Hybrid Inverter
User Manual
SUN-8K-SG04LP3-EU
SUN-6K-SG04LP3-EU
SUN-5K-SG04LP3-EU
SUN-10K-SG04LP3-EU
SUN-12K-SG04LP3-EU
25%
05/28/2019 15:34:40
8.30
KW
-2.00
KW
-3.00
KW
3.00
KW
0 12
0 8
0 8
0 8
ON

1. Safety Introductions
2. Product instructions
2.1 Product Overview
…………………………………………………
…………………………………………………
2.2 Product Size
01-02
02-05
Contents
……………………………………………………………
2.3 Product Features
2.4 Basic System Architecture
3. Installation
3.1 Parts list
3.3 Mounting instructions
3.4 Battery connection
3.6 PV Connection
3.5 Grid connection and backup load connection
06-29
3.7 CT Connection
3.8 Earth Connection(mandatory)
3.9 WIFI Connection
3.10 Wiring System for Inverter
3.12 Typical application diagram of diesel generator
3.11 Wiring diagram
3.13 phase parallel connection diagram
……………………………………………………………………
6. Mode 44-45
5.6 Battery Setup Menu
5.7 System Work Mode Setup Menu
5.8 Grid Setup Menu
5.9 Generator Port Use Setup Menu
5.10 Advanced Function Setup Menu
5.11 Device Info Setup Menu
……………………………………………………………
……………………………………………………
4. OPERATION
4.1 Power ON/OFF
4.2 Operation and Display Panel
5. LCD Display Icons
5.1 Main Screen
5.2 Solar Power Curve
30
31-44
5.4 System Setup Menu
5.5 Basic Setup Menu
5.3 Curve Page-Solar & Load & Grid
………………………………………………
………………………………………………………………
7. Limitation of Liability
8. Datasheet
45-48
49-50
……………………………………………………………
9. Appendix I 51-53
……………………………………………………………
10. Appendix II 54
……………………………………
11. EU Declaration of Conformity 54-55
3.7.1 Meter Connection
3.2 Product handling requirements

- 01 -
1. Safety Introduc�ons
About This Manual
The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and
maintenance. The manual cannot include complete informa�on about the photovoltaic (PV)
system.
How to Use This Manual
Read the manual and other related documents before performing any opera�on on the inverter.
Documents must be stored carefully and be available at all �mes.
Contents may be periodically updated or revised due to product development. The informa�on
in this manual is subject to change without no�ce. The latest manual can be acquired via
Labels descrip�on
Label
Description
Please read the instructions carefully before use.
CE mark of conformity
Symbol for the marking of electrical and electronics devices according to
Directive ����/��/EC. Indicates that the device, accessories and the
packaging must not be disposed as unsorted municipal waste and must be
collected separately at the end of the usage. Please follow Local Ordinances
or Regulations for disposal or contact an authorized representative of the
manufacturer for information concerning the decommissioning of
equipment.
Caution, risk of electric shock symbol indicates important safety
instructions, which if not correctly followed, could result in electric shock.
The DC input terminals of the inverter must not be grounded.
Surface high temperature, Please do not touch the inverter case.
The AC and DC circuits must be disconnected separately, and the
maintenance personnel must wait for � minutes before they are
completely powered off before they can start working.

- 02 -
· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual
for future reference.
· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and
corresponding sec�ons in the instruc�on manual.
· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional
service center.
· Improper reassembly may result in electric shock or fire.
· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or
cleaning. Turning off the unit will not reduce this risk.
· Cau�on: Only qualified personnel can install this device with ba�ery.
· Never charge a frozen ba�ery.
· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate
cable size. It is very important to correctly operate this inverter.
· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may
cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion.
· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals.
Please refer to "Installa�on" sec�on of this manual for the details.
· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring
system. Be sure to comply with local requirements and regula�on to install this inverter.
· Never cause AC output and DC input short circuited. Do not connect to the mains when DC
input short circuits.
2. Product Introduc�ons
This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery
charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display
offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar
charging, and acceptable input voltage based on different applica�ons.

2.1 Product Overview
1: Inverter indicators
2: LCD display
3: Func�on bu�ons
5: DC switch
4: Power on/off bu�on
6: Parallel port
* for some hardware versions, the circuit breaker of Grid is not existed
7: Meter-485 port
8: Ba�ery input connectors
9: Func�on port
10: Modbus port
11: BMS port
12: PV input with two MPPT
13: *Circuit breaker of Grid
15: Generator input
14: Load
16: WiFi Interface
17: DRM port
- 03 -
12
1
2
3
4
5
8
9
17
13
14
15
16
7
6
10
11

- 04 -
2.2 Product Size
Inverter Size
254.0 mm
279.0 mm
279.0 mm
450.9 mm
422.0 mm
658.0 mm
240.00 mm
120.00 mm
422.0 mm
363.00 mm

- 05 -
2.3 Product Features
- 230V/400V Three phase Pure sine wave inverter.
- Self-consump�on and feed-in to the grid.
- Auto restart while AC is recovering.
- Programmable supply priority for ba�ery or grid.
- Programmable mul�ple opera�on modes: On grid, off grid and UPS.
- Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
- Configurable AC/Solar/Generator Charger priority by LCD se�ng.
- Compa�ble with mains voltage or generator power.
- Overload/over temperature/short circuit protec�on.
- Smart ba�ery charger design for op�mized ba�ery performance
- With limit func�on, prevent excess power overflow to the grid.
- Suppor�ng WIFI monitoring and build-in 2 strings for 1 MPP tracker, 1 string for 1 MPP tracker.
- Smart se�able three stages MPPT charging for op�mized ba�ery performance.
- Time of use func�on.
- Smart Load Func�on.
2.4 Basic System Architecture
The following illustra�on shows basic applica�on of this inverter.
It also includes following devices to have a Complete running system.
- Generator or U�lity
- PV modules
Consult with your system integrator for other possible system architectures depending on your
requirements.
This inverter can power all kinds of appliances in home or office environment, including motor
type appliances such as refrigerator and air condi�oner.
GridBackup Load
WiFI
GPRS
phoneCloud services
On-Grid Home Load
Generator
ATS
Grid-connected InverterSmart Load
Battery
Solar
CT
AC cable DC cable

- 06 -
3. Installa�on
3.1 Parts List
Check the equipment before installa�on. Please make sure nothing is damaged in the package.
You should have received the items in the following package:
Hybrid inverter
x1
Stainless steel an�-collision
bolt M8×80
x4
Parallel communica�on
cable x1
L-type Hexagon wrench
x1
User
manual
User manual x1
Ba�ery temperature
sensor x1
Wall moun�ng bracket x1
Meter(op�onal)
x1
Three-Phase Smart Meter
SET ESC
Sensor Clamp
x3
Solar Photovoltaic
Connector Special
Spanner x1
DC+/DC- Plug connectors
including metal terminal
xN
Datalogger (op�onal) x1
1
Magne�c ring for ba�ery
x1
2
Magne�c ring for BMS
and Meter communica�on
cable
x2
3
Magne�c ring for
external temperature
sensor x1
4
Magne�c ring x3
5
Magne�c ring for AC
wires
x2
Packing box of magne�c ring
*1: 80x50x20 mm
2: 33x23x15 mm
3: 25.9x28x13 mm
4: 31x29x19 mm
5: 55.5x33x23 mm

- 07 -
3.3 Moun�ng instruc�ons
Installa�on Precau�on
This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site
meets below condi�ons:
· Not in direct sunlight
· Not in areas where highly flammable materials are stored.
· Not in poten�al explosive areas.
· Not in the cool air directly.
· Not near the television Antenna or antenna cable.
· Not higher than al�tude of about 2000 meters above sea level.
· Not in environment of precipita�on or humidity(>95%)
3.2 Product handling requirements
CAUTION:
Improper handling may cause personal injury!
• Arrange an appropriate number of personnel to carry the inverter according to
its weight, and installa�on personnel should wear protec�ve equipment such
as an�-impact shoes and gloves.
• Placing the inverter directly on a hard ground may cause damage to its metal
enclosure. Protec�ve materials such as sponge pad or foam cushion should be
placed underneath the inverter.
• Move the inverter by one or two people or by using a proper transport tool.
• Move the inverter by holding the handles on it. Do not move the inverter by
holding the terminals.
Li� the inverter out of the packing box and transport it to designated installa�on loca�on.
transport

- 08 -
Please AVOID direct sunlight, rain exposure, snow laying up during installa�on and
opera�on. Before connec�ng all wires, please take off the metal cover by removing
screws as shown below:
Installa�ons Tools
Installa�on tools can refer to the following recommended ones. Also, use other auxiliary tools
on site.
Protective goggles EarplugsAnti-dust mask Work gloves Utlity Knife Slotted screwdriver
Cross screwdriver
Work shoes
Percussion drill
Anti-static wrist strap
Wire cutter
Wire stripper
Hydraulic pliers
Heat gun
Crimping tool�-�mm²
Solar connector
wrench
Pliers
Marker
Level
Rubber hammer socket wrenches set
Multimeter ≥���� Vdc
RJ�� crimping plier
Cleaner

Considering the following points before selec�ng where to install:
· Please select a ver�cal wall with load-bearing capacity for installa�on, suitable for installa�on
on concrete or other non-flammable surfaces,installa�on is shown below.
· Install this inverter at eye level in order to allow the LCD display to be read at all �mes.
· The ambient temperature is recommeded to be between -40~60℃ to ensure op�mal opera�on.
· Be sure to keep other objects and surfaces as shown in the diagram to guarantee sufficient
heat dissipa�on and have enough space for removing wires.
For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and
approx. 50cm above and below the unit. And 100cm to the front.
Moun�ng the inverter
Remember that this inverter is heavy! Please be careful when li�ing out from the package.
Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall,
82-90mm deep.
1. Use a proper hammer to fit the expansion bolt into the holes.
2. Carry the inverter and holding it, make sure the hanger aim at the expansion bolt,fix the
inverter on the wall.
3. Fasten the screw head of the expansion bolt to finish the moun�ng.
- 09 -
≥500mm
≥500mm

Inverter hanging plate installa�on
- 10 -
3.4 Ba�ery connec�on
For safe opera�on and compliance, a separate DC over-current protector or disconnect device is
required between the ba�ery and the inverter. In some applica�ons, switching devices may not
be required but over-current protectors are s�ll required. Refer to the typical amperage in the
table below for the required fuse or circuit breaker size.
Chart 3-2 Cable size
Model
5/6/8/10/12kW
Wire Size
1AWG
Cable(mm )
2
35
Torque value(max)
24.5Nm

- 11 -
Please follow below steps to implement ba�ery connec�on:
1. Please choose a suitable ba�ery cable with correct connector which can well fit into the
ba�ery terminals.
2. Use a suitable screwdriver to unscrew the bolts and fit the ba�ery connectors in, then
fasten the bolt by the screwdriver, make sure the bolts are �ghtened with torque of
24.5 N.M in clockwise direc�on.
3. Make sure polarity at both the ba�ery and inverter is correctly connected.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
All wiring must be performed by a professional person.
4. In case of children touch or insects go into the inverter, Please make sure the inverter
connector is fasten to waterproof posi�on by twist it clockwise.
Before making the final DC connec�on or closing DC breaker/disconnect, be sure
posi�ve(+) must be connect to posi�ve(+) and nega�ve(-) must be connected to
nega�ve(-). Reverse polarity connec�on on ba�ery will damage the inverter.
Installa�on must be performed with care.
For 5-12kW model, ba�ery
connector screw size: M10
29.54mm
15.3/16mm
10.5mm
DC Ba�ery Input
30mm
30mm
Pass the BMS communica�on cable
through the magne�c ring and wrap
it around the magne�c ring four �mes.
1
2
2
Pass the ba�ery power cable
through the magne�c ring and
wrap it around the magne�c
ring two �mes.
1

- 12 -
Batt Temp
Sensor
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CN1:
TEMP (1,2): ba�ery temperature sensor for lead
acid ba�ery.
CT-L1 (3,4): current transformer (CT1) for“zero export to CT”mode clamps on L1 when in
three phase system.
CT-L2 (5,6): current transformer (CT2) for“zero export to CT”mode clamps on L2 when in
three phase system.
CT-L3 (7,8): current transformer (CT3) for“zero export to CT”mode clamps on L3 when in
three phase system.
CN2:
G-start (1,2): dry contact signal for startup the diesel generator.
When the "GEN signal" is ac�ve, the open contact (GS) will switch on (no voltage output).
G-valve (3,4): Dry contact output. When the inverter
is in off-grid mode and the “signal island mode" is
checked, the dry contact will switch on.
Grid_Ry (5,6): reserved.
RSD (7,8): When ba�ery is connected and the
inverter is in "ON" status, it will provide 12Vdc.
RSD_input (B,B,+,-): when the terminal “B” & “B” is
short-circuited with addi�onal wire connec�on, or
there’s 12Vdc input at the terminal “+ & - “, then the
12Vdc of RSD+ & RSD- will disappear immediately, and
the inverter will shutdown immediately.
Parallel A: Parallel communica�on
port 1 (CAN interface).
Parallel B: Parallel communica�on
port 2 (CAN interface).
Meter_485: for energy meter
communica�on.
Modbus: Reserved.
BMS: BMS port for ba�ery
communica�on(CAN/RS485).
DRM: It is used to accept the
external input signal(Digital input).
More details please refer to the P53.
CT -L1
CT -L2
CT -L3
Gen start-up
N/O Relay
Parallel_A
CN1: TEMP: 1,2
CT_1: 3,4
CT_2: 5,6
CT_3: 7,8
Parallel_B Meter-485
Modbus BMS
GS (diesel generator startup signal)
relay
coil
open
contact
G S
DRM
3.4.1 Func�on port defini�on
CN2: G_start: 1,2
G_valve: 3,4
Grid_Ry: 5,6
RSD: 7+, 8-
CN1
CN2
Inverter

- 13 -
3
4
4
4
Wrap the wires three laps around the magne�c ring, then
thread the end of wires through the magne�c ring.
Wrap the wires three laps around the magne�c ring, then
thread the end of wires through the magne�c ring.
Wrap the wires three laps around the magne�c ring, then
thread the end of wires through the magne�c ring.
Wrap the wires three laps around the magne�c ring, then
thread the end of wires through the magne�c ring.
TEMP (1,2)
Func�on Port Installa�on Instruc�onsNo.
CT_1 (3,4)
CT_2 (5,6)
CT_3 (7,8)
G_start (1,2)
G_valve (3,4)
Grid_Ry (5,6)
RSD (7,8)
RSD_input (B,B,+,-)
3
4
4
4

- 14 -
3.4.2 Temperature sensor connec�on for lead-acid ba�ery
Temp. CT
1
Inverter
2

- 15 -
3.5 Grid connec�on and backup load connec�on
1. Before making Grid, load and Gen port connec�on, be sure to turn off AC breaker or
disconnector first.
2. Remove insula�on sleeve 10mm length, unscrew the bolts. For GRID port, just insert the wires
into the terminals according to polari�es indicated on the terminal block. For GEN and Load
ports, thread the wires through the magne�c ring firstly, then insert these wires into the
terminals according to polari�es indicated on the terminal block. Tighten the terminal screws
and make sure the wires are completely and safely connected.
Please follow below steps to implement Grid, load and Gen port connec�on:
· Before connec�ng to the grid, a separate AC breaker must be installed between the inverter
and the grid, and also between the backup load and the inverter. This will ensure the inverter
can be securely disconnected during maintenance and fully protected from over current. The
recommended of AC breaker for the load port is 63A for 8kW, 63A for 10kW and 63A for 12kW.
The recommended of AC breaker for the grid port is 63A for 8kW, 63A for 10kW and 63A for 12kW.
All wiring must be performed by a qualified personnel.It is very important for
system safety and efficient opera�on to use appropriate cable for AC input
connec�on. To reduce risk of injury, please use the proper recommended cable
as below.
· There are three terminal blocks with "Grid" "Load"and "GEN" markings. Please do not misconnect
input and output connectors.
Chart 3-3 Recommended Size for AC wires
Grid connec�on and backup load connec�on (Copper wires) (bypass)
Grid connec�on and backup load connec�on (Copper wires)
Model
5/6kW
Wire Size
12AWG
Cable(mm )
2
2.5
Torque value(max)
1.2Nm
8kW 10AWG 4.0 1.2Nm
10/12kW 8AWG 6.0 1.2Nm
Model
5/6/8/10/12kW
Wire Size
6AWG
Cable(mm )
2
10
Torque value(max)
1.2Nm
Note:
In final installa�on, breaker cer�fied according to IEC 60947-1 and IEC 60947-2
shall be installed with the equipment.

- 16 -
GRID LOAD GEN PORT
GRID
T(L3)
S(L2)
R(L1)
N
N
R
S
T
T(L3)
PE
S(L2)
R(L1)
N
T(L3)
PE
S(L2)
R(L1)
N
GEN PORT
LOAD
Wrap the wires of Load port one laps
around the magne�c ring, then thread the
end of wires through the magne�c ring.
LOAD GEN
Wrap the wires of GEN port one laps
around the magne�c ring, then thread the
end of wires through the magne�c ring.
5 5
5 5

- 17 -
3.6 PV Connec�on
3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten
terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
4. Make sure the wires are securely connected.
5. Appliances such as air condi�oner are required at least 2-3 minutes to restart because it is
required to have enough �me to balance refrigerant gas inside of circuit. If a power shortage
occurs and recovers in short �me, it will cause damage to your connected appliances. To
prevent this kind of damage, please check manufacturer of air condi�oner if it is equipped with
�me-delay func�on before installa�on. Otherwise, this inverter will trigger overload fault and
cut off output to protect your appliance but some�mes it s�ll causes internal damage to the air
condi�oner
Before connec�ng to PV modules, please install a separately DC circuit breaker between
inverter and PV modules. It is very important for system safety and efficient opera�on to
use appropriate cable for PV module connec�on. To reduce risk of injury, please use the
proper recommended cable size as below.
Chart 3-4 Cable size
Be sure that AC power source is disconnected before a�emp�ng to wire it to the
unit.
To avoid any malfunc�on, do not connect any PV modules with possible current
leakage to the inverter. For example, grounded PV modules will cause current
leakage to the inverter. When using PV modules, please ensure the PV+ & PV-
of solar panel is not connected to the system ground bar.
It is requested to use PV junc�on box with surge protec�on. Otherwise, it will
cause damage on inverter when lightning occurs on PV modules.
Model Wire Size
12AWG
Cable(mm )
2
2.5
5/6/8/10/12kW

3.6.1 PV Module Selec�on:
3.6.2 PV Module Wire Connec�on:
When selec�ng proper PV modules, please be sure to consider below parameters:
1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of
inverter.
2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according
to lEC 61730.
Chart 3-5
- 18 -
1. Switch the Grid Supply Main Switch(AC)OFF.
2. Switch the DC lsolator OFF.
3. Assemble PV input connector to the inverter.
Safety Hint:
When using PV modules, please ensure the PV+ & PV- of solar panel is not
connected to the system ground bar.
Safety Hint:
Before connec�ng inverter, please make sure the PV array open circuit voltage is
within the 800V of the inverter.
Safety Hint:
Before connec�on, please make sure the polarity of the output voltage of PV
array matches the “DC+” and “DC-” symbols.
PV Input Voltage
Inverter Model
PV Array MPPT Voltage Range
No. of MPP Trackers
No. of Strings per MPP Tracker
550V (160V-800V)
200V-650V
2
10kW
2+1
8kW
1+1
5kW
1+1
6kW
1+1
12kW
2+1
Pic 3.1 DC+ male connector
Pic 3.2 DC- female connector

- 19 -
Safety Hint:
Please use approved DC cable for PV system.
Cable type
Range Recommended value
Cross secon(mm )
Industry generic PV cable
(model: PV1-F)
2.5-4.0
(12-10AWG)
2.5(12AWG)
Chart 3-6
The steps to assemble the DC connectors are listed as follows:
a)Strip off the DC wire about 7mm, disassemble the connector cap nut (see picture 3.3).
b) Crimping metal terminals with crimping pliers as shown in picture 3.4.
Pic 3.4 Crimp the contact pin to the wire
Pic 3.3 Disassemble the connector cap nut
�mm
�mm
Crimping plier

- 20 -
Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connec�ng the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening condi�ons.
Warning:
Please use its own DC power connector from the inverter accessories. Do not
interconnect the connectors of different manufacturers.Max. DC input current
should be 20A. if exceeds, it may damage the inverter and it is not covered by
Deye warranty.
c) Insert the contact pin to the top part of the connector and screw up the cap nut to the top
part of the connector. (as shown in picture 3.5).
Pic 3.5 connector with cap nut screwed on
d) Finally insert the DC connector into the posi�ve and nega�ve input of the inverter, shown as
picture 3.6.
Pic 3.6 DC input connec�on

3.7 CT Connec�on
- 21 -
White wire
543 6 7 8
Black wire
Grid
N
R
S
T
CT1
CT2
CT3
GRID
N
R
S
T
CT
Arrow pointing
to
inverter
*Note:when the reading of the load power on the LCD is not correct, please
reverse the CT arrow.
Inverter
Ground

- 22 -
3.7.1 Meter Connec�on
GRID
N
R
S
T
GRID
N
R
S
T
R
S
T
N
PE
Parallel_A Parallel_B
Meter-485 port
RS485A
RS485B
Three-Phase Smart Meter
SET ESC
1 74 10
2524
3
96 10
CHINT meter
Three-Phase Smart Meter
SET ESC
1 74 10
2524
3 96 10
RS 485
CHNT DTSU666
(3,6,9,10)
(1,4,7,10)
R
S
T
Grid
Inverter
R
R
S
S
T
T
N
N
Parallel_A Parallel_B
Meter-485 port
RS485A
RS485B
Grid
Eastron meterEastron SDM630-Modbus V2
RS 485
RS 485 B RS 485 A
B A G
(5,6,7,8)
(1,2,3,4)
1234
R
S
T
5678
GND
Eastron
5 6 7 8
R
S
T
Eastron
5 6 7 8
Inverter
PE
GND
Ground
Ground

- 23 -
Pass the Meter communica�on cable
through the magne�c ring and wrap
it around the magne�c ring four �mes.
2
2
Note:
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.

- 24 -
3.9 WIFI Connec�on
For the configura�on of Wi-Fi Plug, please refer to illustra�ons of the Wi-Fi Plug. The Wi-Fi Plug
is not a standard configura�on, it's op�onal.
3.8 Earth Connec�on(mandatory)
Ground cable shall be connected to ground plate on grid side, this prevents electric shock if the
original protec�ve conductor fails.
Earth connec�on (Copper wires) (bypass)
Earth connec�on (Copper wires)
Model
5/6/8/10/12kW
Wire Size
6AWG
Cable(mm )
2
10
Torque value(max)
1.2Nm
Warning:
Inverter has built-in leakage current detec�on circuit, The type A RCD can be
connected to the inverter for protec�on according to the local laws and regula�ons.
If an external leakage current protec�on device is connected, its opera�ng current
must be equal to 300 mA or higher, otherwise inverter may not work properly.
Model
5/6kW
Wire Size
12AWG
Cable(mm )
2
2.5
Torque value(max)
1.2Nm
8kW 10AWG 4.0 1.2Nm
10/12kW 8AWG 6.0 1.2Nm

- 25 -
3.10 Wiring System for Inverter
E-BAR
GEN
PORT
Load
CT
PE
AC Breaker
R R
N N
S
Load
PE or
S
T
T
AC Breaker AC Breaker
R
R
R
N
N
N
S
S
Grid
S
T
PE
PE
T
R
N
S
PE
T
T
AC Breaker
Hybrid Inverter
CT1
CT2
CT3
RCD
Home Loads
RCD
E-BAR
N-BAR
E-N
Link
Grid
Battery
BMS
DC Breaker
PV
DC Breaker
This diagram is an example for an applica�on that neutral connects with the
PE in a distribu�on box.
For countries such as Australia, New Zealand, etc., please follow
local wiring regula�ons!
Inverter case grounding

- 26 -
3.11 Wiring diagram
GEN
PORT
L1
N
L2
PE
L3
AC Breaker
Battery
BMS
DC Breaker
PV
DC Breaker
This diagram is an example for an applica�on in which neutral is separated
from the PE in the distribu�on box.
For countries such as China, Germany,the Czech Republic, Italy, etc., please
follow local wiring regua�ons!
Note:Backup func�on is op�onal in German market.please leave backup side
empty if backup func�on is not available in the inverter.
E-BAR
Backup
Loads
CT
PE
L2 L2
L1 L1
L3
Backup
PE or
L3
N
PE
N
L2
L2
L2
L1
L1
L1
L3
L3
On-Grid
L3
N
PE
N
N
Hybrid Inverter
CT1
CT2
CT3
RCD
RCD
Home Loads
RCD
E-BAR
Grid
Distribution box
Grouding screw hole in the
lower right corner
300mA RCD
(Recommended)

- 27 -
L wireCAN N wire PE wire
BMS
Grid
CT1 CT2
CT3
Backup Load
Ground
Inverter
①DC
Breaker
②AC Breaker
③AC Breaker
④AC Breaker
Battery pack
Home Load
R
R
S
S
T
T
N
N
PE
PE
R
S
T
N
PE
① DC Breaker for battery
SUN 5K-SG-EU: 150A DC breaker
SUN 6K-SG-EU: 200A DC breaker
SUN 8K-SG-EU: 250A DC breaker
SUN 10K-SG-EU: 300A DC breaker
SUN 12K-SG-EU: 300A DC breaker
② AC Breaker for backup load
SUN 5K-SG-EU: 63A AC breaker
SUN 6K-SG-EU: 63A AC breaker
SUN 8K-SG-EU: 63A AC breaker
SUN 10K-SG-EU: 63A AC breaker
SUN 12K-SG-EU: 63A AC breaker
③ AC Breaker for grid
SUN 5K-SG-EU: 63A AC breaker
SUN 6K-SG-EU: 63A AC breaker
SUN 8K-SG-EU: 63A AC breaker
SUN 10K-SG-EU: 63A AC breaker
SUN 12K-SG-EU: 63A AC breaker
④AC Breaker for home load
Depends on household loads

- 28 -
3.12 Typical applica�on diagram of diesel generator
L wireCAN N wire PE wire
BMS
Ground
①DC
Breaker
Battery pack
Backup Load
T
S
R
N
PE
Generator
1 2
GS (diesel generator startup signal)
relay
coil
open
contact
G S
G-start (1,2): dry contact signal for startup
the diesel generator.
Remotely control signal line
SUN 10K-SG-EU: 300A DC breaker
SUN 12K-SG-EU: 300A DC breaker
SUN 5K-SG-EU: 150A DC breaker
SUN 6K-SG-EU: 200A DC breaker
SUN 8K-SG-EU: 250A DC breaker
① DC Breaker for battery
SUN 10K-SG-EU: 63A AC breaker
SUN 8K-SG-EU: 63A AC breaker
SUN 6K-SG-EU: 63A AC breaker
SUN 5K-SG-EU: 63A AC breaker
SUN 12K-SG-EU: 63A AC breaker
② AC Breaker for backup load
SUN 5K-SG-EU: 63A AC breaker
SUN 10K-SG-EU: 63A AC breaker
SUN 12K-SG-EU: 63A AC breaker
SUN 8K-SG-EU: 63A AC breaker
SUN 6K-SG-EU: 63A AC breaker
③ AC Breaker for Generator port
Inverter
③AC Breaker
②AC
Breaker
T
S
R
N
PE
CN2:

- 29 -
L wireCAN N wire PE wire
3.13 Three phase parallel connec�on diagram
Inverter
Parallel
Master
Slave
Modbus SN
Advanced Function
Paral.
Set3
Parallel
Master
Slave
Modbus SN
02
Advanced Function
Paral.
Set3
EX_Meter For CT Meter Select
0/3
No Meter
Parallel
Master
Slave
Modbus SN
03
Advanced Function
Paral.
Set3
EX_Meter For CT Meter Select
0/3
No Meter
Master inverter Slave Inverter Slave Inverter
EX_Meter For CT Meter Select
0/3
No Meter
01
Parallel_A Parallel_B Meter-485
Grid
CT1 CT2
CT3
Backup Load
Inverter
No.3
(slave)
Inverter
No.2
(slave)
Inverter
No.1
(master)
Ground
①
④
⑥
⑦
⑧
⑨
⑩
⑤
②
③
Battery pack
Home Load
R S TNPE
R
S
T
N
PE
CT
Arrow pointing
to
inverter
①②③ DC Breaker for battery
SUN 5K-SG-EU: 150A DC breaker
SUN 6K-SG-EU: 200A DC breaker
SUN 8K-SG-EU: 250A DC breaker
SUN 10K-SG-EU:300A DC breaker
SUN 12K-SG-EU:300A DC breaker
④⑥⑧ AC Breaker for grid port
SUN 5K-SG-EU: 63A AC breaker
SUN 6K-SG-EU: 63A AC breaker
SUN 8K-SG-EU: 63A AC breaker
SUN 10K-SG-EU:63A AC breaker
SUN 12K-SG-EU:63A AC breaker
⑤⑦⑨ AC Breaker for backup load
SUN 5K-SG-EU: 63A AC breaker
SUN 6K-SG-EU: 63A AC breaker
SUN 8K-SG-EU: 63A AC breaker
SUN 10K-SG-EU: 63A AC breaker
SUN 12K-SG-EU: 63A AC breaker
⑩ AC Breaker for home load
Depends on household loads
Ground
Ground
Max. 10pcs parallel for on-grid and off-grid opera�on.
Note: For the parallel system, please choose the "Zero export to CT " mode.

4. OPERATION
4.1 Power ON/OFF
Once the unit has been properly installed and the ba�eries are connected well, simply press
On/Off bu�on(located on the le� side of the case) to turn on the unit. When system without
ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD
will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and
select NO ba�ery,system can s�ll working.
4.2 Opera�on and Display Panel
The opera�on and display panel, shown in below chart, is on the front panel of the inverter.
It includes four indicators, four func�on keys and a LCD display, indica�ng the opera�ng status
and input/output power informa�on.
Chart 4-1 LED indicators
LED Indicator
DC
AC
Normal
Alarm
Green led solid light
Green led solid light
Green led solid light
Red led solid light
PV Connec�on normal
Grid Connec�on normal
Inverter opera�ng normal
Malfunc�on or warning
Messages
Chart 4-2 Func�on Bu�ons
Funcon Key
Esc
Up
Down
Enter
Descripon
To exit se�ng mode
To go to previous selec�on
To go to next selec�on
To confirm the selec�on
- 30 -

5.1 Main Screen
5. LCD Display Icons
The LCD is touchscreen, below screen shows the overall informa�on of the inverter.
1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it
turns into "comm./F01~F64" , it means the inverter has communica�on errors or other errors,
the error message will display under this icon(F01-F64 errors, detail error info can be viewed in
the System Alarms menu).
2.At the top of the screen is the �me.
3.System Setup Icon, Press this set bu�on,you can enter into the system setup screen which
including Basic Setup, Ba�ery Setup, Grid Setup, System Work Mode, Generator port use,
Advanced func�on and Li-Ba� info.
4.The main screen showing the info including Solar, Grid, Load and Ba�ery. Its also displaying the
energy flow direc�on by arrow. When the power is approximate to high level, the color on the
panels will changing from green to red so system info showing vividly on the main screen.
· PV power and Load power always keep posi�ve.
· Grid power nega�ve means sell to grid, posi�ve means get from grid.
· Ba�ery power nega�ve means charge, posi�ve means discharge.
25%
05/28/2019 15:34:40
8.30
KW
-2.00
KW
-3.00
KW
3.00
KW
0 12
0 8
0 8
0 8
ON
- 31 -

5.1.1 LCD opera�on flow chart
Main Screen
Solar Page Solar Graph
Grid Graph
BMS Page
Load Graph
Battery Setting
System Work Mode
Grid Setting
Gen Port Use
Basic Setting
Advanced Function
Device info
Grid Page
Inverter Page
Battery Page
Load Page
System Setup
- 32 -

5.2 Solar Power Curve
- 33 -
0W
Stand by
0.0Hz
Energy
CT2: 0W LD2:0W
CT1: 0W LD1:0W
BUY
Today=0.0KWH
Total =8.60 KWH
Today=2.2KWH
Total =11.60 KWH
SELL
CT3: 0W LD3:0W
L1: 0V L2: 0V L3: 0V
Grid
①
②
Power: 1560W
Energy
PV1-V: 286V PV2-V: 45V
Today=8.0 KWH
Total =12.00 KWH
PV1-I: 5.5A PV2-I: 0.0A
PV1-P: 1559W PV2-P: 1W
Solar
This is Solar Panel detail page.
Press the “Energy “bu�on will enter into the power
curve page.
③
①
②
③
Solar Panel Genera�on.
Voltage, Current, Power for each MPPT.
Solar Panel energy for Day and Total.
③
Power: 55W
1166w
221v 0w
229v 1166w
225v 0w
SOC:99%
-21w
BAT_V:53.65V
DC_P1: 0W
DC_V1: 0V
DC_I1: 0.0A
DC_P2: 0W
DC_V2: 0V
DC_I2: 0.0A
BAT_I: -0.41A
BAT_T: 27.0C
1244w
50Hz
Load
Battery PV1 PV2
Grid Inverter
Today=0.5 KWH
Total =1.60 KWH
L1: 220V P1: 19W
L2: 220V P2: 18W
L3: 220V P3: 18W
Load
Energy
①
①
②
③
This is Grid detail page.
Press the “Energy “ bu�on will enter into the power
curve page.
①
②
③
Status, Power, Frequency.
BUY: Energy from Grid to Inverter,
L: Voltage for each Phase
CT: Power detected by the external current
sensors
LD: Power detected using internal sensors on
AC grid in/out breaker
SELL: Energy from Inverter to grid.
①
②
This is Inverter detail page.
① Inverter Genera�on.
Voltage, Current, Power for each Phase.
AC-T: mean Heat-sink temperature.
222v 0.8w
229v 5.0w
229v 0.9w
HM: LD:
-10W 28W
5W 1192W
0W 24W
-81w
50Hz
222v 0.1A
230v 0.1A
223v 0.1A
INV_P:
-30W
-26W AC_T:
-25W 38.8C
This is Load detail page.
When you check “Selling First” or “Zero export to
Load” on system work mode page, the informa�on
on this page is about backup load which connect on
Load port of hybrid inverter.
When you check “Zero export to CT”on system work
mode page, the informa�on on this page is including
backup load and home load.
Press the “Energy “ bu�on will enter into the power
curve page.
①
②
③
Load Power.
Voltage, Power for each Phase.
Daily and total Load consump�on .

Mean Voltage:50.34V Charging Voltage :53.2V
Total Current:55.00A Discharging Voltage :47.0V
Mean Temp :23.5C Charging current :50A
Total SOC :38% Discharging current :25A
Sum
Data
Details
Data
Dump Energy:57Ah
Request Force Charge
Li-BMS
Request Force Charge: It indicates the
BMS requests hybrid inverter to charge
the ba�ery ac�vely.
- 34 -
Discharge
U:49.58V
I:2.04A
Power: 101W
Temp:25.0C
Batt
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more
accuracy power genera�on, pls check on the monitoring system. Click the up and down arrow to
check power curve of different period.
5.3 Curve Page-Solar & Load & Grid
This is Ba�ery detail page.
if you use Lithium Ba�ery, you can enter BMS page.
2019-5-28
20%
1 3 5 7 9 11 13 15 17 19 21 23
40%
60%
80%
100%
3000W
Solar Power Production:Day
5-2019
400
0
05 10 15 20 25 30
800
1200
1600
2000
2000Wh
System Solar Power:Month
CANCEL Day Month Year Total
2019
40
1 2 3 4 5 6 7 8 9 10 11 12
80
120
160
200
KWh
System Solar Power:Year
CANCEL Day Month Year Total
TOTAL
400
0
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
800
1200
1600
2000
2000KWh
CANCEL Day Month Year Total
System Grid Power:Total
CANCEL Day Month Year Total
Volt
1
2
3
50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
50.33V 19.10A 31.0C 51.0% 25.5Ah 53.2V 25.0A 0|0|0
50.30V 16.90A 30.2C 12.0% 6.0Ah 53.2V 25.0A 0|0|0
4
5
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6
7
8
9
10
11
12
13
14
15
Curr
Volt Curr
Temp SOC Energy
Charge
Fault
Sum
Data
Details
Data
Li-BMS
Li-BMS

- 35 -
5.4 System Setup Menu
5.5 Basic Setup Menu
System Work Mode
Battery
Setting
Grid Setting
Gen Port
Use
Basic
Setting
System Setup
Device Info.
Advanced
Function
Basic
Set
Time Syncs Beep Auto Dim
24-Hour
Basic Setting
Year Month Day
Hour Minute
Lock out all changesFactory Reset
2019 03
09 15
17
This is System Setup page.
Factory Reset Password: 9999
PassWord
DELX--X--X--X
1 2 3
4 5 6
7 8 9
CANCEL 0 OK
Lock out all changes Password: 7777
Time Syncs: synchronize cloud pla�orm �me. Enable the
inverter to automa�cally
Beep: Used to turn on or off the beep sound in inverter's
alarm status.
Auto Dim: Used to automa�cally adjust the brightness of
the LCD display screen.
Factory Reset: Reset all parameters of the inverter.
Lock out all changes: Lock programmable parameters to
prevent them from being changed.
When we select the "factory reset" or“Lock out all
changes”, the system will require us to enter a
password first to confirm the opera�on.

- 36 -
5.6 Ba�ery Setup Menu
Batt Mode
Lithium
Use Batt V
Battery Setting
Activate Battery
Gen Force
Max A Charge
Batt Capacity
Max A Discharge 40A
40A
400Ah
Batt
Mode
Use Batt %
No Batt
Ba�ery capacity: When you check" Use Ba� %" mode,
you need to type in the total capacity of your ba�ery
bank to align the ba�ery SOC.
Use Ba� V: Use ba�ery voltage for se�ng all ba�ery
remaining capacity related parameters.
Use Ba� %: Use ba�ery enegry percentage for se�ng
all ba�ery remaining capac�y related parameters.
Max. A charge/discharge: Max ba�ery charge/discharge
current(0-120A for 5kW model, 0-150A for 6kW model,
0-190A for 8kW model, 0-210A for 10kW model,0-240A
for 12kW model).
For AGM and Flooded, we recommend Ah ba�ery
size x 20%= Charge/Discharge amps.
. For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected
to the system.
Ac�ve ba�ery: This feature will help recover a
ba�ery that is over discharged by slowly charging
from the solar array or grid.
Gen Force: When the generator is connected, it is forced
to start the generator without mee�ng other condi�ons.
This is Ba�ery Setup page.
Start =30%: When ba�ery SOC or voltage drop to this
set value, inverter will start the generator automa�cally
via ac�ving the "Gen Signal" to charge the ba�ery.
A = 40A: The upper limit of charging current for
charging ba�eries with power from generator connected
to GEN port.
Gen Charge: Allow the use of power input from the GEN
port to charge the ba�ery.
Gen Signal: The normally open relay will close when the
ba�ery SOC or voltage drop to the set value of "Start".
①③
07/08/2021 11:11:10 Thu
76%
2.00
KW
-1.39
KW
0.00
KW
KW
0 7
0 5
0 5
0 5
ON
Signal
on
2.00
When the "GEN signal" is ac�ve, the generator
icon will appear on the main screen of inverter
LCD display.
Grid ChargeGen Charge
Grid SignalGen Signal
Gen Max Run Time 24.0 hours
Gen Down Time 0.0 hours
Battery Setting
Start
A
30% 30%
40A
40A
Batt
Set2
①
②
③
Gen Max Run Time: It indicates the longest �me Generator can run in one day, when �me is up, the
Generator will be turned off. 24H means that it does not shut down all the �me.
Gen Down Time: It indicates the rest �me of the generator before the inverter start it again.
③
Start =30%: When ba�ery SOC or voltage drop to this set value, inverter will start the generator connected
to the grid port automa�cally via ac�ving the "Grid Signal" to charge the ba�ery.
A = 40A: The upper limit of charging current for charging ba�eries with power from grid port.
Grid Charge: It's allowed to use power fed from the grid port, which includes grid or generator connected
to the grid port, to charge the ba�ery.
Grid Signal: When a generator is connected to the grid port of hybrid inverter, this 'Grid signal' can be used
to control the dry contact to start or stop the generator.
This is Grid Charge, you need select.
②

- 37 -
Float V 53.6V 20%
35%
50%
-5
Absorption V
57.6V
Equalization V
57.6V
Equalization Days
Shutdown
Low Batt
Restart
TEMPCO(mV/C/Cell)
Batt Resistance
30 days
Equalization Hours
3.0 hours
25mOhms
Battery Setting
Set3
Batt
①
②
③
Lithium Mode
Shutdown
Low Batt
Restart
40%
20%
10%
00
Battery Setting
Set3
Batt
Power: 6000W Today=10 KWH
Total =10 KWH
Generator
V_L1: 230V
V_L2: 230V
V_L3: 230V
P_L1: 2KW
P_L2: 2KW
P_L3: 2KW
Recommended ba�ery se�ngs
Baery Type
AGM (or PCC)
Absorpon Stage
14.2V (57.6V) 13.4V (53.6V)
Float Stage
Equalizaon Voltage
(every 30 days 3hr )
14.2V (57.6V)
Gel 14.1V (56.4V) 13.5V (54.0V)
Wet 14.7V (59.0V) 13.7V (55.0V) 14.7V (59.0V)
Lithium Follow its BMS voltage parameters
Three stage charging strategy for lead-acid and imcompa�ble
lithium ba�ery.
①
②
This is for professional installers, you can keep it if you do not know.
When the "Use Ba� V" or "Use Ba� %" mode is selected, the
content on the "Ba� Set 3" page is shown as the figure on the le�.
Shutdown: Be valid in Off-grid mode, when ba�ery SOC/
voltage drop to this value, then the DC/AC inverter module of
this inverter will be shut down and the solar power can only
be used to charge the ba�ery.
Low Ba� : Be valid in On-grid mode, when the "Grid
charge" has been checked and the set target ba�ery SOC/
voltage on "Time of Use" page isn't less than the "Low Ba�"
value, the ba�ery SOC/voltage will remain above the value
of "Low Ba�" .
Restart 50%: Be valid in Off-grid mode, a�er the DC/AC
inverter module of this inverter is shut down, the PV power
can only be used to charge the ba�ery. When the ba�ery
SOC has returned to this "Restart" value, the DC/AC inverter
module will restart to output AC power.
③
Click the generator icon on the main screen, you can
enter the 'Generator' detail page. The informa�on
contained on this page is as follows:
(1) How much power is using from generator;
(2) How much energy has used from generator in today
or in total;
(3) The output voltage and power on each phase of
generator.
When the “Lithium” mode is selected, the content on the
"Ba� Set 3" page is shown in the figure on the le�.
Lithium Mode: This is the BMS communica�on protocol
code which can be confirmed on the "Approved Ba�ery
list" based on the ba�ery model you are using.
Shutdown: Be valid in Off-grid mode, ba�ery can discharge
to this SOC, then the DC/AC inverter module of this
inverter will be shut down and the solar power can only be
used to charge the ba�ery.
Low Ba�: Be valid in On-grid mode, when the 'Grid charge'
has been checked and the set target ba�ery SOC on 'Time
of Use' page isn't less than the "Low Ba�" value, the
ba�ery SOC will remain above the value of "Low Ba�" .
Restart: Be valid in Off-grid mode, a�er the DC/AC inverter
module of this inverter is shut down, the PV power can
only be used to charge the ba�ery. A�er the ba�ery SOC
has resumed to this "Restart" value, the DC/AC inverter
module will restart to output AC power.

- 38 -
5.7 System Work Mode Setup Menu
Zero Export To Load
Max Solar Power
Zero Export To CT
Max Sell Power
Energy pattern
BattFirst LoadFirst
System Work Mode
Solar Sell
Solar Sell
12000
12000
Power
8000
Zero-export Power
20
Selling First
Work
Mode1
Grid Peak Shaving
Work Mode
Selling First: This Mode allows hybrid inverter to sell
back any excess power produced by the solar panels to
the grid. If �me of use is ac�ve, the ba�ery energy also
can be sold into grid.
The PV energy will be used to power the load and charge
the ba�ery, then the excess will flow to grid.
Power source priority for the load is as follows:
1. Solar Panels.
2. Ba�eries(when the actual ba�ery SOC is higher than
the target SOC).
3. Grid.
Max Solar Power: the maximum DC input power allowed.
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid
inverter will neither provide power to the home load nor sell power to grid,if the "solar sell" behind is not
enabled. The built-in CT will detect power flowing back to the grid and will reduce the power of the inverter
only to supply the backup load and charge the ba�ery.
Load consump�on=Backup load
Zero Export To CT:
Hybrid inverter will not only provide power to the backup load connected but also give
power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy as
supplement. The hybrid inverter will not sell power to grid,if the "solar sell" behind is not enabled. In this
mode, external CTs or smart meter must be installed. For the installa�on method of CTS or smart meter,
please refer to the sec�on 3.7 . The external CTs or smart meter will detect power flowing back to the grid
and will reduce the power of the inverter only to supply the backup load, home load and charge the ba�ery.
Load consump�on=Backup load+home load
GridBackup Load On-Grid Home Load
Battery
Solar
GridBackup Load On-Grid Home Load
Battery
Solar
CT
Solar Sell:
"Solar sell" is selectable for Zero export to load or Zero export to CT. When ac�va�ng it, the surplus
of the energy generated by the PV can be sold back to grid. When it is ac�ve, the energy generated by the PV
array will first power the loads or charge the ba�ery, and then export to grid.
Max. sell power:
Maximum power allowed to flow to grid.
Zero-export Power:
This parameter will ensure the zero-export by taking from the grid some small amount of
energy that has been set with this value. It is recommended to set it as 20-100W to ensure the hybrid inverter
won' t feed power to grid.
Energy Pa�ern:
Priority of PV power usage. When "Grid charge" is enabled, the default energy pa�ern is "Load
First", this se�ng will be invalid.
Ba� First:
PV power is firstly used to charge the ba�ery, and the excess power will be used to power the load.
If PV power is insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First:
PV power is firstly used to power the load, and the excess power will be used to charge the ba�ery.
If PV power is insufficient, Grid will provide power to load.
Grid Peak-shaving:
when it is ac�ve, grid power will be limited within the set value. If the grid peak-shaving
power plus PV power plus ba�ery power cannot meet the power consump�on of the load a�er peak-shaving,
the grid peak-shaving will be invalid, and the power taken from the grid can exceed this set value.

- 39 -
Time of use: it is used to program when to use grid or
generator to charge the ba�ery, and when to discharge
the ba�ery to power the load. Only �ck "Time Of Use"
then the follow items (Grid, charge, �me, power etc.)
will take effect.
Note: when in selling first mode and click �me of use,
the ba�ery power can be sold into grid.
Grid charge: u�lize grid to charge the ba�ery in a �me
period.
Gen charge:
u�lize diesel generator to charge the ba�ery
in a �me period.
Time: real �me, range of 01:00-24:00.
Note: when the grid is present, only the “�me of use”
is �cked, then the ba�ery will discharge. Otherwise,
the ba�ery won’t discharge even the ba�ery SOC is
full. But in the off-grid mode (when grid is not
available, inverter will work in the off-grid mode
automa�cally).
Power: Max. discharge power of ba�ery allowed.
Ba�(V or SOC %): ba�ery SOC % or voltage at when the
ac�on is to happen.
Time Of Use
Time
System Work Mode
Batt
Grid
Charge
Gen
00:00
05:00
09:00
13:00
17:00
21:00
5:00
9:00
13:00
17:00
21:00
00:00
Power
12000
12000
12000
12000
12000
12000
49.0V
50.2V
50.9V
51.4V
47.1V
49.0V
Work
Mode2
For example
During 00:00-05:00,
if ba�ery SOC is lower than 80%, it will use grid to charge the
ba�ery un�l ba�ery SOC reaches 80%.
During 05:00-08:00,
if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%. At the same �me,
if ba�ery SOC is lower than 40%, then grid will charge the
ba�ery SOC to 40%.
During 08:00-10:00,
if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
During 10:00-15:00,
when ba�ery SOC is higher than 80%, hybrid inverter will
discharge the ba�ery un�l the SOC reaches 80%.
During 15:00-18:00,
when ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
During 18:00-00:00,
when ba�ery SOC is higher than 35%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 35%.
Grid Charge
Gen Charge
Grid SignalGen Signal
Gen Max Run Time 0.0 hours
Gen Down Time 0.5 hours
Battery Setting
Start
A
30% 30%
40A
40A
Batt
Set2
Time Of Use
Time
System Work Mode
Batt
Charge
Gen
00:00
05:00
08:00
10:00
15:00
18:00
5:00
8:00
10:00
15:00
18:00
00:00
Power
80%
40%
40%
80%
40%
35%
Work
Mode2
12000
12000
12000
12000
12000
12000
Grid
②
It allows users to choose which day to execute the
se�ng of “Time of Use”.
For example, the inverter will execute the �me of use
page on Mon/Tue/Wed/Thu/Fri/Sat only.
Mon
System Work Mode
Tue Wed Thu Fri Sat Sun
Work
Mode4

- 40 -
5.8 Grid Setup Menu
U
V
W
220VAC
Rz
Rz: Large resistance ground resistor. Or the system
doesn’t have Neutral line
220VAC 220VAC
N
0/11
Grid Setting/Grid code selection
Grid Mode
Grid Level
0/120/240
0/240/120
Grid
Set1
Grid Frequency
50HZ
60HZ
General Standard
Phase Type
IT system-neutral is not grounded
Reconnection Time PF
60s
1.000
Grid Setting/Connect
Low frequency
Normal connect
48.00Hz
Low voltage
185.0V
High frequency 51.50Hz
Normal Ramp rate 10s
Reconnect Ramp rate 36s
High voltage
265.0V
Low frequency
Reconnect after trip
Low voltage
High frequency
51.30Hz
High voltage
263.0V
48.20Hz
187.0V
Grid
Set2
LN:220VAC LL:380VAC
0/11
Grid Setting/Grid code selection
Grid Mode
Grid Level
0/120/240
0/240/120
Grid
Set1
Grid Frequency
50HZ
60HZ
General Standard
Phase Type
IT system-neutral is not grounded
LN:133VAC LL:230VAC
Over voltage U>(10 min. running mean)
Grid Setting/IP Protection
260.0V
Set3
Grid
--
HV1
265.0V
0.10s
--
HV2
265.0V
0.10s
HV3
--
LV1
185.0V
0.10s
--
LV2
185.0V
0.10s
185.0V
LV3
--
HF1
51.50Hz
0.10s
--
HF2
0.10s
HF3
--
LF1
48.00Hz
0.10s
--
LF2
0.10s
LF3
①
②
① ②
0.10s—Trip �me.
LV1: Level 1 undervoltage protec�on point;
LV2: Level 2 undervoltage protec�on point;
LV3: Level 3 undervoltage protec�on point.
HV1: Level 1 overvoltage protec�on point;
HV2: Level 2 overvoltage protec�on point;
HV3: Level 3 overvoltage protec�on point.
HF1: Level 1 over frequency protec�on point;
HF2: Level 2 over frequency protec�on point;
HF3: Level 3 over frequency protec�on point.
LF1: Level 1 under frequency protec�on point;
LF2: Level 2 under frequency protec�on point;
LF3: Level 3 under frequency protec�on point.
265.0V
51.50Hz
51.50Hz
48.00Hz
48.00Hz
Grid Mode:General Standard、UL1741 & IEEE1547、
CPUC RULE21、SRD-UL-1741、CEI 0-21、Australia A、
Australia B、Australia C、EN50549_CZ-PPDS(>16A)、
NewZealand、VDE4105、OVE-Direc�ve R25.
Please follow the local grid code and then choose the
corresponding grid standard.
Grid level: there’re several voltage levels for the inverter
output voltage when it is in off-grid mode.
LN:230VAC LL:400VAC, LN:240VAC LL:420VAC
,
LN:120VAC LL:208VAC, LN:133VAC LL:230VAC,
LN:220VAC LL:380VAC.
IT system: If the grid system is IT system, then please
Normal connect: The allowed grid voltage/frequency
range when the inverter operates normally.
Normal Ramp rate: It is the startup power ramp.
Reconnect a�er trip: The allowed grid voltage/frequency
range for the inverter connects the grid a�er the inverter
trip from the grid.
Reconnect Ramp rate: It is the reconnec�on power ramp.
Reconnec�on �me: The wai�ng �me for the inverter
connects the grid again a�er tripping.
PF: Power factor, which is the ra�o of ac�ve power to
apparent power in AC circuits and can be used to adjust
the output ac�ve power and reac�ve power of inverter.
enable this op�on. All the live lines of IT system are insulated from ground, and the neutral point of the IT
system is grounded through high impedance or not grounded (as shown in the following figure).

- 41 -
F(W): It's used to adjust the output ac�ve power of inverter
according to the grid frequency.
Droop F: percentage of nominal power per Hz
For example, “Start freq F=50.2Hz, Stop freq F=51.5,
Droop F=40%PE/Hz” when the grid frequency reaches
51.2Hz, the inverter will decrease its ac�ve power at
Droop F of 40%. And then when grid system frequency
is less than 50.1Hz, the inverter will stop decreasing
output power.
For the detailed setup values, please follow the local
grid code.
Grid Setting/F(W)
F(W)
Start freq F
Over frequency
50.20Hz
Start delay F
0.00s
Stop freq F 51.5Hz
Droop F 40%PE/Hz
Stop delay F
0.00s
Start freq F
Under frequency
49.80Hz
Start delay F
Stop freq F 49.80Hz
Droop F 40%PE/Hz
Stop delay F
0.00s
0.00s
Grid
Set4
Grid Setting/LVRT
L/HVRT
HV3
0%
HV3_T
30.24s
HV2
0%
HV2_T
0.04s
HV1
0%
HV1_T
22.11s
LV1
0%
LV1_T
22.02s
LV2
0%
LV2_T
0.04s
Grid
Set7
LVRT/HVRT: When the voltage of the power grid reaches
the set HV or LV, the relay at the inverter grid port will
remain closed for the set �me to maintain stable grid
connec�on without tripping.
Grid Setting/V(W) V(Q)
V(W) V(Q)
V1
108.0%
P2
V2
110.0%
P3
P4
V3
112.0%
V4
114.0%
P1
100%
80%
60%
40%
Lock-in/Pn Lock-out/Pn
V1
94.0%
Q2
V2
97.0%
Q3
Q4
V3
105.0%
V4
108.0%
Q1
44%
0%
0%
-44%
Grid
Set5
V(W): It is used to adjust the inverter's ac�ve power
according to the set grid voltage.
V(Q): It is used to adjust the inverter's reac�ve power
according to the set grid voltage.
These two func�ons are used to adjust inverter's output
power (ac�ve power and reac�ve power) when grid
voltage changes.
Lock-in/Pn 5%: When the inverter ac�ve power is less
than 5% rated power, the V(Q) mode will not take effect.
Lock-out/Pn 20%: If the inverter ac�ve power is
increasing from 5% to 20% rated power, the V(Q) mode
will take effect again.
For example: V2=110%, P2=80%. When the grid voltage reaches 110% of the rated grid voltage,
inverter will reduce its ac�ve power output to 80% of the rated power.
For example: V1=94%, Q1=44%. When the grid voltage reaches 94% of the rated grid voltage,
inverter will output reac�ve power that accounts for 44% of the rated power.
For the detailed setup values, please follow the local grid code.
Grid Setting/P(Q) P(F)
P(Q) P(PF)
P1
0%
Q2
P2
2%
Q3
Q4
P3
0%
P4
22%
Q1
2%
0%
21%
25%
P1
0%
PF2P2
0%
PF3
PF4
P3
0%
P4
62%
PF1
-0.000
-0.000
0.000
0.264
Grid
Set6
P(Q): It is used to adjust the output reac�ve power of
inverter according to the set ac�ve power.
P(PF): It is used to adjust the PF of inverter according
to the set ac�ve power.
For the detailed setup values, please follow the local
grid code.
Lock-in/Pn Lock-out/Pn
5%
20%
50%
50%
Lock-in/Pn 50%: When the output ac�ve power of
inverter is less than 50% of inverter's rated power, it
won't enter the P(PF) mode.
Lock-out/Pn 50%: When the output ac�ve power of
inverter is higher than 50% of inverter's rated power,
it will enter the P(PF) mode.
Note: only when the grid voltage is equal to or higher
than 1.05 �mes of the rated grid voltage, then the P(PF)
mode will take effect.

5.9 Generator Port Use Setup Menu
- 42-
5.10 Advanced Func�on Setup Menu
Generator input rated power: allowed Max. power from diesel
generator.
AC couple on Grid side:
Connect one or several on-grid inverters
on the Grid port side of this hybrid inverter.
AC couple on Load side:
Connect one or several on-grid inverters
on the Load port side of this hybrid inverter.
GEN connect to Grid input: connect the diesel generator to the
grid input port.
Smart Load Output: Use the GEN port as an AC output port, and
the load connected to this port can be controlled on/off by the
hybrid inverter.
e.g. ON: 100%, OFF=95%: When the ba�ery bank SOC reaches
100%, Smart Load Port will switch on automa�cally and power
the load connected. When the ba�ery bank SOC < 95% , the
Smart Load Port will switch off automa�cally.
Solar Arc Fault ON(Optional)
Clear Arc_Fault(Optional)
System selfcheck
BMS_Err_Stop
CEI Report
0ms
2000:1
Backup Delay
Advanced Function
Func
Set1
DRM
Gen peak-shaving
CT Ratio
Signal Island Mode
Asymmetric phase feeding
Solar Arc Fault ON(Op�onal):
This feature is op�onal. A�er
enabling this func�on, the inverter will detect whether there is
a arcing fault on the PV side. If arcing occurs, the inverter will
report a fault and stop outpu�ng power.
Clear Arc_Fault(Op�onal):
A�er the arc fault on the PV side is
eliminated, enabling this func�on can eliminate the arc fault
alarm of the inverter and restore normal opera�on of the inverter.
System selfcheck:
Disable. this is only for factory.
Gen Peak-shaving:
Enable When the power of the
generator exceeds the rated value of it, the inverter will
provide the redundant part to ensure that the generator
will not overload.
DRM: Demand response mode, receive external commands
for ac�ve power scheduling and reac�ve power scheduling.
L1 L2 L3 N
Load port
Inverter
Shell
Relay
Ground cable
*
Signal island mode:
If "Signal island mode" is checked and When
inverter is in off-grid mode, the relay on the Neutral line (load port
N line) will switch ON then the N line (load port N line) will bind to
inverter ground.
* If this item was selected, please ensure that the shell of the inverter
is grounded, otherwise there will be electric shock if you touch the shell.
Backup Delay:
When the grid cuts off, the inverter will give output power a�er the se�ng �me.
For example, backup delay: 3ms. the inverter will give output power a�er 3ms when the grid cuts off.
Note: for some old FW version, the func�on is not available.
CT Ra�o:
When using an external CT alone, this parameter needs to be set. When using an external meter, it
does not need to be set.
BMS_Err_Stop:
When it is ac�ve, if the ba�ery BMS failed to communicate with inverter, the inverter will
stop working and report fault.
Mode
OFF(V)
ON(V)
Generator Input
SmartLoad Output
Micro Inv Input
On Grid always on
GEN connect to Grid input
AC couple on Grid side
AC couple on Load side
Ml export to Grid cutoff
GEN PORT USE
55.00Hz
54.0V
51.0V
Rated Power
AC Couple Frz High
8000W
PORT
Set1
Smart Load OFF Ba�
• Ba�ery SOC or voltage at which the Smart load will switch off.
Smart Load ON Ba�
• Ba�ery SOC or voltage at which the Smart load will switch on.
On Grid always on: When "on Grid always on" is checked, the smart load port will always keep switching on if hybrid
inverter is opera�ng in on-grid mode.
Micro Inv Input: Use the GEN port as an AC couple input port, which can be connected with micro-inverter or other
Grid-Tied inverter.
*Micro Inv Input OFF: When the ba�ery SOC or voltage rise to this set value and the hybrid inverter is opera�ng in
off-grid mode, the frequency of GEN port of hybrid inverter will be raised to 'AC Couple Frz High' to trip the Grid-�ed
inverter. It's invalid in on-grid mode.
*Micro Inv Input ON: When the ba�ery SOC or voltage drops below this set value, the relay on GEN port of hybrid
inverter will be switched on, then the Grid-Tied inverter will generate power and feed into hybrid inverter.
AC Couple Frz High: If choosing "Micro Inv input", as the ba�ery SOC reaches gradually se�ng value (OFF), during the
process, the microinverter output power will decrease linear. When the ba�ery SOC equals to the se�ng value (OFF),
the system frequency will become the se�ng value (AC couple Frz high) and the Microinverter will stop working.
Ml export to Grid cutoff: Stop expor�ng power produced by the microinverter or Grid-Tied inverter to the grid.
*Note: Micro Inv Input OFF and On is valid for some certain FW version only.

- 43 -
Asymmetric phase feeding:
When the loads connected to the Load port have an unbalanced distribu�on
on the three phases and the inverter is working in on-grid mode, enabling this func�on will ensure an equal
power absorp�on from the three phases of grid.
DC 1 for WindTurbine:
Connect the wind turbine
to the MPPT 1 of hybrid
inverter.
DC 2 for WindTurbine:
Connect the wind turbine
to the MPPT 2 of hybrid
inverter.
This is for Wind Turbine
16.5
0
310
I/A
U/V
DC 1 for WindTurbine
V1
V2
V3
V4
V5
V6
V7
V8
V9
V10
V11
V12
90V
110V
130V
150V
170V
190V
0.0A
1.5A
3.0A
4.5A
6.0A
7.5A
210V
230V
250V
270V
290V
310V
9.0A
10.5A
12.0A
13.5A
15.0A
16.5A
DC 2 for WindTurbine
Advanced Function
Wind
Set2
Parallel:
Enable this func�on when several same model hybrid
inverters are connec�ng in parallel.
Master:
Select any hybrid inverter in the parallel system as the
master inverter, and the master inverter needs to manage the
working mode of the parallel system.
Slave:
Set the other inverters managed by the master inverter
as slave inverter.
Modbus SN:
The Modbus address of each inverter, should be
different.
Baud Rate:
The rate at which inverter transmits data.
Ex_Meter For CT:
when using zero-export to CT mode, the
hybrid inverter can select EX_Meter For CT func�onand use
the different meters.e.g.CHNT and Eastron.
Grid Tie Meter2:
When there are one or more grid-�ed inverters
AC coupled on the grid or load port side of the hybrid inverter,
and an external meter is installed for this/these grid-�ed inverters,
it is necessary to enable this func�on to upload the data of the
external meter to the hybrid inverter to ensure that the power
consump�on data of the load is correct.
CT Check:
Inverter will perform self check on external CT and
return the test results.
MPPT Scan:
A�er enabling this func�on, MPPT will perform
I-V curve scanning every 5 minutes to find the maximum power
point again and eliminate MPPT failure caused by shadows.
Parallel
Master
Slave
00
Modbus SN
0000
Baud Rate
Paral.
Set3
EX_Meter For CT Grid Tie Meter2
CT check
MPPT Scan
Meter Select
0/3No Meter
CHNT
Eastron
Advanced Function
CT_Data:
The CT self-check result data presented in decimal
format needs to be parsed into binary to display whether the
three CTs are correctly connected.
CT_CTA:
Analysis of A-phase CT self-check result.
CT_CTB:
Analysis of B-phase CT self-check result.
CT_CTC:
Analysis of C-phase CT self-check result.
CT SelfCheck
CT_Data: 0
CT_CTA: FAIL
CT_CTB: FAIL
CT_CTB: FAIL

- 44 -
Mode II: With Generator
Grid
Backup Load On-Grid Home Load
Battery
Solar
CT
AC cable DC cable
Generator
6. Mode
Mode I:Basic
Grid
Backup Load On-Grid Home Load
CT
Battery
Solar
AC cable DC cable
COM cable
5.11 Device Info Setup Menu
HMI: LCD version
1
2
3
50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
50.33V 19.10A 31.0C 51.0% 25.5Ah 53.2V 25.0A 0|0|0
50.30V 16.90A 30.2C 12.0% 6.0Ah 53.2V 25.0A 0|0|0
4
5
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6
7
8
10
Sum
Data
Details
Data
Li-BMS
1
2
3
50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
50.33V 19.10A 31.0C 51.0% 25.5Ah 53.2V 25.0A 0|0|0
50.30V 16.90A 30.2C 12.0% 6.0Ah 53.2V 25.0A 0|0|0
4
5
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6
7
8
10
Sum
Data
Details
Data
Li-BMSDevice Info.
Alarms Code
F56 DC_VoltLow_Fault
F13 Grid_Mode_changed
F56 DC_VoltLow_Fault
F13 Grid_Mode_changed
2024-04-29 09:33
2024-04-29 07:22
2024-04-29 03:22
2024-04-29 03:11
Occurred
Device
Info
Li-BMSLi-BMSDevice Info.
MAIN: Control board FW version
These page show Inverter ID, Inverter version and alarm
codes.
Version Info Fault Log
Li-BMSLi-BMSDevice Info.
12K
Inverter SN: 2404098579 Flash
HMI: Ver 1001-C047
MAIN:Ver 2021-1145-1807
ARC:VerD206

- 45 -
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
Grid
Backup Load
On-Grid Home Load
Battery
Solar
CT
AC cable DC cable
Smart Load
Mode III: With Smart-Load
Mode IV: AC Couple
Grid
Backup Load On-Grid Home Load
Battery
Solar
On-GEN+AC couple
AC cable DC cable
On-Grid Inverter
CT
Error code Descripon Soluons
F07
DC_START_Failure
1. The BUS voltage can t be built from PV or battery.
2. Restart the inverter, If the fault still exists, please
contact us for help
F01 DC input polarity reverse fault
1. Check the PV input polarity
2. Seek help from us, if can not go back to normal state.
7. Limita�on of Liability
In addi�on to the product warranty described alone, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy can and can only legally exclude all liability within a limited scope.

- 46 -
Error code Descripon Soluons
F22
Tz_EmergStop_Fault
Remotely shutdown
1. it tells the inverter is remotely controlled.
F23
Tz_GFCI_OC_ current is
transient over current
Leakage current fault
1. Check PV side cable ground connection.
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
F24 DC insulation failure
PV isolation resistance is too low
1. Check the connection of PV panels and inverter is firmly and
correctly;
2. Check whether the PE cable of inverter is connected
to ground;
3. Seek help from us, if can not go back to normal state.
F21 Tz_HV_Overcurr_fault
BUS over current.
1. Check the PV input current and battery current setting
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
F13
working mode change
F15
AC over current fault of
software
F16 AC leakage current fault
F18
AC over current fault
of hardware
F20
DC over current fault ofthe
hardware
1. When the grid type and frequency changed it will report F13;
2. When the battery mode was changed to “No battery”
mode,it will report F13;
3. For some old FW version, it will report F13 when the
system work mode changed;
4. Generally, it will disappear automatically when shows F13;
5. If still same, and turn off the DC switch and AC switch and
wait for one minute and then turn on the DC/AC switch;
6. Seek help from us, if can not go back to normal state.
AC side over current fault
1. Please check whether the backup load power and common
load power are within the range;
2. Restart and check whether it is in normal;
3. Seek help from us, if can not go back to normal state.
Leakage current fault
1. Check the PV side cable ground connection
2. Restart the system 2-3 times
3. if the fault still existing, please contact us for help.
AC side over current fault
1. Please check whether the backup load power and
commonload power are within the range;
2. Restart and check whether it is in normal;
3. Seek help from us, if cannot go back to normal state.
DC side over current fault
1. Check PV module connect and battery connect;
2. When in the off-grid mode, the inverter startup with big
power load, it may report F20. Please reduce the load power
connected;
3. Turn off the DC switch and AC switch and then wait one minute,
then turn on the DC/AC switch again;
4. Seek help from us, if can not go back to normal state.

- 47 -
F26 The DC busbar isunbalanced
1. Please wait for a while and check whether it is normal;
2. When the load power of 3 phases is big different, it will report
the F26.
3 .When there’s DC leakage current, it will report F26
4. Restart the system 2~3 times.
5. Seek help from us, if can not go back to normal state.
F29
Parallel CAN Bus fault
1. When in parallel mode, check the parallel communication
cable connection and hybrid inverter communication
address setting;
2. During the parallel system startup period, inverters will report
F29.But when all inverters are in ON status, it will disappear
automatically;
3. If the fault still exists, please contact us for help.
F34 AC Overcurrent fault
F41 Parallel system stop
F42
AC line low voltage
1.Check the hybrid inverter work status. If there’ 1pcs
hybrid inverter shutdown, all hybrid inverters
will report F41 fault.
2.If the fault still exists, please contact us for help
1. Check the backup load connected, make sure it is in allowed
power range
2.If the fault still exists, please contact us for help
Grid voltage fault
1. Check the AC voltage is in the range of standard voltage
inspecification;
2. Check whether grid AC cables are firmly and correctly
connected;
3. Seek help from us, if can not go back to normal state.
s
Error code Descripon Soluons
F47
AC over frequency
Grid frequency out of range
1. Check the frequency is in the range of specification or not;
2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
F48
AC lower frequency
Grid frequency out of range
1. Check the frequency is in the range of specification or not;
2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
F55 DC busbar voltage is too high
BUS voltage is too high
1. Check whether battery voltage is too high;
2. check the PV input voltage, make sure it is within the allowed
range;
3. Seek help from us, if can not go back to normal state.
F46 backup battery fault
1. Please check each battery status, such as voltage/ SOC and
parameters etc., and make sure all the parameters are same.
2. If the fault still exists, please contact us for help

- 48 -
Under the guidance of our company, customers return our products so that our company can
provide service of maintenance or replacement of products of the same value. Customers need to
pay the necessary freight and other related costs. Any replacement or repair of the product will
cover the remaining warranty period of the product. If any part of the product or product is
replaced by the company itself during the warranty period, all rights and interests of the
replacement product or component belong to the company.
Factory warranty does not include damage due to the following reasons:
· Damage during transporta�on of equipment;
· Damage caused by incorrect installa�on or commissioning;
· Damage caused by failure to comply with opera�on instruc�ons, installa�on instruc�ons or
maintenance instruc�ons;
· Damage caused by a�empts to modify, alter or repair products;
· Damage caused by incorrect use or opera�on;
· Damage caused by insufficient ven�la�on of equipment;
· Damage caused by failure to comply with applicable safety standards or regula�ons;
· Damage caused by natural disasters or force majeure (e.g. floods, lightning, overvoltage, storms,
fires, etc.)
In addi�on, normal wear or any other failure will not affect the basic opera�on of the product.
Any external scratches, stains or natural mechanical wear does not represent a defect in the
product.
Error code Descripon Soluons
F56 DC busbar voltage is too low
Battery voltage low
1. Check whether battery voltage is too low;
2. If the battery voltage is too low, using PV or grid to
charge thebattery;
3. Seek help from us, if can not go back to normal state.
F58 BMS communication fault
1. it tells the communication between hybrid inverter and battery
BMS disconnected when “BMS_Err-Stop” is active”
2. if don’t want to see this happen, you can disable
“BMS_Err-Stop” item on the LCD;
3. If the fault still exists, please contact us for help
F62 DRMs0_stop
F63 ARC fault
F64
Heat sink high
temperaturefailure
1. Check PV module cable connection and clear the fault;
2. Seek help from us, if can not go back to normal state.
1. Check the DRM function is active or not;
2. Seek help from us, if can not go back to normal state after
restart the system.
Heat sink temperature is too high
1. Check whether the work environment temperature is too high;
2. Turn off the inverter for 10mins and restart;
3. Seek help from us, if can not go back to normal state.
Chart 7-1 Fault informa�on

- 49 -
8. Datasheet
Lead-acid or Lithium-ion
40-60
1
Self-adap�on to BMS
800
160
200-650
350-650
550
220/380V,230/400V 0.85Un-1.1Un
2 �mes of rated power, 10s
45
0
3L+N+PE
50Hz/45Hz-55Hz 60Hz/55Hz-65Hz
0.8 leading-0.8 lagging
<3% (of nominal power)
97.60%
97.00%
>99%
Yes
Yes
Yes
Yes
Yes
Yes
<0.5%In
Model
Baery Input Data
Charging Strategy for Li-ion Ba�ery
Ba�ery Type
Ba�ery Voltage Range(V)
Max. Charging Current(A)
Max. Discharging Current(A)
Number of Ba�ery Input
PV String Input Data
Max. PV Input Power(W)
Max. PV Input Voltage(V)
Start-up Voltage(V)
MPPT Voltage Range(V)
Full Load MPPT Voltage Range(V)
Max. Opera�ng PV Input Current(A)
No. of MPP Trackers/No. of Strings MPP Tracker
160-800PV Input Voltage Range(V)
Rated PV Input Voltage(V)
Max. AC Input/Output Apparent Power(VA)
Peak Power (off-grid)
(W)
Max. AC Input/Output Current(A)
Max. Three-phase Unbalanced Output Current(A)
Max. Con�nuous AC Passthrough (grid to load)(A)
Rated Input/Output Voltage/Range(V)
Rated AC Input/Output Current(A)
Max. Inverter Backfeed Current to The Array
AC Input/Output Data
Rated AC Input/Output Ac�ve Power(W)
Grid Connec�on Form
Power Factor Adjustment Range
Rated Input/Output Grid Frequency/Range
Total Current Harmonic Distor�on THDi
Efficiency
Max. Efficiency
Euro Efficiency
MPPT Efficiency
Equipment Protecon
AC Output Overvoltage Protec�on
AC Output Short Circuit Protec�on
AC Output Overcurrent Protec�on
DC Polarity Reverse Connec�on Protec�on
Thermal Protec�on
DC Terminal Insula�on Impedance Monitoring
DC Injec�on Current
Max. Input Short-Circuit Current(A)
13+13
17+17
2/1+1
26+13
34+17
2/2+1
7500
5500
5000
120
120
8.4/8
7.6/7.2
11.4/10.9
SUN-5K-
SG04LP3-EU
9000
6600
6000
150
150
10/9.6
9.1/8.7
13.6/13
SUN-6K-
SG04LP3-EU
12000
8800
8000
190
190
13.4/12.8
12.1/11.6
18.2/17.4
SUN-8K-
SG04LP3-EU
15000
11000
10000
210
210
16.7/15.9
15.2/14.5
22.7/21.7
SUN-10K-
SG04LP3-EU
18000
Max. PV access power(W) 10000 12000 16000 20000 24000
70
Max. Output Fault Current(A)
Max. Output Overcurrent Protec�on(A)
16.8 20 26.8 33.4 40
13200
12000
240
240
20/19.1
18.2/17.4
27.3/26.1
SUN-12K-
SG04LP3-EU

- 50 -
IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2
IEC 61727,IEC 62116,CEI 0-21,EN 50549,NRS 097,RD 140,
UNE 217002,OVE-Richtlinie R25,G99,VDE-AR-N 4105
5 Years/10 Years
the Warranty Period Depends the Final Installa�on Site of Inverter,
More Info Please Refer to Warranty Policy
Surge Protec�on Level
Monitor Mode
Power Network Monitoring
Island Protec�on Monitoring
Earth Fault Detec�on
DC Input Switch
Overvoltage Load Drop Protec�on
Residual Current (RCD) Detec�on
General Data
Grid Regula�on
Safety EMC/Standard
Interface
Opera�ng Temperature Range
Permissible Ambient Humidity
Permissible Al�tude
Weight(kg)
Cabinet size(W*H*D) [mm]
Warranty
Noise
Ingress Protec�on(IP) Ra�ng
Inverter Topology
Over Voltage Category
Type of Cooling
TYPE II(DC), TYPE II(AC)
GPRS/WIFI/Bluetooth/4G/LAN(op�onal)
Communica�on Interface RS232, RS485, CAN
Display LCD+LED
Yes
Yes
DC Component Monitoring
Ground Fault Current Monitoring
Yes
Yes
Arc fault circuit interrupter (AFCI) Op�onal
Yes
Yes
Yes
Yes
-40 to +60℃, >45℃ Dera�ng
2000m
0-100%
Intelligent Air Cooling
38
422W×658H×254D (Excluding connectors and brackets)
≤ 55 dB
IP 65
Non-Isolated
OVC II(DC), OVC III(AC)

- 51 -
9. Appendix I
Defini�on of RJ45 Port Pin for BMS
1
No.
485_B
RS485 Pin
2 485_A
3
--
4 CAN-H
5 CAN-L
6 GND_485
7 485_A
8 485_B
BMS Port
Modbus port
Defini�on of RJ45 Port Pin for Meter-485
1
No.
2
3
4
5
6
7
8
METER-485-B
Meter-485 Pin
METER-485-A
COM-GND
METER-485-B
METER-485-A
COM-GND
METER-485-A
METER-485-B
Meter-485 Port
Note : for some hardware versions, this port is useless.
1
No.
2
3
4
5
6
7
8
485_B
485_B
Modbus port
485_A
GND_485
GND_485
--
--
485_A
Defini�on of RJ45 Port Pin of "Modbus port" for
remotely monitoring
12345678
87654321
12345678
87654321
12345678
87654321

- 52 -
RS232
USB
DB9 (RS232)
12345
6789
This model of inverter has two types of logger interfaces, DB9 and USB. Please refer to the
actual inverter received for the actual interface type.
1
No.
D-GND
RS232
2
3
4
5
6
TX
7
12Vdc
8
RX
9

- 53 -
12345678
87654321
DRM:It is used to accept the external control command.
1
No.
DI 1
DRM
2 DI 2
3 DI 3
DI 4
4
5
6 GND
REF
7 Reserved
8 Reserved
Defini�on of RJ45 Port Pin for DRM
Inverter RCR
12345678
1
K 1
K 2
K 3
K 4
2 3 4 5 6 7 8
K 1 0%
PIN 6 GND
PIN 5 REF
PIN 4 DI 4
PIN 3 DI 3
PIN 1 DI 1
PIN 2 DI 2
K 2 30%
K 3 60%
K 4 100%
15K

- 54 -
1. Split Core Current Transformer (CT) dimension: (mm)
2. Secondary output cable length is 4m.
10. Appendix II
Lead Outside
11. EU Declara�on of Conformity
within the scope of the EU directives
· Electromagnetic compatibility ����/��/EU (EMC)
· Low Voltage Directive ����/��/EU (LVD)
· Restriction of the use of certain hazardous substances ����/��/EU (RoHS)
NINGBO DEYE INVERTER TECHNOLOGY CO., LTD. confirms herewith that the products
described in this document are in compliance with the fundamental requirements and other
relevant provisions of the above mentioned directives. The entire EU Declaration of Conformity
and certificate can be found at https://www.deyeinverter.com/download/#hybrid-inverter-�.

- 55-
2025-03-26
240628001
www.deyeinverter.com
EU DoC
– v2
Ningbo Deye Inverter Technology Co., Ltd.
No. 26 South YongJiang Road, Daqi, Beilun, NingBo, China
EU Declaration of Conformity
Product:Hybrid Inverter
Models: SUN-5K -SG04LP3-EU;SUN-6K-SG04LP3-EU;SUN-8K-SG04LP3-EU;SUN-10K-SG04LP3-EU;
SUN-12K-SG04LP3-EU;
Name and address of the manufacturer: Ningbo Deye Inverter Technology Co., Ltd.
No. 26 South YongJiang Road , Daqi, Beilun, NingBo, China
This declaration of c onformity is issued under the sole responsibility of the manufacturer. Also this product
is under manufacturer’s warranty.
This declaratio
n of conformity is not valid any longer: if the product is modified, supplemented or changed in
any other way, as well as in case the pro duct is used or installed improperly.
The object of the declaration described above is in conformity with the relevant Union harmonization legislation:
The Low Voltage Directive (LVD) 2014/35/EU;the Electromagnetic Compatibility (EMC) Directive 2014/30/EU;the
restriction of the use of certain hazardous substances (RoHS) Directive
2011/65/EU.
References to the relevant harmonized standards used or references to the other technical specifications in
relation to which conformity is declared:
Additional information:The above applies to inverters produced after product serial number: 240 4 1 9 8 4 4 8
LVD:
EN 62109-1:2010
🔴
EN 62109-2:2011
🔴
EMC:
EN IEC 61000-6-1:2019
🔴
EN IEC 61000-6-2:2019
🔴
EN IEC 61000-6-3:2021
🔴
EN IEC 61000-6-4:2019
🔴
EN IEC 61000-3-2:2019+A1:2021
🔴
EN 61000-3-3:2013/A2:2021/AC:2022-01
🔴
EN IEC 61000-3-11:2019
🔴
EN 61000-3-12:2011
🔴
EN 55011:2016/A2:2021
🔴
Nom et Titre / Name and Title:
Au nom de / On behalf of:
Date / Date (yyyy-mm-dd):
A / Place:
Bard Dai
Senior Standard and Certification Engineer
Ningbo Deye Inverter Technology Co., Ltd.
2024-06-28
Ningbo, China

Add.: No.26 South YongJiang Road, Daqi, Beilun, NingBo, China.
Fax.: +86 (0) 574 8622 8852
Tel.: +86 (0) 574 8622 8957
E-mail: [email protected]
Web.: www.deyeinverter.com