
Form No. 3477-988 Rev A
High-Speed or High-T orque
T rencher Head
Compact T ool Carrier
Model No. 22473 —Serial No. 404310000 and Up
Model No. 22474 —Serial No. 404200000 and Up
Register at www .T oro.com.
Original Instructions (EN)
*3477-988*

This product complies with all relevant European
directives. For details, please see the Declaration of
Incorporation (DOI) at the back of this publication.
W ARNING
CALIFORNIA
Proposition 65 W arning
Use of this product may cause exposure
to chemicals known to the State of
California to cause cancer , birth defects,
or other reproductive harm.
Introduction
The trencher head attachment is intended to be used
on a T oro compact tool carrier with a variety of booms
and chains. It is designed primarily to dig trenches in
soil to facilitate the burying of cabling and piping. It
not intended for use in cutting hard materials such as
wood or concrete. Using this product for purposes
other than its intended use could prove dangerous
to you and bystanders. Do not modify the machine
or attachments.
This attachment should be operated, serviced,
and repaired only by professionals familiar with its
characteristics and acquainted with the relevant safety
procedures.
Operate this attachment in ambient temperatures from
-18 to 38°C (0 to 100 °F). Contact your Authorized
Service Dealer for provisions required for operating
in extreme temperatures.
Read this information carefully to learn how to operate
and maintain your product properly and to avoid
injury and product damage. Y ou are responsible for
operating the product properly and safely .
V isit www .T oro.com for product safety and operation
training materials, accessory information, help nding
a dealer , or to register your product.
Whenever you need service, genuine T oro parts, or
additional information, contact an Authorized Service
Dealer or T oro Customer Service and have the model
and serial numbers of your product ready . Figure 1
identies the location of the model and serial numbers
on the product. W rite the numbers in the space
provided.
Important: W ith your mobile device, you can
scan the QR code on the serial number decal (if
equipped) to access warranty , parts, and other
product information.
g244478
Figure 1
1. Model and serial number location
Model No.
Serial No.
This manual identies potential hazards and has
safety messages identied by the safety-alert symbol
( Figure 2 ), which signals a hazard that may cause
serious injury or death if you do not follow the
recommended precautions.
g000502
Figure 2
1. Safety-alert symbol
This manual uses 2 words to highlight information.
Important calls attention to special mechanical
information and Note emphasizes general information
worthy of special attention.
© 2025—The T oro® Company
81 1 1 L yndale A venue South
Bloomington, MN 55420
2
Contact us at www .T oro.com.
Printed in the USA
All Rights Reserved

Contents
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
General Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Slope Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
T rencher Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Maintenance and Storage Safety . . . . . . . . . . . . . . . . . . . . . . . . 4
Safety and Instructional Decals . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1 Installing the Boom and Digging
Chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2 Installing the Safety-Bar Extension . . . . . . . . . . . . . . . . . . . 8
3 Installing the Crumber-Extension
Bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4 Installing the Spoils Auger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5 Checking the Bearing Case Lube
Level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Product Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Specications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1
Installing and Removing the Attachment . . . . . . . . . . . . 1 1
Digging a T rench . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1
Of fsetting the T rencher . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
T ransport Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
T ransporting the T rencher on a T railer . . . . . . . . . . . . . . 13
Operating T ips . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Recommended Maintenance Schedule(s) . . . . . . . . . . . 14
Greasing the T rencher . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Servicing the Bearing Case Lube . . . . . . . . . . . . . . . . . . . . . . 15
Adjusting the Digging Chain T ension . . . . . . . . . . . . . . . . . 15
Flipping a W orn Boom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Replacing the Digging T eeth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Replacing the Drive Sprocket . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Safety
DANGER
There may be buried utility lines in the work
area. Digging into them may cause a shock
or an explosion.
Have the property or work area marked for
buried lines and do not dig in marked areas.
Contact your local marking service or utility
company to have the property marked (for
example, in the US, call 81 1 or in Australia,
call 1 100 for the nationwide marking service).
General Safety
Always follow all safety instructions to avoid serious
injury or death.
• Do not exceed the rated operating capacity , as the
machine may become unstable, which may result
in loss of control.
• Do not transport an attachment with the arms
raised or extended (if applicable) . Always
transport the attachment close to the ground; refer
to T ransport Position ( page 13 ) .
• Have the property or work area marked for buried
lines and other objects, and do not dig in marked
areas.
• Read and understand the content of this Operator ’ s
Manual before starting the machine.
• Use your full attention while operating the
machine. Do not engage in any activity that
causes distractions; otherwise, injury or property
damage may occur .
• Never allow children or untrained people to
operate the machine.
• Keep your hands and feet away from the moving
components and attachments.
• Do not operate the machine without the guards
and other safety protective devices in place and
working on the machine.
• Keep bystanders and pets away from the machine.
• Stop the machine, shut of f the machine, and
remove the key before servicing, fueling, or
unclogging the machine.
Improperly using or maintaining this machine can
result in injury . T o reduce the potential for injury ,
comply with these safety instructions and always
pay attention to the safety-alert symbol , which
means Caution, W arning, or Danger—personal safety
instruction. Failure to comply with these instructions
may result in personal injury or death.
3

Slope Safety
• Operate the machine up and down slopes with
the heavy end of the machine uphill. W eight
distribution changes with attachments. This
attachment makes the front of machine the heavy
end.
• Raising or extending (if applicable) the loader arms
on a slope af fects the stability of the machine.
Keep the loader arms in the lowered and retracted
position when on slopes..
• Slopes are a major factor related to loss of control
and tip-over accidents, which can result in severe
injury or death. Operating the machine on any
slope or uneven terrain requires extra caution.
• Establish your own procedures and rules for
operating on slopes. These procedures must
include surveying the site to determine which
slopes are safe for machine operation. Always
use common sense and good judgment when
performing this survey .
• Slow down and use extra care on hillsides. Ground
conditions can af fect the stability of the machine.
• A void starting or stopping on a slope. If the
machine loses traction, proceed slowly , straight
down the slope.
• A void turning on slopes. If you must turn, turn
slowly and keep the heavy end of the machine
uphill.
• Keep all movements on slopes slow and gradual.
Do not make sudden changes in speed or
direction.
• If you feel uneasy operating the machine on a
slope, do not do it.
• W atch for holes, ruts, or bumps, as uneven terrain
could overturn the machine. T all grass can hide
obstacles.
• Use caution when operating on wet surfaces.
Reduced traction could cause sliding.
• Evaluate the area to ensure that the ground is
stable enough to support the machine.
• Use caution when operating the machine near the
following:
– Drop-of fs
– Ditches
– Embankments
– Bodies of water
The machine could suddenly roll over if a track
goes over the edge or the edge caves in. Maintain
a safe distance between the machine and any
hazard.
• Do not remove or add attachments on a slope.
• Do not park the machine on a hillside or slope.
T rencher Safety
• Keep your hands, feet, and any other part of your
body or clothing away from moving teeth, auger ,
or other parts.
• For wheeled traction units, use the counterweight
on the traction unit when using the attachment.
• Use a safety-bar extension on a boom over 61 cm
(2 ft).
• Look behind and down before backing up to
ensure that the path is clear .
• Stop the digging chain when you are not digging.
• Always lower the attachment and shut of f the
machine each time you leave the operating
position.
• Clean soil from the trencher before transporting it.
Maintenance and Storage
Safety
• Check fasteners at frequent intervals for proper
tightness to ensure that the equipment is in safe
operating condition.
• Refer to this Operator ’ s Manual for important
details if you store the attachment for an extended
period of time.
• Maintain or replace safety and instruction labels,
as necessary .
4

Safety and Instructional Decals
Safety decals and instructions are easily visible to the operator and are located near any area
of potential danger . Replace any decal that is damaged or missing.
g570152
Figure 3
Safety Decal Locations
1. 99-9952 3. 1 15-1497
2. 133-8061
decal99-9952
99-9952
1. Cutting/dismemberment hazard, auger and chain—keep bystanders away; stay away from moving parts.
2. W arning—remove the key before performing maintenance.
3. Explosion hazard; electrical shock hazard—do not operate if power lines may be present.
decal99-9953
99-9953
1. Explosion and/or electric shock hazard—do not dig in areas with buried gas or power lines.
5

decal1 15-1497
1 15-1497
1. Crushing hazard of hand; crushing hazard of foot—keep
bystanders away from the machine; keep away from
moving parts.
decal133-8061
133-8061
6

Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure Description
Qty .
Use
Boom assembly (sold separately)
1
1
Chain assembly (sold separately)
1
Install the boom and digging chain.
Safety-bar extension—supplied with the
boom (sold separately)
1
Bolts—supplied with the boom (sold
separately)
2
2
Locknuts—supplied with the boom (sold
separately)
2
Install the safety-bar extension
(trenchers without a crumber attachment
only).
Crumber-extension bar—supplied with
the boom (sold separately)
1
Bolts—supplied with the boom (sold
separately)
2
3
Locknuts—supplied with the boom (sold
separately)
2
Install the crumber-extension bar
(trenchers with a crumber attachment
only).
4
No parts required
–
Install the spoils auger .
5
No parts required
–
Check the bearing case lube level.
1
Installing the Boom and
Digging Chain
Parts needed for this procedure:
1
Boom assembly (sold separately)
1
Chain assembly (sold separately)
Procedure
1. Raise the trencher about 15 cm (6 inches) of f
the ground.
2. Shut of f the engine and remove the key .
3. Remove the bolt and nut securing the spoils
auger and remove the auger ( Figure 4 ).
Note: Retain the bolts and nuts for installation
later .
g244576
Figure 4
1. Locknut (1/2 inch)
6. Adjusting bolt
2. Spoils auger
7. Jam nut
3. Bolt (1/2 x 3-3/4 inches) 8. Nut (5/8 inch)
4. Bolt (5/8 x 3-1/2 inches)
9. Double washer
5. Boom 10. Drive sprocket
4. Remove the 2 bolts (5/8 x 3-1/2 inches), 2 nuts
(5/8 inch), and 2 double washers from the sides
of the boom ( Figure 4 ).
5. Loosen the adjusting bolt and jam nut ( Figure 4 ).
7

6. Slide the boom over the arm on the drive head.
7. Install the bolts, nuts, and double washers
removed previously from the boom, but do not
tighten them.
8. If the chain is not connected, connect the links
by pressing or hammering the clevis pin supplied
with the chain through the links.
Important: T o avoid bending the chain links,
place blocks under and between the links
when hammering the clevis pin.
9. Secure the clevis pin with the cotter pin supplied
with the chain.
10. Loop the digging chain over the auger drive shaft
and onto the drive sprocket, ensuring that the
digging teeth point forward on the upper span.
1 1. Set the upper span of the chain into place on
the trencher boom, then wrap the chain around
the roller at the end of the boom.
12. Thread the adjustment bolt into the boom and
turn it in until there is 3.8 to 6.3 cm (1-1/2 to 2-1/2
inches) of slack in the chain on the bottom span.
13. Thread the jam nut down the adjusting bolt and
tighten it securely against the boom.
14. T orque the 2 bolts and nuts securing the boom
to 183 to 223 N∙m (135 to 165 ft-lb).
2
Installing the Safety-Bar
Extension
T renchers without a Crumber
Attachment Only
Parts needed for this procedure:
1
Safety-bar extension—supplied with the boom (sold
separately)
2
Bolts—supplied with the boom (sold separately)
2
Locknuts—supplied with the boom (sold separately)
Procedure
Install the safety-bar extension (supplied with the
boom) over the end of the safety-rail assembly and
secure it using the 2 bolts and locknuts.
g569916
Figure 5
Safety-bar extension for 91 cm (3 ft) boom shown.
1. Bolt—1/2 x 3 inch (2) 3. Safety-bar extension
2. Nut—1/2 inch (2)
8

3
Installing the
Crumber-Extension Bar
T renchers with a Crumber
Attachment Only
Parts needed for this procedure:
1
Crumber-extension bar—supplied with the boom (sold
separately)
2
Bolts—supplied with the boom (sold separately)
2
Locknuts—supplied with the boom (sold separately)
Procedure
Install the crumber-extension bar (supplied with the
boom) over the end of the safety-rail assembly and
secure it using the 2 bolts and locknuts.
g244620
Figure 6
Crumber-extension bar for 91 cm (3 ft) boom shown.
1. Bolt—1/2 x 3 inch (2) 3. Crumber-extension bar
2. Nut—1/2 inch (2)
4
Installing the Spoils Auger
No Parts Required
Procedure
Before operating the trencher , install and position the
spoils auger to work correctly with the digging chain
conguration you are using. If you do not position the
spoils auger correctly , you could damage the trencher .
1. Use the bolt and nut removed from the auger
previously to secure it in the correct holes, as
described in the following list:
Note: Refer to ( Figure 7 ) when performing this
procedure.
• 10 cm (4 inch) chain conguration
Using the hole closest to the auger blade in
the end of the auger with 2 holes, connect
the auger to the inner hole on the shaft.
• 15 cm (6 inch) chain conguration
Using the hole farthest from the auger blade
in the end of the auger with 2 holes, connect
the auger to the inner hole on the shaft.
• 20 cm (8 inch) chain conguration
Using the end of the auger with 1 hole,
connect the auger to the inner hole on the
shaft.
• 25 or 30 cm (12 inch) chain conguration
Using the end of the auger with 1 hole,
connect the auger to the outer hole on the
shaft.
9

g414078
Figure 7
1. Auger
4. Connect these holes for a
20 cm (8 inch) chain.
2. Connect these holes for a
10 cm (4 inch) chain.
5. Connect these holes for a
30 cm (12 inch) chain.
3. Connect these holes for a
15 cm (6 inch) chain.
2. T orque the bolt and nut to 101 N∙m (75 ft-lb).
5
Checking the Bearing Case
Lube Level
No Parts Required
Procedure
Before operating the trencher , check to ensure that
the bearing case is lled with gear lube; refer to
Checking the Bearing Case Lube Level ( page 15 ) .
Product Overview
Specications
Note: Specications and design are subject to
change without notice.
Width, with 91 cm (3 ft) boom 89 cm (35 inches)
Length, with 91 cm (3 ft) boom 165 cm (65 inches)
Height, with 91 cm (3 ft) boom 61 cm (24 inches)
W eight, with 91 cm (3 ft) boom 177 kg (390 lb)
Maximum trench depth, with
61 cm (2 ft) boom
61 cm (24 inches) at a 65
degree boom angle
Maximum trench depth, with
91 cm (3 ft) boom
91 cm (36 inches) at a 65
degree boom angle
Maximum trench depth, with
122 cm (4 ft) boom
122 cm (48 inches) at a 65
degree boom angle
T o ensure optimum performance and continued safety
certication of the machine, use only genuine T oro
replacement parts and accessories. Replacement
parts and accessories made by other manufacturers
could be dangerous, and such use could void the
product warranty .
10

Operation
Determine the left and right sides of the machine from
the normal operating position.
Installing and Removing
the Attachment
Refer to the Operator ’ s Manual for the traction unit for
the installation and removal procedure.
Important: Before installing the attachment,
position the machine on a level surface, ensure
that the mount plates are free of any dirt or debris,
and ensure that the pins move freely . If the pins
do not move freely , grease them.
Note: Always use the traction unit to lift and move
the attachment.
W ARNING
If you do not fully seat the quick-attach
pins through the attachment mount plate,
the attachment could fall off the machine,
crushing you or bystanders.
Ensure that the quick-attach pins are fully
seated in the attachment mount plate.
W ARNING
Hydraulic uid escaping under pressure can
penetrate skin and cause injury . Fluid injected
into the skin must be surgically removed
within a few hours by a doctor familiar with
this form of injury; otherwise, gangrene may
result.
• Ensure that all hydraulic-uid hoses
and lines are in good condition and all
hydraulic connections and ttings are tight
before applying pressure to the hydraulic
system.
• Keep your body and hands away from
pinhole leaks or nozzles that eject
high-pressure hydraulic uid.
• Use cardboard or paper to nd hydraulic
leaks; never use your hands.
CAUTION
Hydraulic couplers, hydraulic lines/valves,
and hydraulic uid may be hot. If you contact
hot components, you may be burned.
• W ear gloves when disconnecting the
hydraulic couplers.
• Allow the machine to cool before touching
hydraulic components.
• Do not touch hydraulic uid spills.
Digging a T rench
1. If your traction unit has a speed selector , set it to
the S LOW (turtle) position, then start the engine.
2. Pull the auxiliary hydraulics lever to the operator
grip to engage the trencher .
3. Slowly lower the trencher to the ground so that
the boom and chain are parallel to the ground.
4. Begin inserting the nose of the boom and chain
into the ground by slowly raising the trencher a
few centimeters (inches) of f the ground while
tilting the nose down into the ground gradually .
5. Once the trencher boom is in the ground at a 45
to 60 degree angle, slowly lower the trencher
until the spoils auger is just above the ground.
6. Ensure that all parts of the trencher are
functioning correctly .
7. Slowly move the traction unit rearward to extend
the trench.
Note: If you move too fast, the trencher will stall.
If it stalls, raise it slightly , slowly drive forward, or
reverse the chain direction momentarily .
8. When nished, raise the trencher and boom out
of the trench by tilting the attachment rearward,
then stop the trencher by moving the auxiliary
hydraulics lever into neutral.
1 1

Offsetting the T rencher
Y ou can move the trencher to the right side of the
trencher frame to allow you to trench close to buildings
and other obstacles.
1. Lower the trencher to the ground, engage the
parking brake (if equipped), shut of f the engine,
and remove the key .
2. Disconnect the hydraulic lines from the trencher .
W ARNING
Hydraulic uid escaping under pressure
can penetrate skin and cause injury .
Fluid injected into the skin must be
surgically removed within a few hours by
a doctor familiar with this form of injury;
otherwise, gangrene may result.
• Keep your body and hands away from
pinhole leaks or nozzles that eject
high-pressure hydraulic uid.
• Use cardboard or paper to nd
hydraulic leaks; never use your
hands.
3. Remove the 6 bolts securing the trencher head
to the frame ( Figure 8 ).
g244771
Figure 8
Safety-rail assembly not shown
1. Bolt (6) 2. Left hose guide
4. Move the frame to the left, aligning the holes in
the right side of the frame with those in the head.
5. Attach the head to the frame with the 6 bolts
removed previously ( Figure 9 ).
g244770
Figure 9
Safety-rail assembly not shown
1. Bolt (6)
6. T orque the bolts to 257 to 31 1 N∙m (190 to 230
ft-lb).
7. Remove the bolt (5/8 x 3 inches), 2 bolts (5/8
x 4 inches), 3 washers, and 3 nuts from the
safety-rail assembly and remove the assembly .
8. Remove the 2 bolts (5/8 x 3 inches), 2 washers,
and 2 nuts securing the right side of the upper
frame and move them to the corresponding
holes on the left ( Figure 10 ).
g244769
Figure 10
1. Bolt—5/8 x 4 inches (2) 4. Safety-rail assembly
2. W asher (5) 5. Bolt—5/8 x 3 inches (3)
3. Nut (5)
9. Install the safety-rail assembly over the trencher
chain using the 3 bolts, washers, and ange
nuts removed previously ( Figure 10 ).
10. T orque all 5 bolts and nuts to 257 to 31 1 N∙m
(190 to 230 ft-lb).
1 1. Move the hoses from the hose guide on top of
the trencher to the hose guide on the left side
( Figure 8 ).
12

T ransport Position
When transporting the attachment, keep it as close
to the ground as possible, no more than 15 cm (6
inches) above the ground. T ilt it rearward.
g245257
Figure 1 1
1. No more than 15 cm (6
inches) above the ground
2. T ilt the attachment
rearward.
T ransporting the T rencher
on a T railer
Place the trencher on a trailer or truck capable of
carrying it. Securely tie the trencher to the trailer or
truck using tie straps appropriate for the weight of the
trencher and for highway use.
Operating T ips
• Clean the area of trash, branches, and rocks
before trenching to prevent equipment damage.
• Always begin trenching with the slowest ground
speed possible. Increase speed if conditions
permit.
• Always use full throttle (maximum engine speed)
when trenching.
• Always trench backward (i.e., in reverse).
• Never transport the trencher with the loader arms
raised. Keep the arms lowered and the trencher
tilted up.
• When trenching, the spoils auger should just clear
the original ground surface to obtain maximum soil
removal.
• T rench at a 45 to 60 degree angle for best results.
• T o dig a trench faster , control the depth with
periodic adjustments of the loader arms.
• If your traction unit has a speed selector , set it to
the S LOW (turtle) position.
• If your traction unit has a ow divider (present
on some wheeled traction units), adjust it to
approximately the 10 o’clock position.
• If the trencher binds in the soil, push the auxiliary
hydraulics lever fully forward to reverse the chain
direction. Once the chain is loose, pull the lever
rearward again and continue trenching.
• If you need the nished trench to be cleaner
than what is possible with the trencher , you
can purchase a crumber from your dealer . The
crumber mounts onto the trencher and scrapes the
trench clean as you run the trencher .
• T o improve the quality of trenches less than 61 cm
(24 inches) deep, use a 61 cm (24 inch) boom on
the trencher .
13

Maintenance
Recommended Maintenance Schedule(s)
Maintenance Service
Interval
Maintenance Procedure
Before each use or daily
• Grease the trencher .
• Inspect the boom for wear .
Every 25 hours
• Check the gear-lube level.
• Adjust the digging chain tension.
• Inspect the boom for wear .
Every 200 hours
• Change the gear lube.
Before storage
• Grease the trencher .
• Check the gear-lube level.
CAUTION
If you leave the key in the switch, someone could accidently start the engine and seriously
injure you or other bystanders.
Remove the key from the switch before you perform any maintenance.
Greasing the T rencher
Service Interval : Before each use or daily
Before storage
Grease 2 ttings, as shown in Figure 12 and Figure
13 , every day and immediately after every washing.
Grease T ype: General-purpose grease
1. Park the machine on a level surface, disengage
the auxiliary hydraulics lever , lower the
attachment, and engage the parking brake (if
equipped).
2. Shut of f the engine and remove the key
3. Clean the grease ttings with a rag.
4. Connect a grease gun to each tting.
5. Pump grease into the ttings until grease begins
to ooze out of the bearings.
6. Wipe up any excess grease.
g244994
Figure 12
g244995
Figure 13
14

Servicing the Bearing Case
Lube
Service Interval : Every 25 hours —Check the
gear-lube level.
Every 200 hours —Change the gear lube.
Before storage —Check the gear-lube level.
Checking the Bearing Case Lube
Level
Gear lube type: SAE 90-140 API service GL-4 or GL-5
Capacity: 0.5 L (17 oz)
1. Park the machine on a level surface, disengage
the auxiliary hydraulics lever , lower the
attachment, and engage the parking brake (if
equipped).
2. T ilt the trencher so that the boom is parallel with
the ground.
3. Shut of f the engine and remove the key
4. Clean the area around the ll-hole plug on the
bearing case ( Figure 14 ).
g244664
Figure 14
1. Fill-hole plug on the bearing case
5. Remove the plug from the ll hole ( Figure 14 ).
6. Look in the hole and check the level of gear lube
in the bearing case.
Note: The level should be up to the bottom of
the hole; if it is not, add gear lube.
7. Replace the plug and torque it to 20 to 23 N∙m
(15 to 17 ft-lb).
Changing the Gear Lube
1. Park the machine on a level surface, disengage
the auxiliary hydraulics lever , lower the
attachment, and engage the parking brake (if
equipped).
2. Shut of f the engine and remove the key
3. Clean the area around the ll-hole plug on the
bearing case ( Figure 14 ).
4. Remove the plug from the ll hole ( Figure 14 ).
5. Lift the trencher until the boom is vertical,
draining the lube through the ll hole and into a
pan.
6. Return the trencher to the ground.
7. Fill the bearing case with gear lube until it comes
out of the ll hole.
8. Replace the plug and torque it to 20 to 23 N∙m
(15 to 17 ft-lb).
Adjusting the Digging
Chain T ension
Service Interval : Every 25 hours —Adjust the digging
chain tension.
With the trencher parallel to the ground, ensure that
there is 3.8 to 6.3 cm (1-1/2 to 2-1/2 inches) between
the bottom of the boom and the top of the bottom
chain span. If not, adjust the chain using the following
procedure:
Important: Do not overtighten the chain. Excess
chain tension may damage drive components.
1. Park the machine on a level surface, disengage
the auxiliary hydraulics lever , lower the
attachment, and tilt it so that the boom is parallel
with the ground. Engage the parking brake (if
equipped).
2. Shut of f the engine and remove the key
3. Loosen the 2 bolts and nuts securing the boom
to the trencher arm ( Figure 4 ).
4. Loosen the jam nut securing the adjustment bolt
( Figure 4 ).
5. T urn the adjustment bolt in or out as needed to
achieve the desired tension.
6. T ighten the jam nut.
7. T orque the 2 bolts and nuts securing the boom
to 183 to 223 N∙m (135 to 165 ft-lb).
15

Flipping a W orn Boom
Service Interval : Every 25 hours —Inspect the boom
for wear .
Inspect the bottom of the boom for wear , if it is worn,
complete the following:
Note: If you have already ipped the boom once,
replace the boom when both sides are worn.
1. Park the machine on a level surface, disengage
the auxiliary hydraulics lever , lower the
attachment, and engage the parking brake (if
equipped).
2. Shut of f the engine and remove the key
3. Remove the 2 bolts and nuts securing the boom
to the trencher arm ( Figure 4 ).
4. Loosen the jam nut on the adjusting bolt in the
boom ( Figure 4 ).
5. Loosen the adjusting bolt until you can remove
the chain from the boom ( Figure 4 ).
6. Remove the chain from the drive sprocket and
boom.
7. Remove the boom, ip it over so the bottom
becomes the top (or if you have already ipped
it once, replace it), and install the boom again.
8. Replace the nuts, bolts, and washers securing
the boom.
9. Install the chain over the drive sprocket and
front roller .
10. Adjust the chain tension; refer to Adjusting the
Digging Chain T ension ( page 15 ) .
Replacing the Digging
T eeth
Service Interval : Before each use or daily —Inspect
the boom for wear .
Due to the high amount of wear placed on the digging
teeth, you need to replace them periodically .
T o replace a single tooth, remove the bolts and nuts
securing the tooth to remove it, then install a new
tooth in the same position. T orque the bolts securing
the teeth to 37 to 45 N∙m (27 to 33 ft-lb).
g245068
Figure 15
1. Nut 3. Nut
2. T ooth
Replacing the Drive
Sprocket
Over time, the drive sprocket will wear , especially
when used in sandy or clay soils. When this happens,
the digging chain will begin to slip. If the chain slips,
replace the drive sprocket as follows:
1. Park the machine on a level surface, disengage
the auxiliary hydraulics lever , lower the
attachment, and engage the parking brake (if
equipped).
2. Raise the trencher a few centimeters (inches)
above the ground.
3. Shut of f the engine and remove the key
4. Remove the spoils auger ( Figure 16 ).
g244973
Figure 16
1. Spoils auger
3. Bolts
2. Drive sprocket
16

5. Loosen the 2 bolts and nuts securing the boom
to the trencher arm ( Figure 4 ).
6. Loosen the jam nut on the adjusting bolt in the
boom ( Figure 4 ).
7. Loosen the adjusting bolt until you can remove
the chain from the boom ( Figure 4 ).
8. Remove the chain from the drive sprocket.
9. Remove the 6 bolts securing the drive sprocket
( Figure 16 ).
10. Remove and discard the drive sprocket ( Figure
16 ).
1 1. Clean the sprocket mounting surface on the
trencher .
12. Slide the new sprocket onto the shaft as
illustrated in ( Figure 16 ).
Important: The arrow on the sprocket face
should be visible from the right side of the
trencher and should point in a clockwise
direction; if not, turn the sprocket around.
13. Thread the 6 bolts into the sprocket nger tight
( Figure 16 ).
14. Slowly begin tightening the bolts progressing
around the sprocket until all bolts are torqued to
129 to 155 N∙m (95 to 1 15 ft-lb).
Important: T ighten each bolt only half way
rst, working your way around the 6 bolts,
then return to each bolt in turn and torque
them to the specications given in step 13.
15. Loop the chain over the auger drive shaft and
onto the drive sprocket, ensuring that the teeth
point forward on the upper span.
16. Set the upper span of the chain into place on
the trencher boom, then wrap the chain around
the roller at the end of the boom.
17. Thread the adjustment bolt into the boom and
turn it in until there is 3.8 to 6.3 cm (1-1/2 to 2-1/2
inches) of slack in the chain on the bottom span.
18. Thread the jam nut down the adjusting bolt and
tighten it securely against the boom.
19. T orque the 2 bolts and nuts securing the boom
to 183 to 223 N∙m (135 to 165 ft-lb).
20. Install the spoils auger; refer to 4 Installing the
Spoils Auger ( page 9 ) .
Storage
1. Before long term storage, brush the dirt from the
attachment.
2. Check the condition of the digging chain. Adjust
the digging chain tension; refer to Adjusting the
Digging Chain T ension ( page 15 ) . Replace any
worn or damaged teeth; refer to Replacing the
Digging T eeth ( page 16 ) .
3. Grease the trencher; refer to Greasing the
T rencher ( page 14 )
4. Check bearing case lube level; refer to Checking
the Bearing Case Lube Level ( page 15 ) .
5. Check and tighten all bolts, nuts, and screws.
Repair or replace any part that is damaged or
worn.
6. Ensure that all hydraulic couplers are connected
together to prevent contamination of the
hydraulic system.
7. Paint all scratched or bare metal surfaces. Paint
is available from your Authorized Service Dealer .
8. Store the trencher in a clean, dry garage or
storage area. Cover the trencher to protect it
and keep it clean.
17

Declaration of Incorporation
The T oro Company , 81 1 1 L yndale A venue South, Bloomington, MN, USA declares that the following unit(s)
conform(s) to the directives listed, when installed in accordance with the accompanying instructions onto certain
T oro models as indicated on the relevant Declarations of Conformity .
Model No.
Serial No.
Product Description Invoice Description
General Description
Directive
22473 404310000 and Up High-T orque T rencher Head
HIGH T ORQUE TRENCHER
HEAD
T rencher
2006/42/EC
22474 404200000 and Up
High-Speed T rencher Head
HIGH SPEED TRENCHER
HEAD
T rencher
2006/42/EC
Relevant technical documentation has been compiled as required per Part B of Annex VII of 2006/42/EC.
W e will undertake to transmit, in response to requests by national authorities, relevant information on this partly
completed machinery . The method of transmission shall be electronic transmittal.
This machinery shall not be put into service until incorporated into approved T oro models as indicated on the
associated Declaration of Conformity and in accordance with all instructions, whereby it can be declared in
conformity with all relevant Directives.
Certied:
Authorized Representative:
Marcel Dutrieux
Manager European Product Integrity
T oro Europe NV
Nijverheidsstraat 5
2260 Oevel
Belgium
Chad Moe
Sr . Engineering Manager
81 1 1 L yndale A ve. South
Bloomington, MN 55420, USA
October 16, 2025

UK Declaration of Incorporation
The T oro Company , 81 1 1 L yndale A venue South, Bloomington, MN, USA declares that the following unit(s)
conform(s) to the directives listed, when installed in accordance with the accompanying instructions onto certain
T oro models as indicated on the relevant Declarations of Conformity .
Model No.
Serial No.
Product Description Invoice Description
General Description
Regulation
22473 404310000 and Up High-T orque T rencher Head
HIGH T ORQUE TRENCHER
HEAD
T rencher
S.I. 2008 No.
1597
22474 404200000 and Up
High-Speed T rencher Head
HIGH SPEED TRENCHER
HEAD
T rencher
S.I. 2008 No.
1597
Relevant technical documentation has been compiled as required per Schedule 10 of S.I. 2008 No. 1597.
W e will undertake to transmit, in response to requests by national authorities, relevant information on this partly
completed machinery . The method of transmission shall be electronic transmittal.
This machinery shall not be put into service until incorporated into approved T oro models as indicated on the
associated Declaration of Conformity and in accordance with all instructions, whereby it can be declared in
conformity with all relevant Directives.
This declaration has been issued under the sole responsibility of the manufacturer .
The object of the declaration is in conformity with relevant UK legislation.
Authorized Representative:
Marcel Dutrieux
Manager European Product Integrity
T oro U.K. Limited
Spellbrook Lane W est
Bishop's Stortford
CM23 4BU
United Kingdom
Chad Moe
Sr . Engineering Manager
81 1 1 L yndale A ve. South
Bloomington, MN 55420, USA
October 16, 2025

California Proposition 65 W arning Information
What is this warning?
Y ou may see a product for sale that has a warning label like the following:
W ARNING: Cancer and Reproductive Harm—www .p65W arnings.ca.gov .
What is Prop 65?
Prop 65 applies to any company operating in California, selling products in California, or manufacturing products that may be sold in or brought into
California. It mandates that the Governor of California maintain and publish a list of chemicals known to cause cancer , birth defects, and/or other
reproductive harm. The list, which is updated annually , includes hundreds of chemicals found in many everyday items. The purpose of Prop 65 is to
inform the public about exposure to these chemicals.
Prop 65 does not ban the sale of products containing these chemicals but instead requires warnings on any product, product packaging, or literature with
the product. Moreover , a Prop 65 warning does not mean that a product is in violation of any product safety standards or requirements. In fact, the
California government has claried that a Prop 65 warning “is not the same as a regulatory decision that a product is ‘safe’ or ‘unsafe.’” Many of these
chemicals have been used in everyday products for years without documented harm. For more information, go to https://oag.ca.gov/prop65/faqs-view-all .
A Prop 65 warning means that a company has either (1) evaluated the exposure and has concluded that it exceeds the “no signicant risk level”; or (2)
has chosen to provide a warning based on its understanding about the presence of a listed chemical without attempting to evaluate the exposure.
Does this law apply everywhere?
Prop 65 warnings are required under California law only . These warnings are seen throughout California in a wide range of settings, including but not
limited to restaurants, grocery stores, hotels, schools, and hospitals, and on a wide variety of products. Additionally , some online and mail order
retailers provide Prop 65 warnings on their websites or in catalogs.
How do the California warnings compare to federal limits?
Prop 65 standards are often more stringent than federal and international standards. There are various substances that require a Prop 65 warning
at levels that are far lower than federal action limits. For example, the Prop 65 standard for warnings for lead is 0.5 μg/day , which is well below
the federal and international standards.
Why don’t all similar products carry the warning?
• Products sold in California require Prop 65 labelling while similar products sold elsewhere do not.
• A company involved in a Prop 65 lawsuit reaching a settlement may be required to use Prop 65 warnings for its products, but other companies
making similar products may have no such requirement.
• The enforcement of Prop 65 is inconsistent.
• Companies may elect not to provide warnings because they conclude that they are not required to do so under Prop 65; a lack of warnings for a
product does not mean that the product is free of listed chemicals at similar levels.
Why does T oro include this warning?
T oro has chosen to provide consumers with as much information as possible so that they can make informed decisions about the products they buy and
use. T oro provides warnings in certain cases based on its knowledge of the presence of one or more listed chemicals without evaluating the level of
exposure, as not all the listed chemicals provide exposure limit requirements. While the exposure from T oro products may be negligible or well within the
“no signicant risk” range, out of an abundance of caution, T oro has elected to provide the Prop 65 warnings. Moreover , if T oro does not provide these
warnings, it could be sued by the State of California or by private parties seeking to enforce Prop 65 and subject to substantial penalties.
Rev A
