HPO Tech HPOT-HC-ATL ATLANTIS Hyperbaric Chamber 2-2.4 ATA

Product's Documents

Below are documents related to this product, you can read online or download:
Installation Instruction User Manual
  • Atlantis Product Guide - (English) Download
HPOT-HC-ATL photo

Delivery & Installation Guide

This is the main product document for model HPOT-HC-ATL.

The file format is pdf, 22 pages, you can download this manual here .

background
Thank you for choosing to work with us. This guide is designed to help you,
our valued client, prepare thoroughly for the delivery and installation of
your HpoTech hyperbaric system.
It outlines essential logistical, spatial, electrical, and training requirements
for smooth installation. Please read each section carefully and complete
the indicated preparations to ensure a smooth setup.
HYPERBARIC CHAMBER
IMPORT & INSTALLATION GUIDE
background
2
1. Import procedures
After purchasing your products, several import procedures
will follow. Below is a step-by-step overview to guide you
through the process:
Step 1: Customs broker Step 3: Import duties & delivery
Step 2: Customs registration &
documentation
Step 4: Delivery scheduling &
equipment – Forklift
You will need a licensed customs broker to
handle your import process. If you don’t have
one, we can recommend trusted partners.
We’ll assist through the process with joint email
communication.
Once your products arrive at customs,
applicable VAT and import duties will be
calculated. After payment, your goods will be
transferred to a local warehouse and prepared
for delivery to your address.
Your broker will manage all necessary
registrations and submit the required import
documentation, based on your country's
regulations. Customs brokerage fees are the
customer’s responsibility.
You will receive a scheduled delivery date and
time in advance (e.g., "Your products will be
delivered on March 28 at 14:00").
Please ensure a forklift is available at the
delivery location to unload the products.
Important Note: Forklift service is not included
in the installation fee.
If the delivery vehicle arrives and cannot unload
the goods due to a lack of equipment, an
additional domestic transport fee may apply for
rescheduling and warehouse wait time.
To avoid such charges, please ensure a forklift is
available on site.
background
3
2. Space & access requirements
2.1 Module Dimensions
2.4 Entry & rolling path
2.5 Crane or lift
2.2 Site survey & logistics checklist
2.3 Forklift access
• Ensure a flat, clear, unobstructed path
• Remove all obstacles (furniture, equipment,
etc.) along the rolling path
• Protect vulnerable flooring (tile, hardwood, etc.)
• Check for stairs or elevation changes (more
than ½ inch or 13 mm = ramp required)
• Avoid unstable surfaces (grass, gravel); use
plywood if needed
• Assess for potential crane/lift need
• Ensure space and clearance for crane
operation
• Measure all doorways, hallways, and access
points from the delivery vehicle to the final
installation location.
• Identify tight turns, steps, elevators, or ceiling
issues
• Confirm truck access, including unloading
space
• Forklift must have a minimum 5,000 lb
(2,267.96 kg) capacity
• Forks must be at least 7.2 feet (218.44 cm) long
• Provide a level and stable unloading area
See technical plans for each chamber at the end of
this document.
All HpoTech hyperbaric chambers are modular
and built with 3, 4, 5, or more modules,
according to the number of seats available.
Each section/module is designed to fit through
standard doors.
Ensure that all passageways and doors
can accommodate at least these module
dimensions with buffer space:
• Width: 860 mm → 33.86 inches
• Height: 1860 mm → 73.23 inches
• Depth: 1910–1990 mm → 75.20 – 78.35 inches
background
4
3. Placement area for the
hyperbaric system
Designate a clean, dry, temperature-controlled
room that:
• Fits the full chamber footprint + access room
• Has a level, durable floor capable of supporting
the equipment's weight
• Is oriented for preferred visibility and panel
access
Auxiliary equipment setup
• Provide space for: Oxygen Generator, Chiller,
Compressor, Transformers
• Ensure airflow and avoid tight enclosures
• Do not block vents or fans
Environmental controls
• Maintain room temperature below 75°F (24°C)
• Avoid garages, attics, or low-ventilation zones
• Use HVAC/fans as needed
Noise considerations
• Consider proximity to quiet areas
• Use sound insulation if required
Placement of the hyperbaric chamber
• The hyperbaric chamber should not be
positioned with the acrylic facing direct sunlight.
• If the room has large windows, curtains or
blinds must be installed to shield the acrylic
from sun exposure.
Load bearing requirement
Ensure the total system weight does not exceed
the room’s floor load-bearing capacity.
This includes:
• The chamber itself: See Table
• Oxygen concentrators (based on number
of seats): 122 kg / 269 lbs each
• One air compressor: 97 kg / 213.8 lbs
• One air cooler: 44 kg / 98 lbs
&RPSUHVVRU
+HÕJKPP
a
:HÕJKWNJ
aÕEV
PP
PP
2[\JHQ*HQHUDWRU
+HÕJKPP
a
:HÕJKWNJ
aÕEV
PP
PP
a
a
a
a
&KÕOOHU
+HÕJKPP
a
:HÕJKWNJ
aÕEV
PP
PP
a
a
background
5
4. Handling & installation
preparation
Ensure handling equipment is arranged in
advance to avoid delays. Our team will indicate
the handling equipment necessary for your
installation.
*MATRiX may include either 1 or 2 oxygen concentrators.
Hyperbaric system weight summary
ATLANTIS
MEDITERRANEAN
TROJAN
ZEUGMA
PETRA
MATRiX*
1400 kg / 3087 lbs
1960 kg / 4322 lbs
180 kg / 396.8 lbs
800 kg / 1763 lbs
1100 kg / 2425.08 lbs
1550 kg / 3417.2* lbs
2
4
1
1
1
1–2
1785 kg / 3936 lbs
2589 kg / 5708 lbs
442 kg / 974.4 lbs
1063 kg / 2344 lbs
1363 kg / 3005 lbs
1812–1967 kg / 3994.1–4336.5 lbs
Chamber Base chamber
weight (kg / lbs)
Oxygen
concentrators
Total system weight
(kg / lbs)
Requirement
Forklift
Crane
Wheeled platform
Ramp
Installation personnel
Standard tools
Client responsibility
✓
✓
✓
✓
Minimum 2–3 persons
List provided if needed
background
6
5. Transportation & storage
Please coordinate with us for exact delivery
timing to minimize storage costs.
• Reserve parking for large delivery truck
• Ensure 2-3 hours unloading time. Consider
the possibility that the chamber needs to be
disassembled on the street if we cannot bring
it in for disassembly.
• If early delivery, arrange for local warehousing
Crate dimensions & delivery preparation guide
Our hyperbaric chambers are carefully packaged
and shipped in durable wooden crates to ensure
their safety during transport. Each component
inside the crate is individually protected using
polystyrene, bubble wrap, plastic film, and duct
tape to prevent any damage.
Upon delivery, the receiving team from the
client’s side should be prepared to assist with
the uncrating and unpacking process. Clients are
kindly requested to provide at least two helpers
equipped with the following basic tools and
safety gear:
• Hammers and pry bar (for crate disassembly)
• Electric screwdriver and screw bits (for crate
and component access)
• Cutters / utility knives (for removing wrapping
materials)
• Screwnails and gloves (for safe handling and
minor adjustments)
Please also ensure that the location has enough
clearance and access for the crate dimensions
listed below. This is essential for smooth
delivery, installation, and indoor movement of
the components.
Logistics & coordination
• Verify that all equipment and crate dimensions
are compatible with the delivery pathway.
• If requested, provide a brief walkthrough video
of the access route to assist with planning.
Coordinate and confirm the following:
• Applicable taxes, tariffs, and bond payments
• Power of Attorney (POA) for the customs
broker (for international shipments)
• Delivery window and designated on-site contact
• Scheduling of forklift and labor support
• Installer arrival timing
• Packaging and debris removal arrangements
Crate and debris disposal
• Equipment will be delivered in one or more
large crates with internal protective packaging.
• Plan in advance for the disposal of materials
such as wood, foam, polystyrene, bubble wrap,
and plastic film.
• If in-house disposal is not feasible, arrange for
third-party waste management services.
Crate Dimensions
ZEUGMA
PETRA
TROJAN
APEX
ATLANTIS
MEDITERRANEAN
MATRIX
1
1
1
1
2
TBD
TBD
1
1
1
1
1
2
—
—
230 cm / 90.6 in
230 cm / 90.6 in
230 cm / 90.6 in
230 cm / 90.6 in
230 cm / 90.6 in
150 cm / 59.1 in
—
—
226 cm / 89.0 in
226 cm / 89.0 in
226 cm / 89.0 in
226 cm / 89.0 in
226 cm / 89.0 in
150 cm / 59.1 in
—
—
222 cm / 87.4 in
222 cm / 87.4 in
222 cm / 87.4 in
222 cm / 87.4 in
230 cm / 90.6 in
230 cm / 90.6 in
—
—
System # of
Crates
Crate # Length (cm / in) Width (cm / in) Height (cm / in)
background
7
6. Doorway & passageway
requirements
Consider the measurements below and provide a detailed floor plan with the dimensions of your
space to ensure proper fitment.
Standard door sizes by location
Ensure your facility meets the minimum width for proper module passage. Add at least 20-50 mm
extra space for maneuverability.
Installation floor space requirements
Ensure that your facility meets these minimum space requirements for successful installation.
Our design team can prepare a layout for the hyperbaric system to adapt to your available space.
Requirement
Main Doorway Width
Passageway 1 Width
Other Door 1 Width
Stairway Width
Minimum Dimensions (Metric)
800 mm
850 mm
850 mm
1000 mm
Minimum Dimensions (Imperial)
31.5 inches
33.5 inches
33.5 inches
39.4 inches
Country
USA / Canada
UK / Ireland
Europe (General)
Australia / NZ
India / South Africa
Typical Door Width (Metric)
813-914 mm
762-838 mm
800-900 mm
820-920 mm
700-900 mm
Typical Door Width (Imperial)
32-36 inches
30-33 inches
31-35 inches
32-36 inches
28-35 inches
Hyperbaric System
ZEUGMA
ATLANTIS
MEDITERRANEAN
TROJAN
PETRA
MATRIX
MATRIX PLUS
Required space (Metric)
5500 mm x 2800 mm
4400 mm x 3000 mm
6000 mm x 3500 mm
4500 mm x 2600 mm
5500 mm x 2800 mm
5500 mm x 3000 mm
6000 mm x 3500 mm
Required space (Imperial)
18'0" x 9'2"
14'5" x 9'10"
19'8" x 11'6"
14'9" x 8'6"
18'0" x 9'2"
18'0" x 9'10"
19'8" x 11'6"
See the floor plans recommendations at the end of
this document.
background
8
7. Staff training & post-
installation
8. Electrical requirements
Consider the measurements below and provide a detailed floor plan with the dimensions of your
space to ensure proper fitment.
Requirement
Training availability
Number of trainees
Language requirement
Details
Client staff should be available post-installation for training. Confirm
if training will occur on install day or via virtual/on-site session
At least 2 persons recommended
At least one English-speaking staff member
Staff training and chamber operation
• Assign 1–2 trained users for system operation
and upkeep
• Ensure internet/Wi-Fi access for systems
requiring remote updates or support
Electrical load calculation
Each hyperbaric chamber has several components, each consuming a specific amount of power.
Power consumption per hyperbaric system
Each hyperbaric setup includes:
• 1 Main Unit
• 1 Compressor
• 1 Chiller Unit
• 1–4 Oxygen Generators (based on number
of seats)
• 2 or more Transformers (depending on
system size)
Power calculation formula
To estimate total electrical load, we’re using
the following formula:
Total Power (kW) = Electric Panel (1.0 kW)
+ Chiller Unit (1.8 kW) + (1.8 kW × number of
Oxygen Generators) + Compressor (2.7 kW)
Component
Electric Panel
Chiller Unit
Oxygen Generator
Compressor (2 HP)
Compressor (4 HP)
Compressor (6 HP)
Voltage
220V
220V
220V
220V
220V
220V
Amperage
4A
9A
8A (2.2 HP)
8A
14A
16A
Frequency
50 Hz
50 Hz
50 Hz
50 Hz
50 Hz
50 Hz
Power
1.0 kW
1.8 kW
1.8 kW
2.7 kW
2.7 kW
2.7 kW
background
9
ZEUGMA
TROJAN
PETRA
ATLANTIS
MEDITERRANEAN
GIZA
MATRIX
MATRIX PLUS
1
1
1
2
4
4
1
2
1
1
1
2
4
4
1
2
7.3
7.3
7.3
9.1
13.9
13.9
7.3
9.1
2
2
2
2
3
3
TBD
TBD
2
2
2
2
3
3
TBD
TBD
220V / 20A per plug
220V / 20A per plug
220V / 20A per plug
220V / 30A per plug
220V / 30A per plug
220V / 30A per plug
TBD
TBD
System Seats Oxygen
concentrators
Power
(KW/H)
Plugs Transformers Plug Rating
Considerations
While the power consumption calculations
provide a reliable baseline, it's important to
understand that real-world energy use may vary
slightly depending on factors like compressor
type, startup loads, and installation conditions.
For simplicity, we’ve used the same power
rating (2.7 kW) across all compressors, even
though the models (2 HP, 4 HP, 6 HP) differ in
horsepower and amperage. This standardization
helps with estimating average system load
but may not reflect the exact peak draw or
efficiency.
We recommend consulting with an electrician or
facility engineer during installation to account for:
• Local voltage fluctuations
• Startup surge currents (especially for
compressors)
• Power supply limitations or backup system sizing
This approach ensures safe and optimal
operation of your hyperbaric system — especially
in residential or mixed-use environments.
General notes:
• Position outlets within 3–5 feet (0.9–1.5 meters)
of transformers
• Place the equipment on a ventilated, stable
surface
• Confirm dedicated circuits where required
• Complete and test all electrical work before
delivery
background
10
Electrical connection types
Ensure that your facility has the appropriate electrical infrastructure to support the selected
chamber. Indicate the plug types according to your region.
Contact our team to maintain communication before, during, and after installation. They will
be your primary points of contact after acquiring your hyperbaric system.
Region
Europe
USA / Canada
UK / Ireland
Australia / New Zealand / China
India / South Africa
Switzerland / Liechtenstein
Denmark / Greenland
Italy / Chile
Mexico
Bahamas
Thailand
United Arab Emirates
Plug Type
Type C, E, F
Type A, B
Type G
Type I
Type D, M
Type J
Type K
Type L
Type A, B
Type A, B
Type A, B, C, O
Type G
Voltage / Frequency
230V / 50Hz
120V / 60Hz
230V / 50Hz
230V / 50Hz
230V / 50Hz
230V / 50Hz
230V / 50Hz
230V / 50Hz
127V / 60Hz
120V / 60Hz
220V / 50Hz
230V / 50Hz
HpoTech support team
Contact information
Role
Installation & After-Sales Manager
Installation & After-Sales Manager USA
Installation Team Member 1
Installation Team Member 2
Email
service@hpotech.com
benjamin@hpotech.com
technical.service@hpotech.com
daniel@hpotech.com
Telephone (prefix)
+905439315454
+1 (813) 690-6004
+90 533 018 76 12
+40 757 947 700
Name
Serdar GÜVEN
Benjamin WOZNIAK
Savaş TÜRELI
Daniel STAMATE
Shawn DEAN
+1 (989) 306-3253
background
11
9. Technical plans
ZEUGMA (1 seat)
621.$<,77$5ø+ø1LVDQ6DOÕ
'26<$<,621.$<'('(1ù8/((<h32ö/8
'26<$<2/8
'RV\DDGÕ
A
B
C
D
E
F
4
6
8
5(9ø=<2112
REVISION NO
7(.1L.5(6L0$d,./$0$6,
'5$:,1*'(6&5,37,21
0$/=(0(
0$7(5,$/
672..2'8
STOCK CODE
$
L0=$
SIGN
ADI - SOYADI
1$0(6851$0(
ANTET
)250$7
7$5L+
DATE
5(6L012
DRAWING NO
.21752/
&21752/
g/d(.
6&$/(
ONAY
$33529$/
dL=(1
DRAWN BY
3$5d$0217$-$',
3$57$66(0%/<1$0(
$ö,5/,..*
0$66.*

SAYFA NO
3$*(15
72/*$.$%$.
72/*$.$%$.
ù8/((<h32ö/8 
(QG6LGH0RGXOH
PP
PP
PP
NJ
PP
PP
&+$0%(5:(,*+7
ALL EQUIPMENT
aNJ
(~33.86'' )
'RRU6LGH0RGXOH
NJ
0ÕGGOH0RGXOH
NJ
aÕEV
aÕEV
aÕEV
(~12.99'' )(~7.01'' )(~78.27'' )
(~72.95'' )
'RQRWWDNHLQWRDFFRXQWWKHVFDOH
YDOXHLQWKHWHFKQLFDOGUDZLQJ
aÕEV
Modularity and chamber weight
End Side Module
178 mm
860 mm
330 mm
158 kg
1988 mm
1853 mm
CHAMBER WEIGHT
ALL EQUIPMENT
~806 kg
(~33.86'' )
Door Side Module
190 kg
Mıddle Module
348 kg
~767.21 ıbs
~348.33 ıbs
~418.88 ıbs
(~12.99'' )(~7.01'' )(~78.27'' )
(~72.95'' )
~1776.75 ıbs
background
12
ZEUGMA (1 seat)
ELECTRIC SOCKET
30A-220v-two phaze
ELECTRIC SOCKET
30A-220v-two phaze
Technical plans – electrical and installation space sizes US
background
13
>dZ/^K<d
ϯ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
>dZ/^K<d
ϭϳ<tͲϮϮϬǀ
>dZ/^K<d
ϭ<tͲϮϮϬǀ
ZEUGMA (1 seat)
Technical plans – electrical and installation space sizes EU
background
14
Cable length simulation
D
E
F
C
A
B
ZEUGMA (1 seat)
background
15
PETRA (1 seat)
Chamber weight simulation
621.$<,77$5ø+ø1LVDQ6DOÕ
'26<$<,621.$<'('(1ù8/((<h32ö/8
'26<$<2/8
'RV\DDGÕ
A
B
C
D
E
F
4
6
8
5(9ø=<2112
REVISION NO
7(.1L.5(6L0$d,./$0$6,
'5$:,1*'(6&5,37,21
0$/=(0(
0$7(5,$/
672..2'8
STOCK CODE
$
L0=$
SIGN
ADI - SOYADI
1$0(6851$0(

ANTET
)250$7
7$5L+
DATE
5(6L012
DRAWING NO
.21752/
&21752/
g/d(.
6&$/(
ONAY
$33529$/
dL=(1
DRAWN BY
3$5d$0217$-$',
3$57$66(0%/<1$0(
$ö,5/,..*
0$66.*

SAYFA NO
3$*(15
72/*$.$%$.
72/*$.$%$.
ù8/((<h32ö/8 
PP
PP
(QG/HIW6LGH0RGXOH
(QG5ÕJKW6LGH0RGXOH
NJ
0ÕGGOH0RGXOH
NJ
aÕEV
aÕEV
'RQRWWDNHLQWRDFFRXQWWKHVFDOH
YDOXHLQWKHWHFKQLFDOGUDZLQJ
PP
(~35.71' )
(~12.23'' )
NJ
aÕEV
&+$0%(5:(,*+7
ALL EQUIPMENT
aNJ
aÕEV
(~78.27'' )
PP
(~81,89" )
PP
(~12.23'' )
background
23
ATLANTIS
Chamber weight simulation
621.$<,77$5ø+ø1LVDQ6DOÕ
'26<$<,621.$<'('(1ù8/((<h32ö/8
'26<$<2/8
'RV\DDGÕ
A
B
C
D
E
F
4
6
5(9ø=<2112
REVISION NO
7(.1L.5(6L0$d,./$0$6,
'5$:,1*'(6&5,37,21
0$/=(0(
0$7(5,$/
672..2'8
STOCK CODE
$
L0=$
SIGN
ADI - SOYADI
1$0(6851$0(
ANTET
)250$7
7$5L+
DATE
5(6L012
DRAWING NO
.21752/
&21752/
g/d(.
6&$/(
ONAY
$33529$/
dL=(1
DRAWN BY
3$5d$0217$-$',
3$57$66(0%/<1$0(
$ö,5/,..*
0$66.*

SAYFA NO
3$*(15
72/*$.$%$.
72/*$.$%$.
ù8/((<h32ö/8 
PP
PP
&+$0%(5:(,*+7
ALL EQUIPMENT
aNJ
(~78.27'' )
(~72.95'' )
'RQRWWDNHLQWRDFFRXQWWKHVFDOH
YDOXHLQWKHWHFKQLFDOGUDZLQJ
PP
(~7.01'' )
PP
(~33.86'' )
PP
(~33.86'' )
PP
(~12.6'' )
(QG5ÕJKW6ÕGH0RGXOH
NJ
aÕEV
(QG/HIW6LGH0RGXOH
NJ
aÕEV
0ÕGGOH/HIW0RGXOH
NJ
aÕEV
0ÕGGOH0RGXOH
NJ
aÕEV
aÕEV
background
24
ATLANTIS (2 seats)
Technical plans – electrical and installation space sizes US
ELECTRIC SOCKET
30A-220v-two phaze
ELECTRIC SOCKET
30A-220v-two phaze
background
25
>dZ/^K<d
ϯ<tͲϮϮϬǀ
>dZ/^K<d
ϭ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
>dZ/^K<d
ϭϳ<tͲϮϮϬǀ
ATLANTIS (2 seats)
Technical plans – electrical and installation space sizes EU
background
27
MEDITERRANEAN (4 seats)
Chamber weight simulation
621.$<,77$5ø+ø1LVDQ6DOÕ
'26<$<,621.$<'('(1ù8/((<h32ö/8
'26<$<2/8
'RV\DDGÕ
A
B
C
D
E
F
4
6
8
5(9ø=<2112
REVISION NO
7(.1L.5(6L0$d,./$0$6,
'5$:,1*'(6&5,37,21
0$/=(0(
0$7(5,$/
672..2'8
STOCK CODE
$
L0=$
SIGN
ADI - SOYADI
1$0(6851$0(
ANTET
)250$7
7$5L+
DATE
5(6L012
DRAWING NO
.21752/
&21752/
g/d(.
6&$/(
ONAY
$33529$/
dL=(1
DRAWN BY
3$5d$0217$-$',
3$57$66(0%/<1$0(
$ö,5/,..*
0$66.*

SAYFA NO
3$*(15
72/*$.$%$.
72/*$.$%$.
ù8/((<h32ö/8 
PP
PP
&+$0%(5:(,*+7
ALL EQUIPMENT
aNJ
(~78.27'' )
(~72.95'' )
'RQRWWDNHLQWRDFFRXQWWKHVFDOH
YDOXHLQWKHWHFKQLFDOGUDZLQJ
aÕEV
PP
(~33.86'' )
PP
(~33.86'' )
PP
(~12.6'' )
(QG/HIW6LGH0RGXOH
NJ
aÕEV
0ÕGGOH/HIW0RGXOH
NJ
aÕEV
0ÕGGOH0RGXOH
NJ
aÕEV
PP
(~33.86'' )
0ÕGGOH5ÕJKW0RGXOH
NJ
aÕEV
PP
(~12.6'' )
(QG/HIW6LGH0RGXOH
NJ
aÕEV
Handling considerations for the MEDITERRANEAN
chamber (4 seats)
When handling the Mediterranean model, ensure
that transport and access routes account for the
dimensions of the largest component: the cover.
This part spans the length of three modules and,
although its width is less than 31.4 inches (80 cm),
its extended length can present challenges
during cornering or in confined spaces.
Careful planning is required to ensure smooth
handling and to avoid damage during movement
through narrow corridors or tight turns.
background
28
MEDITERRANEAN (4 seats)
Technical plans – electrical and installation space sizes US
ELECTRIC SOCKET
30A-220v-two phaze
ELECTRIC SOCKET
30A-220v-two phaze
ELECTRIC SOCKET
30A-220v-two phaze
ELECTRIC SOCKET
30A-220v-two phaze
background
29
>dZ/^K<d
ϱϱ<tͲϮϮϬǀ
>dZ/^K<d
ϭ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
>dZ/^K<d
ϭϳ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
>dZ/^K<d
Ϯ<tͲϮϮϬǀ
MEDITERRANEAN (4 seats)
Technical plans – electrical and installation space sizes EU
background
31
APEX (1 seat, hypobaric)
Chamber weight simulation
621.$<,77$5ø+ø1LVDQ6DOÕ
'26<$<,621.$<'('(1ù8/((<h32ö/8
'26<$<2/8
'RV\DDGÕ
A
B
C
D
E
F
4
6
8
5(9ø=<2112
REVISION NO
7(.1L.5(6L0$d,./$0$6,
'5$:,1*'(6&5,37,21
0$/=(0(
0$7(5,$/
672..2'8
STOCK CODE
$
L0=$
SIGN
ADI - SOYADI
1$0(6851$0(
ANTET
)250$7
7$5L+
DATE
5(6L012
DRAWING NO
.21752/
&21752/
g/d(.
6&$/(
ONAY
$33529$/
dL=(1
DRAWN BY
3$5d$0217$-$',
3$57$66(0%/<1$0(
$ö,5/,..*
0$66.*

SAYFA NO
3$*(15
72/*$.$%$.
72/*$.$%$.
ù8/((<h32ö/8 
'RQRWWDNHLQWRDFFRXQWWKHVFDOH
YDOXHLQWKHWHFKQLFDOGUDZLQJ
PP
PP
(~45.16'' )
(~42.40'' )
8SVLGH
NJ
aÕEV
'RZQVLGH
NJ
aÕEV
&+$0%(5:(,*+7
ALL EQUIPMENT
aNJ
aÕEV

Specifications

HPO Tech HPOT-HC-ATL Questions and Answers

Questions and Answers

Related Products