Blocked filters, restrictive ductwork, improper
circulator blower speed, or failed circulator
blower motor.
Correct speed or replace blower motor if
necessary.
Loose or improperly connected wiring in high
limit circuit.
Tighten or correct wiring connection.
Flame sensed with no call for heat.
Correct short at flame sensor or in flame sensor
wiring.
Short to ground in flame sense circuit.
Lingering burner flame.
Open fuse. Replace fuse.
Short in low voltage wiring. Locate and correct short in low voltage wiring.
Flame sense micro amp signal is low.
Flame sensor is coated/oxidized.
Flame sensor incorrectly positioned in burner.
Check inlet air piping for blockage, proper
length, elbows, and termination.
Compare current gas pressure to rating plate
and adjust as needed.
Replace low stage pressure switch. Repair short
in wiring.

Circulator blower runs continuously
No furnace operation
Furnace fails to operate 
Furnace lockout due to an excessive number of
ignition “retries” (3 total).
Failure to establish flame.
Loss of flame after establishment.
Furnace fails to operate 
Inspect pressure switch hose, repair/replace if
necessary.
Blocked flue and/or inlet air pipe, blocked drain
system or weak i
nduced draft blower.

Induced draft blower runs
continuously with no furnace
operation
No furnace operation 
Clean flame s
ensor if coated or oxidized Inspect
for proper flame sensor alignment.
Induced draft blower and circulator
blower runs continuously
No furnace operation

Check for lingering or lazy flame. Verify proper
operation of gas valve.
Lazy burner flame due to improper gas pressure
or combustion air.
Normal furnace operation 
background
51
Symptom
LED
Status
Fault Descrip�on Correc�ve Ac�ons
Furnace fails to operate

Problem with igniter circuit
Improperly connected or shorted igniter
Poor unit ground Igniter relay fault on integrated
control module
Check and correct wiring from integrated control module to igniter
Diagnose and replace shorted igniter as needed
Verify and correct unit ground wiring if needed
Check igniter output from control, replace if necessary
Furnace fails to operate on high
stage; furna
ce operates normally
on low stage
Induced dra� blower opera�ng

High stage pressure switch circuit is closed at
start of hea�ng cycle
High stage pressure switch contacts s�cking
Shorts in pressure switch circuit wiring
Diagnose and replace high stage pressure switch if needed
Repair short in wiring
Furnace fails to operate on high
stage; furnace operates normally
on low stage
Induced dra� blower opera�ng

High stage pressure switch circuit is not closed
Insp
ect pressure switch hose, repair/replace if necessary
Inspect flue and/or inlet air piping for blockage, proper length,
elbows, and termina�on
Check drain system, correct as necessary
Check induced dra� blower performance, correct as necessary
Tighten or correct wiring connec�on
Furnace fails to operate

Polarity of 115 volt AC is reversed
Poor unit ground
Correct polarity, check and correct wiring if necessary
Verify proper ground, correct if necessary
Furnac
e fails to operate

Gas valve is not energized when it should be
External Gas Valve Error
Check wiring in gas valve circuit
Replace integrated control board
Furnace fails to operate

Gas valve is energized when it should not be
Internal gas valve error
Check wiring in gas valve circuit
Replace integrated control board
Furnace fails to operate
Integrated control module LED
display provides  error code

Aux limit switch open (blower compartment)
Che
ck filters and ductwork for blockage
Clean filters or remove obstruc�on
Check circulator blower speed and performance
Correct speed or replace blower motor if necessary
Tighten or correct wiring connec�on
Furnace fails to operate
Integrated control module LED
display provides  error code.

Aux limit switch (condensate switch) open Check evap drain pan, trap, piping
Furnace stops hea�ng and
only the fan is opera�ng
Furnace stops hea�ng and
only the fan is opera�ng
Furnace stops hea�ng and
only the fan is opera�ng
Furnace stops hea�ng and
only the fan is opera�ng




Furnace has lost communica�on with the
R-32 sensor and the furnace is in mi�ga�on
mode.
R-32 sensor has detected a refrigerant leak
and furnace is in mi�ga�on mode.
R-32 sensor has detected a fault and the
furnace is in mi�ga�on mode.
A2L relay in the furnace control board has
detected a fault and the furnace is in
mi�ga�on mode.
Inves�gate the indoor coil for a refrigerant leak.
Furnace will resume normal opera�on once a leak is not detected
and the 5 minute delay period is over.
Inves�gate the R-32 sensor.
Replace the R-32 sensor
Inves�gate A2L relay.
Cycle power on the furnace.
Replace integrated control board.
Verify wire connec�on to R-32 sensor is not loose.
Verify that the R-32 sensor wire is not damaged.
Replace R-32 Sensor.
TROUBLESHOOTING CHART
background
52
WIRING DIAGRAM
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
HIGH VOLTAGE!
D
ISCONNECT
ALL
POWER
BEFORE
SERVICING
OR
INSTALLING
THIS
UNIT
.
M
ULTIPLE
POWER
SOURCES
MAY
BE
PRESENT
. F
AILURE
TO
DO
SO
MAY
CAUSE
PROPERTY
DAMAGE
,
PERSONAL
INJURY
OR
DEATH
.
TONNAGE MENU
TONNAGE
SELECTION
AIR
FLOW
TONNAGE
SELECTION
AIR
FLOW
1.0400 3.6 1440
1.1440 3.7 1480
1.2480 3.8 1520
1.3520 3.9 1560
1.4560 4.0 1600
1.5600 4.1 1640
1.6640 4.2 1680
1.7680 4.3 1720
1.8720 4.4 1760
1.9760 4.5 1800
2.0800 4.6 1840
2.1840 4.7 1880
2.2880 4.8 1920
2.3920 4.9 1960
2.4960 5.0 2000
2.510005.1 2040
2.6 10405.2 2080
2.710805.3 2120
2.811205.4 2160
2.911605.5 2200
3.012005.6 2240
3.112405.7 2280
3.212805.8 2320
3.313205.9 2360
3.413606.0 2400
3.51400
OR
0140F20014-A
PU
BK
WH
WH
PK
RD
WH
BK
WH
GR
RD
RD
BK
GY
BL
NO
2
PK
TRANSFORMER
40 VA
BR
WH
N
NO
3
OR
1
SWITCH
PRESSURE
LOW FIRE
SENSOR
FLAME
GR
PRESSURE SWITCH
FRONT COVER
C
VAC
1
PU
RD
1
115
WH
GR
YL
GY
WH
NO
WH
1
PU
WH
L
RD
PK
BK
5
SWITCH ASSEMBLY
ID BLOWER TWO-STAGE PRESSURE
OR
WH
PK
RD
2
4
BK
C
GND
BLOWER
CIRCULATOR
YL
DISCONNECT
(WHITE-RODGERS)
GAS VALVE
TWO STAGE
YL
GND
VAC
CHASSIS
GROUND
2
3
4
IGNITER
SURFACE
HOT
2
GND
YL
BR
C
C
BLOWER
DRAFT
INDUCED
M
BK
24
BK
3
HI
OR
RD
BK
BURNER COMPARTMENT
WH
BK
JUNCTION BOX
PK
RD
10
6
3
13
4
5
2
7
14
11
15
1
12
8
9
FUSE
3A
CENTER
RIGHT
LEFT
C
RAT
GND
GND
SAT
IGN
IND-HI
IND-LO
IND-N
IGN-N
LINE
NEUTRAL
DE
Y
G
W
C
R
R1
2
NA
HUM
CONDEN
-SATE
ECM
6
1
6
1
FS
EAC
1
2
4
2
3
1
3
5
1
4
BK
RD
GY
BK
BL
PK
IN
OUT
CONDENSATE
SWITCH
(OPTIONAL)
LIMIT
CONTROL
AUXILIARY
AUTO RESET
BLOWER COMPARTMENT
HARNESS
ECM MTR
GR
GND
BL
YL
LOW VOLTAGE (24V)
LOW VOLTAGE FIELD
HI VOLTAGE (115V)
HI VOLTAGE FIELD
JUNCTION
TERMINAL
INTERNAL TO
INTEGRATED CONTROL
PLUG CONNECTION
EQUIPMENT GND
FIELD GND
FIELD SPLICE
SWITCH (TEMPERATURE)
IGNITER
SWITCH (PRESSURE)
OVERCURRENT
PROT. DEVICE
MAXIMUM AIRFLOW OUTPUT
• 3 TON 60K BTUH = 1,400 CFM
• 3 TON 80K BTUH = 1,650 CFM
• 4 TON MODELS = 1,760 CFM
• 5 TON MODELS = 2,200 CFM
TO
115 VAC / 1
/ 60HZ
POWER SUPPLY WITH
OVER CURRENT
PROTECTION DEVICE
WARNING: DISCONNECT
POWER BEFORE
SERVICING. WIRING
TO UNIT MUST BE
PROPERLY POLARIZED
AND GROUNDED.
MENU NAVIGATION AND SELECTION INSTRUCTIONS
USING PHONE APPLICATION OVER BLUETOOTH NETWORK:
1) CONNECT TO THE FURNACE (INSTRUCTIONS PROVIDED BY PHONE
DURING THE CONNECTION PROCESS).
2) SELECT DESIRED SETTINGS MENU
3) SELECT ITEM THAT REQUIRES ADJUSTMENT AND MAKE NECESSARY
SELECTION
4) SUBMIT CHANGES
USING ON-BOARD PUSH BUTTONS:
1) USE THE RIGHT AND LEFT BUTTONS TO SCROLL BETWEEN MENUS
2) USE THE CENTER BUTTON TO SELECT DESIRED MENU WHEN MENU
CODE IS SHOWN ON 7-SEGMENT DISPLAYS
3) USE THE LEFT AND RIGHT BUTTONS TO SCROLL THROUGH OPTIONS
WITHIN THE DESIRED MENU (THE DISPLAY WILL FLASH WHILE
SCROLLING THROUGH OPTIONS FOR SELECTION)
4) USE THE CENTER BUTTON TO SELECT THE DISPLAYED OPTION
(WHEN SELECTED THE DISPLAY WILL STOP FLASHING)
5) USE THE CENTER BUTTON TO FINALIZE SELECTION AND RETURN
TO THE MAIN MENU
AIRFLOW SETTINGS INSTRUCTIONS
1) FOR NON-COMMUNICATING INSTALLATIONS, SELECT THE TYPE
OF UNIT INSTALLED IN THE ODS MENU
(1AC = SINGLE-STAGE AIR CONDITIONER,
1HP = SINGLE-STAGE HEAT PUMP, 2AC = 2 STAGE AIR CONDITIONER,
2HP = 2 STAGE HEAT PUMP) DEFAULT = OFF (NO OUTDOOR UNIT).
2) THE TONNAGE MENU MUST BE USED TO SELECT COOLING/HEAT
PUMP AIRFLOW (NON-COMMUNICATING INSTALLATION). TONNAGE
SELECTION OPTIONS AND CORRESPONDING AIRFLOW CFM CAN BE
FOUND TO THE RIGHT. [AIRFLOW = TONNAGE SELECTION X 400]
DEFAULT SELECTION IS 6.0 TONS.
3) [OPTIONAL] USE THE COOLING TRIM MENU (CTF) TO ADJUST THE
COOLING AIRFLOW FROM -10% TO +10% (2% INCREMENTS). THIS
APPLIES FOR 2 STAGE COMMUNICATING OUTDOOR UNITS AND
SINGLE OR 2 STAGE NON-COMMUNICATING OUTDOOR UNITS.
4) [OPTIONAL] USE THE HEATING TRIM MENU (HTF) TO ADJUST THE
HEAT PUMP AIRFLOW FROM -10% TO +10% (2% INCREMENTS).
THIS APPLIES FOR 2 STAGE COMMUNICATING OUTDOOR UNITS AND
SINGLE OR 2 STAGE NON-COMMUNICATING OUTDOOR UNITS.
5) [OPTIONAL] USE THE CONSTANT FAN MENU (FSD) TO SELECT THE
PERCENTAGE OF MAXIMUM AIRFLOW FOR CONTINUOUS FAN
6) [OPTIONAL] USE THE COOLING AIRFLOW PROFILE MENU (CAP) TO
SELECT BETWEEN 5 COOLING AIRFLOW PROFILES. PROFILE OPTIONS
1-4 ARE LISTED ABOVE (OPTION 5 IS ADJUSTABLE). SEE INSTALLATION
MANUAL FOR FURTHER DETAILS
HIGH FIRE
PRESSURE
SWITCH
2 CIRCUIT
CONNECTOR
NOTES:
1. MANUFACTURER'S SPECIFIED REPLACEMENT PARTS MUST BE
USED WHEN SERVICING
2. IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE
FURNACE MUST BE REPLACED,
AT LEAST 105%DG C. USE COPPER CONDUCTORS ONLY.
3. UNIT MUST BE PERMANENTLY GROUNDED AND CONFORM TO
N.E.C. AND LOCAL CODES.
4. WHEN THIS FURNACE IS PAIRED WITH NON R-32
REFRIGERANT SYSTEMS, DEFAULT SETTINGS
WILL NEED TO BE CHANGED. REFER TO INSTALLATION
MANUAL FOR FURTHER INSTRUCTIONS.
MANUAL RESET ROLLOUT LIMIT
CONTROLS (SINGLE CONTROL ON 40 kBTU)
AUTO RESET PRIMARY
LILIT CONTROL
INDUCTOR COIL
(ON SOME MODELS)
BLOWER
COMPARTMENT
DOOR SWITCH
(OPEN WHEN
DOOR OPEN)
BR
YL
OR
WH
GY
WIRE
COLOR:
WHITE
BLACK
YELLOW
BLUE
RED
ORANGE
BROWN
TAN
PINK
GRAY
GREEN
PURPLE
VIOLET
COLOR
DESIGNATION:
WH
BK
YL
BL
RD
OR
BR
TN
PK
GY
GR
PU
VT
PU
A2L SENSOR
CONNECTOR
A2L MODE IS ENABLED BY DEFAULT
REFER TO INSTALLATION MANUAL
FOR FURTHER INSTRUCTIONS.
5V
2
1
GND
background
53
Furnace
ELECTRICAL
Line Voltage (Measure L1 to N and N to Ground Voltage) L - N
N - G
Secondary Voltage (Measure Transformer Output Voltage) R - C
Blower Amps
BLOWER EXTERNAL STATIC PRESSURE
Return Air Sta�c Pressure IN. W.C.
Supply Air Sta�c Pressure IN. W.C.
Total External Sta�c Pressure (Ignoring +/- from the reading above, add total here) IN. W.C.
TEMPERATURES
Return Air Temperature (Dry bulb / Wet bulb) DB °F WB °F
DB °F WB °F
Hea�ng Supply Air Temperature DB °F
Temperature Rise DB °F
Delta T (Differenc
e between Supply and Return Temperatures) DB °F
GAS PRESSURES
Gas Inlet Pressure IN. W.C.
Gas Manifold Pressure (Low Fire) IN. W.C.
Gas Manifold Pressure (High Fire) IN. W.C.
Gas Type (NG) = Natural Gas / (LP) = Liquid Propane
Addi�onal Checks
Check wire rou�ngs for any rubbing
Check for kinked pressure switch tubing.
Check flue elbow for alignment and clamp �ghtness.
Check screw �ghtness on blower wheel.
Check factory wiring and wire c
onnec�ons.
Check product for proper clearances as noted by installa�on instruc�ons
°F to °C formula: (°F - 32) divided by 1.8 = °C °C to °F formula: (°C mul�plied by 1.8) + 32 = °F
Check R-32 sensor wire is connected properly (if applicable)
Model Number
Serial Number
Cooling Supply Air Temperature (Dry bulb / Wet bulb)
START-UP CHECKLIST
background
54
THIS PAGE INTENTIONALLY LEFT BLANK
background
55
THIS PAGE INTENTIONALLY LEFT BLANK
background
56
19001 Kermier Rd., Waller, TX 77484
www.goodmanmfg.com • www.amana-hac.com
© 2024 Daikin Comfort Technologies Manufacturing, L.P.
is a registered trademark of Maytag Corporation or its related companies and is used under license. All rights reserved.
NOTE: SPECIFICATIONS AND PERFORMANCE DATA LISTED HEREIN ARE SUBJECT TO CHANGE WITHOUT NOTICE.
Visit our web sites at www.goodmanmfg.com or www.amana-hac.com for information on:
• Products • Parts
• Warranties • Contractor Programs and Training
• Customer Services • Financing Options
CUSTOMER FEEDBACK
We are very interested in all product comments.
Please ll out the feedback form on one of the following links:
Goodman
®
Brand Products: (http://www.goodmanmfg.com/about/contact-us).
Amana
®
Brand Products: (http://www.amana-hac.com/about-us/contact-us).
You can also scan the QR code on the right for the product brand
you purchased to be directed to the feedback page.
GOODMAN
®
BRAND
AMANA
®
BRAND
GOODMAN
®
BRAND
AMANA
®
BRAND
PRODUCT REGISTRATION
Thank you for your recent purchase. Though not required to get the protection of
the standard warranty, registering your product is a relatively short process, and
entitles you to additional warranty protection, except that failure by California and
Quebec residents to register their product does not diminish their warranty rights.
The duration of warranty coverages in Texas and Florida di󰀨ers in some cases.
For Product Registration, please register as follows:
Goodman
®
Brand products: (https://www.goodmanmfg.com/product-registration).
Amana
®
Brand products: (http://www.amana-hac.com/product-registration).
You can also scan the QR code on the right for the product brand
you purchased to be directed to the Product Registration page.

Specifications

Indexed Terms: Gas Furnace, Variable-Speed

Goodman GRVT960803BN Questions and Answers

Questions and Answers

Related Products