Goodman GR9T960804CN GR9T96 Gas Furnace 96% AFUE Two-Stage Upflow/Horizontal

Product's Documents

Below are documents related to this product, you can read online or download:
Installation Instruction Other Documents
GR9T960804CN photo

Installation Guide

This is the main product document for model GR9T960804CN.

The file format is pdf, 56 pages, you can download this manual here .

background
*R9T96 & *D9T96
Two-Stage Gas Furnaces
(Type FSP CATEGORY IV Direct
or Non Direct Vent Air Furnace)
(Type FSP CATÉGORIE IV Direct
ou four á air sou󰀪י non direct)
INSTALLER: Ax all manuals adjacent to the unit.
As a professional installer you have an obligation to know
the product better than the customer. This includes all safety
precautions and related items.
Prior to actual installation, thoroughly familiarize yourself with
this Instruction Manual. Pay special attention to all safety
warnings. Often during installation or repair it is possible to
place yourself in a position which is more hazardous than
when the unit is in operation.
Remember, it is your responsibility to install the product safely
and to know it well enough to be able to instruct a customer
in its safe use.
Safety is a matter of common sense...a matter of thinking
before acting. Most dealers have a list of specic good safety
practices...follow them.
The precautions listed in this Installation Manual are intended
as supplemental to existing practices. However, if there is
a direct conict between existing practices and the content
of this manual, the precautions listed here take precedence.
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
*NOTE: Please contact your distributor or our website for
the applicable Specication Sheet referred to in this manual.
These furnaces comply with requirements
embodied in the American National
Standard / National Standard of Canada
ANSI Z21.47·CSA-2.3 Gas Fired Central
Furnaces.
90% HEX
DO NOT LIFT
PRODUCT USING
HEAT EXCHANGER
IOG-2038C
6/2025
19001 Kermier Rd. Waller, TX 77484
www.goodmanmfg.com • www.amana-hac.com
© 2025 Daikin Comfort Technologies Manufacturing, Inc.
is a registered trademark of Maytag Corporation or its related companies and is used under
license. All rights reserved.
Only personnel that have been trained to install, adjust,
service, maintenance or repair (hereinafter, “service”)
the equipment specified in this manual should service the
equipment.
This equipment is not intended for use by persons
(including children) with reduced physical, sensory or
mental capabilities, or lack of experience and knowledge,
unless they have been given supervision or instruction
concerning use of the appliance by a person responsible
for their safety.
Children should be supervised to ensure that they do not
play with the equipment.
The manufacturer will not be responsible for any injury
or property damage arising from improper supervision,
service or service procedures. If you service this unit, you
assume responsibility for any injury or property damage
which may result. In addition, in jurisdictions that require
one or more licenses to service the equipment specified in
this manual, only licensed personnel should service the
equipment. Improper supervision, installation, adjustment,
servicing, maintenance or repair of the equipment specified
in this manual, or attempting to install, adjust, service
or repair the equipment specified in this manual without
proper supervision or training may result in product
damage, property damage, personal injury or death.
WARNING
Do not bypass safety devices.
WARNING
WARNING
This furnace may be paired with a cooling unit that uses R-32
refrigerant. If the cooling unit paired with this furnace does
not use R-32, the R-32 function in the furnace control board
needs to be turned off. please see the electrical and the R-32
sections for more details.
Refrigerant systems other than R-410A or R32 may
require an additional mitigation control board. Refer to
the installation manual of the indoor evaporator coil to
determine installation requirements for that supplier’s
refrigerant detection system.
background
2
Table of Contents
Safety Considerations .............................................. 2
Product Description .................................................... 4
Product Application ..................................................... 4
Location Requirements & Considerations ................. 5
Combustion & Ventilation Requirements ............... 9
Installation Positions ................................................. 9
Horizontal Applications & Considerations .............. 10
Condensate Drain Lines & Drain Trap ........................ 20
Electrical Connections ............................................. 25
Gas Supply and Piping .................................................. 29
Propane Gas/High Altitude Installations.................. 29
Circulating Air & Filters ........................................... 32
Startup Procedure & Adjustment .............................. 34
R-32 Information .......................................................... 37
Airflow Tables ............................................................ 38
Normal Sequence of Operation ............................... 42
Operational Checks ..................................................... 44
Safety Circuit Description .......................................... 44
Troubleshooting .......................................................... 44
Maintenance .................................................................. 45
Before Leaving an Installation .................................. 46
Status Codes ................................................................ 47
Troubleshooting Chart ............................................. 49
Wiring Diagram ............................................................ 52
Start Up Checklist ...................................................... 54
Failure to follow the safety warnings exactly could
result in serious injury, death or property damage.
Never test for gas leaks with an open flame.
Use a commercially available soap solution made
specifically for the detection of leaks to check all
connections. A fire or explosion may result causing
property damage, personal injury or loss of life.
WARNING
FIRE OR EXPLOSION HAZARD
AVERTISSEMENT
RISQUE D’INCENDIE OU D’EXPLOSION
Si les consignes de sécurité ne sont pas suivies à la lettre,
cela peut entraîner la mort, de graves blessures ou des
dommages matériels.
Ne jamais vérifier la présence de fuites de gaz au
moyen d’une flamme nue. Vérifier tous les raccords en
utilisant une solution savonneuse commerciale conçue
spécialement pour la détection de fuites. Un incendie ou
une explosion risque de se produire, ce qui peut entraîner
la mort, des blessures ou des dommages matériels.
Safety Considerations
Adhere to the following warnings and cautions when install-
ing, adjusting, altering, servicing, or operating the furnace.
To ensure proper installation and operation, thoroughly read
this manual for specics pertaining to the installation and
application of this product.
This furnace is manufactured for use with natural gas. It
may be eld converted to operate on L.P. gas by using the
appropriate L.P. conversion kit listed in the PROPANE GAS/
HIGH ALTITUDE INSTALLATIONS section of this manual
Install this furnace only in a location and position as specied
in LOCATION REQUIREMENTS & CONSIDERATIONS
section and INSTALLATION POSITIONS section of this
manual.
Provide adequate combustion and ventilation air to the fur-
nace as specied in COMBUSTION & VENTILATION AIR
REQUIREMENTS section of this manual.
Combustion products must be discharged to the outdoors.
Connect this furnace to an approved vent system only, as
specied in VENT/FLUE PIPE & COMBUSTION AIR PIPE
section of this manual.
Never test for gas leaks with an open ame. Use a com-
mercially available soap solution made specically for the
detection of leaks to check all connections, as specied in
GAS SUPPLY AND PIPING section of this manual.
Always install a furnace to operate within the furnace’s
intended temperature-rise range with a duct system which
has external static pressure within the allowable range, as
specied on the furnace rating plate and OPERATIONAL
CHECKS section of these instructions.
When a furnace is installed so that supply ducts carry air cir-
culated by the furnace to areas outside the space containing
the furnace, the return air shall also be handled by duct(s)
sealed to the furnace casing and terminating outside the
space containing the furnace.
CAUTION
FROZEN AND BURST WATER PIPE HAZARD
Failure to protect against the risk of freezing may result
in property damage. Special precautions must be made
if installing furnace in an area which may drop below
freezing. This can cause improper operation or damage to
equipment. IF the furnace environment has the potential
of freezing, the drain trap must be protected. The use of
electric heat tape and/or pipe insulation is recommended
for these installations.
A gas-red furnace for installation in a residential garage
must be installed as specied in the LOCATION REQUIRE-
MENTS AND CONSIDERATIONS section of this manual.
This furnace may be used as a construction site heater only
if certain conditions are met. These conditions are listed in
the PRODUCT APPLICATION section of this manual.
background
3
WARNING
To prevent personal injury or death due to improper
installation, adjustment, alteration, service or maintenance,
refer to this manual. For additional assistance or
information, consult a qualified installer, servicer agency
or the gas supplier.
WARNING
If the information in these instructions is not followed
exactly, a fire or explosion may result causing property
damage, personal injury or loss of life.
- do not store or use gasoline or other flammable vapors
and liquids in the vicinity of this or any other appliance.
- WHAT TO DO IF YOU SMELL GAS:
Do not try to light any appliance.
Do not touch any electrical switch; do not use any phone in
your building.
Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions. If you
cannot reach your gas supplier, call the fire department.
- Installation and service must be performed by a qualified
installer, service agency or the gas supplier.
WARNING
Heating unit should not be utilized without reasonable,
routine, inspection, maintenance and supervision. If
the building in which any such device is located will be
vacant, care should be taken that such device is routinely
inspected, maintained and monitored. In the event that the
building may be exposed to freezing temperatures and
will be vacant, all water-bearing pipes should be drained,
the building should be properly winterized, and the water
source closed. In the event that the building may be exposed
to freezing temperatures and will be vacant, any hydronic
coil units should be drained as well and, in such case,
alternative heat sources should be utilized.
WARNING
To prevent possible property damage, personal injury or
death due to electrical shock, the furnace must be located
to protect the electrical components from water.
Drain trap must be primed at time of installation. Trap is in-
ternally partitioned; add water to both inlet ports until water
appears at both sides of the outlet opening. Failure to prime
trap at time of installation may have a negative e󰀨ect on
combustion quality and pressure switch action.
Shipping Inspection
All units are securely packed in shipping containers tested
according to International Safe Transit Association specica-
tions. The carton must be checked upon arrival for external
damage. If damage is found, a request for inspection by the
carrier’s agent must be made in writing immediately.
The furnace must be carefully inspected on arrival for damage
and bolts or screws which may have come loose in transit.
In the event of damage the consignee should:
1. Make a notation on delivery receipt of any visible
damage to shipment or container.
2. Notify the carrier promptly and request an inspection.
3. With concealed damage, the carrier must be notied
as soon as possible - preferably within ve days.
4. File the claim with the following support documents
within a nine-month statute of limitations.
• Original or certied copy of the Bill of Lading, or
indemnity bond.
• Original paid freight bill or indemnity in lieu thereof.
• Original or certied copy of the invoice, showing
trade and other discounts or reductions.
• Copy of the inspection report issued by the carrier’s
representative at the time damage is reported to
carrier.
The carrier is responsible for making prompt inspection of
damage and for a thorough investigation of each claim. The
distributor or manufacturer will not accept claims from dealers
for transportation damage.
WARNING
Should overheating occur or the gas supply fail to shut
off, turn off the manual gas shutoff valve external to the
furnace before turning off the electrical supply.
WARNING
Possible property damage, personal injury or death due to
fire, explosion, smoke, soot, condensation, electrical shock
or carbon monoxide may result from improper installation,
repair operation, or maintenance of this product.
Electrostatic Discharge (ESD)
Precautions
NOTE: Discharge your body’s static electricity before touch-
ing unit. An electrostatic discharge can adversely a󰀨ect
electrical components.
Use the following precautions during furnace installation
and servicing to protect the integrated control module from
damage. By putting the furnace, the control, and the person
at the same electrostatic potential, these steps will help
avoid exposing the integrated control module to electrostatic
discharge. This procedure is applicable to both installed and
non-installed (ungrounded) furnaces.
1. Disconnect all power to the furnace. Do not touch the
integrated control module or any wire connected to the
control prior to discharging your body’s electrostatic
charge to ground.
2. Firmly touch a clean, unpainted, metal surface of the
furnace near the control. Any tools held in a person’s
hand during grounding will be discharged.
3. Service integrated control module or connecting
wiring following the discharge process in step 2. Use
caution not to recharge your body with static electricity;
background
4
(i.e., do not move or shu󰀪e your feet, do not touch
ungrounded objects, etc.). If you come in contact with
an ungrounded object, repeat step 2 before touching
control or wires.
4. Discharge your body to ground before removing a new
control from its container. Follow steps 1 through 3 if
installing the control on a furnace. Return any old or
new controls to their containers before touching any
ungrounded object.
To The Installer
Before installing this unit, please read this manual thoroughly
to familiarize yourself with specic items which must be ad-
hered to, including but not limited to: unit maximum external
static pressure, gas pressures, BTU input rating, proper elec-
trical connections, circulating air temperature rise, minimum
or maximum CFM, and motor speed connections.
WARNING
To prevent property damage, personal injury or death due
to fire, do not install this furnace in a mobile home, trailer,
or recreational vehicle.
NOTE: This unit should be installed in a
manner so that it is not accessible to the
public.
Product Description
Features
The *R9T96 furnace may be installed upow or horizon-
tally with left or right side down. The *D9T96 furnace may
be installed downow or horizontally with left or right side
down. *R9T96 & *D9T96 two-stage gas furnaces features a
multi-speed ECM indoor fan motor, two heating inputs (W1
& W2), two cooling inputs (Y1/Y & Y2) and a two stage gas
valve. A single stage heating thermostat may also be used
in conjunction with timed transition to high re by the furnace
integrated control board.
Product Application
This furnace is primarily designed for residential home-heat-
ing applications. It is NOT designed or certied for use in
mobile homes, trailers or recreational vehicles. Neither is it
designed or certied for outdoor applications. The furnace
must be installed indoors (i.e., attic space, crawl space, or
garage area provided the garage area is enclosed with an
operating door).
This furnace can be used in the following non-industrial
commercial applications:
Schools, O󰀩ce buildings, Churches, Retail stores, Nursing
homes, Hotels/motels, Common or o󰀩ce areas
In such applications, the furnace must be installed with the
following stipulations:
• It must be installed per the installation instructions
provided and per local and national codes.
• It must be installed indoors in a building constructed
on site.
• It must be part of a ducted system and not used in
a free air delivery application.
• It must not be used as a “make-up” air unit.
• It must be installed as a two-pipe system for
combustion air.
• All other warranty exclusions and restrictions apply.
This furnace is an ETL dual-certied appliance and
is appropriate for use with natural or propane gas
(NOTE: If using propane, a propane conversion kit
is required).
Dual certication means that the combustion air inlet pipe is
optional and the furnace can be vented as a:
Non-direct vent (single pipe) central forced air
furnace in which combustion air is taken from the
installation area or from air ducted from the outside
or,
Direct vent (dual pipe) central forced air furnace
in which all combustion air supplied directly to the
furnace burners through a special air intake system
outlined in these instructions.
This furnace may be used as a construction site heater ONLY
if all of the following conditions are met:
• The vent system is permanently installed per these
installation instructions.
• A room thermostat is used to control the furnace.
Fixed jumpers that provide continuous heating
CANNOT be used and can cause long term
equipment damage. Bi-metal thermostats, or any
thermostat a󰀨ected by vibration must not be used
during construction.
• Return air ducts are provided and sealed to the
furnace.
• A return air temperature range between 60ºF (16ºC)
and 80ºF (27ºC) is maintained.
• MERV 11 air lter(s) are installed in the system
and inspected daily and replaced as needed during
construction and upon completion of construction.
• The input rate and temperature rise are set per the
furnace rating plate.
• The furnace must be installed as a two pipe system,
using 100% outside air for combustion during
construction.
• The furnace heat exchanger, components, duct
system, air lters and evaporator coils are thoroughly
cleaned following nal construction clean up by a
qualied person.
• All furnace operating conditions (including ignition,
input rate, temperature rise and venting) are veried
by a qualied person according to these installation
instructions.
• Furnace doors must be in place on the furnace while
the furnace is operating in any mode.
• Damage or repairs due to failure to comply with these
requirements are not covered under the warranty.
background
5
NOTE: The Commonwealth of Massachusetts requires that
the following additional requirements must also be met:
• Gas furnaces must be installed by a licensed
plumber or gas tter.
• A T-handle gas cock must be used.
• If the unit is to be installed in an attic, the passageway
to and the service area around the unit must have
ooring.
To ensure proper furnace operation, install, operate and
maintain the furnace in accordance with these installa-
tion and operation instructions, all local building codes
and ordinances. In their absence, follow the latest edition
of the National Fuel Gas Code (NFPA 54/ANSI Z223.1), and/
or CAN/CSA B149.1-15 Installation Codes, local plumbing or
wastewater codes, and other applicable codes.
A copy of the National Fuel Gas Code (NFPA 54/ANSI
Z223.1) can be obtained from any of the following:
American National Standards Institute
25 West 43rd Street, 4th Floor
New York, NY 10036
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
CSA International
8501 East Pleasant Valley
Independence, OH 44131
The rated heating capacity of the furnace should be greater
than or equal to the total heat loss of the area to be heated.
The total heat loss should be calculated by an approved
method or in accordance with “ASHRAE Guide” or “Manual
J-Load Calculations” published by the Air Conditioning Con-
tractors of America.
B10259-216
CO can cause serious illness including permanent brain
damage or death.
Advertencia especial para la instalación de calentadores ó manejadoras
de aire en áreas cerradas como estacionamientos ó cuartos de servicio.
B10259-216
El monóxido de carbono puede causar enfermedades severas
como daño cerebral permanente ó muerte.
Las emisiones de monóxido de carbono pueden circular a través
del aparato cuando se opera en cualquier modo.
B10259-216
RISQUE D'EMPOISONNEMENT AU
MONOXYDE DE CARBONE
Le monoxyde de
des
carbone peut causer des maladies graves telles que
dommages permanents au cerveau et meme la mort.
Cette ventilation est nécessaire pour éviter le danger d'intoxication
au CO pouvant survenir si un appareil produisant du monoxyde
de carbone continue de fonctionner au sein de la zone confinée.
A copy of the CAN/CSA B149.1-15 Installation Codes can
also be obtained from:
CSA International
178 Rexdale Boulevard
Etobicoke, Ontario, Canada M9W 1R3
Location Requirements
& Considerations
Follow the instructions listed below and the guidelines provided
in the Combustion and Ventilation Air Requirements section
when selecting a furnace location.
WARNING
Possible property damage, personal injury or death due to
fire, explosion, smoke, soot, condensation, electrical shock
or carbon monoxide may result from improper installation,
repair operation, or maintenance of this product.
WARNING
To prevent possible equipment damage, property damage,
personal injury, the following bullet points must be
observed when installing this unit.
• Centrally locate the furnace with respect to the
proposed or existing air distribution system.
• Ensure the temperature of the return air entering
the furnace is between 55°F and 100°F when the
furnace is heating.
• Provide provisions for venting combustion products
outdoors through a proper venting system. Special
consideration should be given to vent/ue pipe
routing and combustion air intake pipe when
applicable. Refer to Vent/Flue Pipe and Combustion
Air Pipe -Termination Locations for appropriate
background
6
termination locations and to determine if the
piping system from furnace to termination can be
accomplished within the guidelines given. NOTE:
The length of ue and/or combustion air piping can
be a limiting factor in the location of the furnace.
• Locate the furnace so condensate ows downwards
to the drain. Do not locate the furnace or its
condensate drainage system in any area subject to
below freezing temperatures without proper freeze
protection. Refer to Condensate Drain Lines and
Trap for further details.
• Ensure adequate combustion air is available for
the furnace. Improper or insu󰀩cient combustion air
can expose building occupants to gas combustion
products that could include carbon monoxide. Refer
to Combustion and Ventilation Air Requirements.
• Set the furnace on a level oor to enable proper
condensate drainage. If the oor becomes wet or
damp at times, place the furnace above the oor on
a concrete base sized approximately 1-1/2” larger
than the base of the furnace. Refer to the Horizontal
Applications and Considerations for leveling of
horizontal furnaces.
• Ensure upow or horizontal furnaces are not installed
directly on carpeting, or any other combustible
material. The only combustible material allowed is
wood.
• Exposure to contaminated combustion air will result
in safety and performance-related problems. Do
not install the furnace where the combustion air is
exposed to the following substances:
permanent wave solutions
carbon tetrachloride
deicing salts or chemicals
cleaning solutions (such as perchloroethylene)
paint removers
cements and glues
chlorinated waxes or cleaners
water softening chemicals
halogen type refrigerants
chlorine-based swimming pool chemicals
printing inks
varnishes
hydrochloric acid
antistatic fabric softeners for clothes dryers
• Seal o󰀨 a non-direct vent furnace if it is installed
near an area frequently contaminated by any of
the above substances. This protects the non-direct
vent furnace from airborne contaminants. To ensure
that the enclosed non-direct vent furnace has an
adequate supply of combustion air, vent from a
nearby uncontaminated room or from outdoors.
Refer to the Combustion and Ventilation Air
Requirements for details.
• If the furnace is used in connection with a cooling
coil unit, install the furnace upstream of the cooling
coil.
• A coil installed above an upow furnace or under a
counterow furnace may be the same width as the
furnace or may be one size larger than the furnace.
Example: a “C” width coil may be installed with a “B”
width furnace.
• For all applications, the front of the coil and
furnace must face the same direction.
• If the furnace is installed in a residential garage,
position the furnace so that the burners and ignition
source are located not less than 18 inches (457 mm)
above the oor. Protect the furnace from physical
damage by vehicles.
• If the furnace is installed horizontally, ensure the
access doors are not on the “up/top” or “down/
bottom” side of the furnace.
• Do not connect this furnace to a chimney ue that
serves a separate appliance designed to burn solid
fuel.
• On Counterow Installations, the air conditioning coil
must be downstream on the supply (positive) side
of the furnace heat exchanger.
• Counterow Installation over a noncombustible oor.
Before setting the furnace over the plenum opening,
ensure the surface around the opening is smooth
and level. A tight seal should be made between the
furnace base and oor by using a silicone rubber
caulking compound or cement grout.
• Counterow Installation over a combustible oor. If
installation over a combustible oor becomes
necessary, use an accessory subbase (see
Specication Sheet applicable for your model for
details.) A special accessory subbase must be
used for upright counterow unit installations
over any combustible material including wood.
Refer to subbase instructions for installation details.
Follow the instructions with the subbase for proper
installation. Do not install the furnace directly on
carpeting, tile, or other combustible material other
than wood ooring.
NOTE: The subbase will not be required if an air conditioning
coil is installed between the supply air opening on the furnace
and the oor.
Clearances and Accessibility
NOTES:
• For servicing or cleaning, a 24” front clearance is
required.
• Unit connections (electrical, ue and drain) may
necessitate greater clearances than the minimum
clearances listed above.
• In all cases, accessibility clearance must take
precedence over clearances from the enclosure
where accessibility clearances are greater.
background
7
NOTES:
• For servicing or cleaning, a 24” front clearance is
required.
• Unit connections (electrical, ue and drain) may
necessitate greater clearances than the minimum
clearances listed above.
• In all cases, accessibility clearance must take
precedence over clearances from the enclosure
where accessibility clearances are greater.
Clearance in accordance with local installation codes, the
requirements of the gas supplier and the manufacturer's
installation instructions.
Dégaugement conforme aux codes d'installation locaux, aux
exigences du fournisseur de gaz et aux instructions
d'installation du fabricant.
Installations must adhere to the clearances to combustible
materials to which this furnace has been certied. The min-
imum clearance information for this furnace is provided on
the unit’s clearance label. These clearances must be per-
manently maintained. Clearances must also accommodate
an installation’s gas, electrical, and drain trap and drain line
connections. If the alternate combustion air intake or vent/ue
connections are used additional clearance must be provided
to accommodate these connections. Refer to Vent/Flue Pipe
and Combustion Air Pipe for details.
NOTE: In addition to the required clearances to combustible
materials, a minimum of 24 inches service clearance must
be available in front of the unit.
POSITION* SIDES REAR FRONT BOTTOM FLUE TOP
Upflow 0" 0" 3" C 0" 1"
Horizontal 6" 0" 3" C 0" 6"
*R9T96 MINIMUM CLEARANCES TO COMBUSTIBLE
MATERIALS (INCHES)
C= If placed on combustible oor, oor MUST be wood only.
POSITION* SIDES REAR FRONT BOTTOM FLUE TOP
Downflow 0" 0" 3" NC 0" 1"
Horizontal 6" 0" 3" C 0" 6"
*D9T96 MINIMUM CLEARANCES TO COMBUSTIBLE
MATERIALS (INCHES)
C= If placed on combustible oor, oor MUST be wood only.
NC= For installation on non-combustible oor only. A combustible
subbase must be used for installations on combustible ooring.
TOP
BOTTOM
TOP
BOTTOM
Figure 1
A furnace installed in a conned space (i.e., a closet or utility
room) must have two ventilation openings with a total min-
imum free area of 0.25 square inches per 1,000 BTU/hr of
furnace input rating. Refer to Specication Sheet applicable to
your model for minimum clearances to combustible surfaces.
One of the ventilation openings must be within 12 inches of
the top; the other opening must be within 12 inches of the
bottom of the conned space. In a typical construction, the
clearance between the door and door frame is usually ade-
quate to satisfy this ventilation requirement.
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each
appliance connected to the venting system being placed
into operation could result in carbon monoxide poisoning
or death.
The following steps shall be followed with each appliance
connected to the venting system placed in operation, while
any other appliances connected to the venting system are
not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the National Fuel
Gas Code, ANSI Z223.1 or the Natural Gas and
Propane Installation Code, CSA B149.1-15 and these
instructions. Determine that there is no blockage or
restriction, leakage, corrosion and other deficiencies
which could cause an unsafe condition.
3. As far as practical, close all building doors and
windows and all doors between the space in which
the appliance(s) connected to the venting system are
located and other spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any exhaust
fans, such as range hoods and bathroom exhausts, so
they shall operate at maximum speed.
Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance
being inspected in operation. Adjust thermostat so
appliance shall operate continuously.
7. Test for spillage from draft hood appliances at the
draft hood relief opening after 5 minutes of main
burner operation. Use the flame of a match or candle.
8. If improper venting is observed during any of the
above tests, the venting system must be corrected
in accordance with the National Fuel Gas Code ANSI
Z223.1/NFPA 54 and/or National Gas and Propane
Installation Code CSA B149.1-15.
9. After it has been determined that each appliance
connected to the venting system properly vents when
tested as outlined above, return doors, windows,
exhaust fans, fireplace dampers and any other gas
burning appliance to their previous conditions of use.
background
8
AVERTISSEMENT
RISQUE D’INTOXICATION AU MONOXYDE DE CARBONE
Si les étapes décrites ci-dessous ne sont pas suivies pour
chacun des appareils raccordés au système de ventilation
au moment de sa mise en marche, cela peut entraîner une
intoxication au monoxyde de carbone ou la mort.
Les étapes suivantes doivent être suivies pour chacun des
appareils raccordés au système de ventilation au moment de
sa mise en marche, alors que tous les autres appareils
raccordés au système de ventilation ne sont pas en marche:
1. Sceller toutes les ouvertures inutilisées du système
de ventilation.
2. Inspecter le système de ventilation afin de vérifier si la
taille et l’inclinaison par rapport à l’horizontale sont
conformes aux exigences du National Fuel Gas Code,
ANSI Z223.1/NFPA 54 ou du Code d’installation du gaz
naturel et du propane, CSA B149.1 et à ces instructions.
Vérifier qu’il n’y a pas d’obstruction ou de restriction,
de fuite, de corrosion et d’autres problèmes qui
pourraient entraîner une situation dangereuse.
3. Si possible, fermer toutes les portes et fenêtres du
bâtiment ainsi que toutes les portes séparant l’endroit
où se trouvent les appareils raccordés au système de
ventilation et les autres zones du bâtiment.
4. Fermer le registre des foyers.
5. Mettre les sécheuses en marche ainsi que tous les
autres appareils qui ne sont pas raccordés au système
de ventilation. Mettre en marche tous les ventilateurs
de tirage, comme celui des hottes de cuisine et des
salles de bains, et les régler à la puissance maximale.
Ne pas mettre en marche les ventilateurs d’été.
6. Suivre les instructions d’allumage. Mettre en marche
l’appareil soumis à l’inspection. Régler le thermostat
de manière à ce que l’appareil fonctionne en continu.
7. Vérifier la présence de fuite au niveau de l’ouverture
du coupe-tirage des appareils qui en sont dotés après
5 minutes de fonctionnement du brûleur principal.
Utiliser la flamme d’une allumette ou d’une bougie.
8. Si un problème de ventilation est observé pendant l’un
des essais décrits ci-dessus, des correctifs doivent
être apportés au système de ventilation conformément
au National Fuel Gas Code, ANSI Z223.1/NFPA 54 et (ou)
au Code d’installation du gaz naturel et du propane,
CSA B149.1.
9. Une fois qu’il a été déterminé que chaque appareil
raccordé au système de ventilation fonctionne
correctement au moyen des essais décrits ci-dessus,
les portes, les fenêtres, les ventilateurs, les registres
de foyer et tous les autres appareils de combustion
alimentés au gaz doivent être remis dans leur état
initial.
Existing Furnace Removal
NOTE: When an existing furnace is removed from a venting
system serving other appliances, the venting system may be
too large to properly vent the remaining attached appliances.
The following vent testing procedure is repro duced from
the American National Standard/National Standard
of Canada for Gas-Fired Central Furnaces ANSI Z21.47,
CSA-2.3 latest edition Section 1.23.1.
The following steps shall be followed with each appliance
connected to the venting system placed in operation, while
any other appliances connected to the venting system are
not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and hor-
izontal pitch, as required by the National Fuel Gas
Code, ANSI Z223.1 or the Natural Gas and Propane
Installation Code, CSA B149.1-15 and these instruc-
tions. Determine that there is no blockage or restriction,
leakage, corrosion and other deciencies which could
cause an unsafe condition.
3. As far as practical, close all building doors and windows
and all doors between the space in which the appli-
ance(s) connected to the venting system are located
and other spaces of the building.
4. Close replace dampers.
5. Turn on clothes dryers and any appliance not connect-
ed to the venting system. Turn on any exhaust fans,
such as range hoods and bathroom exhausts, so they
shall operate at maximum speed. Do not operate a
summer exhaust fan.
6. Follow the lighting instructions. Place the appliance
being inspected in operation. Adjust thermostat so
appliance shall operate continuously.
7. Test for spillage from draft hood appliances at the draft
hood relief opening after 5 minutes of main burner
operation. Use the ame of a match or candle.
8. If improper venting is observed during any of the above
tests, the venting system must be corrected in accor-
dance with the National Fuel Gas Code ANSI Z223.1/
NFPA 54 and/or National Gas and Propane Installation
Code CSA B149.1-15.
9. After it has been determined that each appliance
connected to the venting system properly vents when
tested as outlined above, return doors, windows,
exhaust fans, replace dampers and any other gas
burning appliance to their previous conditions of use.
If resizing is required on any portion of the venting system,
use the appropriate table in Appendix G in the latest edi-
tion of the National Fuel Gas Code ANSI Z223.1 and/or
CSA B149.1-15 Installation Codes.
Thermostat Location
The thermostat should be placed approximately ve feet from
the oor on a vibration-free, inside wall in an area having
good air circulation. Do not install the thermostat where it
may be inuenced by any of the following:
• Drafts, or dead spots behind doors, in corners, or
under cabinets.
• Hot or cold air from registers.
• Radiant heat from the sun.
• Light xtures or other appliances.
• Radiant heat from a replace.
• Concealed hot or cold water pipes, or chimneys.
• Unconditioned areas behind the thermostat, such
as an outside wall.
background
9
Consult the instructions packaged with the thermostat
for mounting instructions and further precautions.
Combustion & Ventilation
Requirements
WARNING
To avoid property damage, personal injury or death,
sufficient fresh air for proper combustion and ventilation
of flue gases must be supplied. Most homes require outside
air be supplied into the furnace area.
Improved construction and additional insulation in buildings
have reduced heat loss by reducing air inltration and escape
around doors and windows. These changes have helped in
reducing heating/cooling costs but have created a problem
supplying combustion and ventilation air for gas red and
other fuel burning appliances. Appliances that pull air out
of the house (clothes dryers, exhaust fans, replaces, etc.)
increase the problem by starving appliances for air.
House depressurization can cause back drafting or improper
combustion of gas-red appliances, thereby exposing build-
ing occupants to gas combustion products that could include
carbon monoxide.
If this furnace is to be installed in the same space with other
gas appliances, such as a water heater, ensure there is an
adequate supply of combustion and ventilation air for the
other appliances. Refer to the latest edition of the National
Fuel Gas Code NFPA 54/ANSI Z223.1 or CAN/CSA B149.1-
15 Installation Codes or applicable provisions of the local
building codes for determining the combustion air require-
ments for the appliances.
Most homes will require outside air be supplied to the fur-
nace area by means of ventilation grilles or ducts connecting
directly to the outdoors or spaces open to the outdoors such
as attics or crawl spaces.
Installation Positions
Figure 2A
Figure 2B
Figure 2C
Figure 2D
Recommended Installation Positions
*R9T96 models may be installed upow or horizontally
with left or right side down. *D9T96 models may be installed
down ow or horizontally with left or right side down. Do not
install this furnace on its back. For upright upow furnaces,
return air ductwork may be attached to the side panel(s)
and/or basepan. For upright counterow furnaces, return
air ductwork must be attached to the top end of the blower
compartment. For any horizontally installed furnaces, return
ductwork must be attached to the blower compartment end
of the furnace. NOTE: Ductwork must never be attached to
the back of the furnace. Refer to “Recommended Installa-
tion Positions” gure for appropriate installation positions,
ductwork connections, and resulting airow arrangements.
background
10
Auxiliary Drain Pan
An auxiliary/secondary drain pan should be installed under
a condensing furnace and/or indoor coil when any potential
leakage could cause damage to ceilings, oors or other areas
below the installation location. The auxiliary drain pan should
be at least 1-1/2 inches deep, 3 inches larger than the unit
and constructed of corrosion-resistant material. The drain
pan should have a drain line connected to the pan and the
drain line should be pitched downward away from the pan a
minimum of 1/8” per foot of drain line. The drain line should
terminate in a location where the water dripping from the
drain line will alert the occupant that a problem exists. The
auxiliary drain pan should also be equipped with a water level
detection device conforming to UL 508 that will shut o󰀨 the
equipment served prior to overow of the pan.
For upow and horizontal installations, the furnace and/or
indoor coil should be installed so that the equipment is at least
1-1/2 inches above the drain pan. Do not install the furnace
and/or indoor coil directly into the auxiliary/secondary drain
pan and do not use any wood product in the drain pan to
elevate the furnace. Bricks, 2-inch concrete cap blocks, metal
furnace stands, or furnace blocks can be used to elevate the
furnace. For an upow furnace installation, seal the entire
bottom of the furnace before setting the furnace at least 1-1/2
inches above the drain pan.
Failure to properly install an auxiliary/secondary drain pan
for a furnace and/or indoor coil can result in water damage
to components and the furnace’s metal cabinet.
Horizontal Applications
& Considerations
When installing a furnace horizontally, additional consider-
ation must be given to the following:
Furnace Suspension
If suspending the furnace from rafters or joists, use 3/8”
threaded rod and 2”x2”x3/8” angle iron as shown in the follow-
ing diagram. The length of rod will depend on the application
and the clearances necessary.
If the furnace is installed in a crawl space it must be sus-
pended from the oor joist or supported by a concrete pad.
Never install the furnace on the ground or allow it to be
exposed to water.
Figure 3
Front Cover Pressure Switch Tube
Location
When a furnace is installed horizontally with left side down,
the front cover pressure switch tube must be re-located to
the lower port of the collector box cover.
1. Remove tube from front cover pressure switch and
collector box cover.
2. Remove rubber plug from bottom collector box port and
install on top of collector box port.
3. Locate 24’’ x 1/4’’ tube in bag assembly.
4. Install one end on front cover pressure switch.
5. Route tube to lower port on collector box cover and cut
o󰀨 excess tubing.
Drain Trap and Lines
In horizontal applications the condensate drain trap is secured
to the furnace side panel, suspending it below the furnace. A
minimum clearance of 5.5” below the furnace must be provid-
ed for the drain trap. Additionally, the appropriate downward
piping slope must be maintained from the drain trap to the
drain location. Refer to Condensate Drain Trap and Lines for
further details. If the drain trap and drain line will be exposed
to temperatures near or below freezing, adequate measures
must be taken to prevent condensate from freezing.
Horizontal Furnace Leveling
Leveling ensures proper condensate drainage from the heat
exchanger. For proper ue pipe drainage, the furnace must
be level lengthwise from end to end. The furnace should have
a slight tilt from back to front with the access doors downhill
from the back panel approximately 1/2 to 3/4 inches. The
slight tilt allows the heat exchanger condensate, generated
in the secondary heat exchanger, to ow forward to the sec-
ondary heat exchanger front cover.
background
11
1/2" - 3/4"
1/2" - 3/4"
EQUIPMENT SETTING
UNIT MUST BE LEVELLED SIDE-TO-SIDE.
UNIT MAY BE POSITIONED FROM LEVEL TO 1/2" TOWARD THE FRONT TO AID IN DRAINING
UPFLOW APPLICATION
HORIZONTAL APPLICATION
SIDE VIEW
FRONT VIEW
SIDE-TO-SIDE
LEVELLED
FRONT VIEW
HORIZONTAL POSITION
SIDE-TO-SIDE
LEVELLED
RETURN END VIEW
FRONT
Alternate Electrical and Gas Line Con-
nections
This furnace has provisions allowing for electrical and gas
line connections through either side panel. In horizontal
applications the connections can be made either through the
“top” or “bottom” of the furnace.
Freeze Protection
Refer to Horizontal Applications and Conditions - Drain Trap
and Lines.
Vent Pipe & Combustion Air
WARNING
Failure to follow these instructions can result in bodily
injury or death. Carefully read and follow all instructions
given in this section.
WARNING
Upon completion of the furnace installation, carefully
inspect the entire flue system both inside and outside of the
furnace to assure it is properly sealed. Leaks in the flue
system can result in serious personal injury or death due to
exposure to flue products, including carbon monoxide.
This manual will refer to the pipe that discharges products of
combustion to the outdoors as the “vent” pipe or “ue” pipe.
The pipe that supplies air for combustion to the furnace will
be referred to as the “intake” pipe or “combustion air” pipe.
This furnace is dual certied and may be installed as a non-
direct vent (single pipe) or direct vent (dual pipe) appliance.
ABS and PVC Cellular/Foam Core products can no longer
be used for ue vent piping.
NOTE: These materials can be used for combustion
air only.
Materials - Installations in the U.S.A
PVC, CPVC, or ABS pipe & ttings are typically used as
venting and intake pipe materials. All 90° elbows must be
medium or long radius types. A medium radius elbow should
measure ~3-1/16” minimum from the plane of one opening
to the center line of the other opening for 2” diameter pipe,
and ~4-9/16” minimum for 3” pipe.
In addition to these materials, Innoue® by Centrotherm
Eco Systems is also an approved vent and combustion
air materials for installations in the U.S.A. Manufacturers
Installation instructions for these products must be followed.
These products have specic instructions for installing, joining
and terminating. Do not mix materials or components of
one manufacturer with materials or components of another
manufacturer. Refer to the following chart for plastic pipe &
ttings specications.
Materials - Installations in Canada
All installations in Canada must conform to the requirements
of CAN/CSA B149.1-15 code. All vent components, including
primer and cement, must be listed to ULC S636. The certied
pipe and ttings should be clearly marked with the ULC
standard “S636”. The primer and cement used must be of
the same manufacturer as the vent system. For Royal Pipe
System 636; use GVS-65 Primer (Purple) and GVS-65 PVC
Solvent Cement. For IPEX System 636, use PVC/CPVC
Primer, Purple or clear. Use PVC Solvent cement (Gray). For
Canadian installations, ABS may be used as a combustion air
pipe only. ABS is not an approved vent material in Canada.
If ABS is used as a combustion air pipe, it must be CSA
certied. Always follow the manufacturer’s instructions in the
use of primer and cement. Do not use primer and cement
around potential sources of ignition. Do not use primer or
cement beyond its expiration date.
Materials and Joining Methods
WARNING
To avoid bodily injury, fire or explosion, solvent cements
must be kept away from all ignition sources (i.e., sparks, open
flames, and excessive heat) as they are combustible liquids.
Avoid breathing cement vapors or contact with skin and/or
eyes.
background
12
PVC ASTM STANDARD
SCHEDULE 40 PIPE D1785
SDR 21 or 26 PIPE D2241
SYSTEM 1738® (IPEX) D1784, UL 1738
SCHEDULE 40 FITTINGS D2466
SYSTEM 1738® FITTINGS D1784, UL 1738
ABS
SCHEDULE 40 PIPE D1527
SCHEDULE 40 FITTINGS D2468
CPVC
SCHEDULE 40 PIPE F441
SDR 21 or 26 PIPE F442
FITTINGS F438
POLYPROPYLENE
INNOFLUE® (CENTROTHERM) UL 1738
POLYPRO® (DURAVENT) ULC S636
PRIMER & SOLVENT CEMENT
PVC PRIMER F656
CPVC PRIMER F656
PVC SOLVENT CEMENT D2564
CPVC SOLVENT CEMENT F493
ABS SOLVENT CEMENT D2235
ABS / PVC / CPVC ALL PURPOSE CEMENT (FOR
PIPE & FITTINGS OF THE SAME MATERIAL)
D2564, D2235, F493
TRANSITION CEMENT FOR ABS to PVC or CPVC D3188
INSTALLATIONS IN CANADA
PVC & CPVC PIPE & FITTINGS
PVC & CPVC SOLVENT CEMENT
TRANSITION CEMENT
INNOFLUE® (CENTROTHERM)
POLYPRO® (DURAVENT)
SYSTEM 636® (IPEX)
VENTING MATERIAL REQUIREMENTS
ULC S636
Pipe Installation
This furnace is manufactured with 2” CPVC vent & intake
couplings. Use transition cement to connect PVC or ABS
pipe to these ttings. For furnaces requiring installation of 3”
pipe, the transition from 2” to 3” should be done as close to
the furnace as possible, and only when the piping is sloped
enough to prevent condensation from collecting. This furnace
must not be connected to Type B, BW, or L vent or vent
connector, and must not be vented into masonry chimney. A
masonry chimney may be used as a chase or passageway for
approved venting materials providing the masonry chimney
is not also being used to vent products of combustion. Never
common vent this appliance with another appliance. Never
use a vent which is used by a solid fuel appliance.
Piping may run vertically or horizontally and must be ad-
equately supported to prevent strain on joints, sagging,
separation, and detachment from the furnace. Horizontal
runs of piping must be supported every three to ve feet.
Condensation within the furnace secondary heat exchanger
and in the vent pipe is a normal occurrence. Vent pipe must
be installed to maintain a minimum inch per foot downward
slope toward the furnace to return condensate to the furnace’s
drain system. Condensation may also occur in the intake
pipe. This commonly takes place during the summer months
when humid air enters an intake pipe that runs through a cool
basement or other conditioned space.
Precautions should be taken to prevent condensate from
freezing inside the ue/vent pipe, combustion air intake
pipe and/or at the pipe terminations. All ue/vent and/or
combustion air piping exposed to temperatures below 35°F
for extended periods of time should be insulated with 1/2”
thick closed cell foam. All vent/ue piping exposed to out-
doors in excess of the terminations permitted as described
in the provided installation manual should be insulated with
1/2” thick closed cell foam. Inspect piping for leaks prior to
installing insulation. If the combustion air intake or ue vent
pipe is to be installed above a nished ceiling or other area
where dripping of condensate will be objectionable, insulating
the combustion air pipe may be necessary. Use 1/2” thick
closed cell foam insulation where required. Refer to vent
& intake options for using the RF000142 kit and managing
condensation.
WARNING
Failure to follow these instructions can result in bodily
injury or death. Carefully read and follow all instructions
given in this section.
WARNING
Upon completion of the furnace installation, carefully
inspect the entire flue system both inside and outside of the
furnace to assure it is properly sealed. Leaks in the flue
system can result in serious personal injury or death due
to exposure to flue products, including carbon monoxide.
WARNING
To avoid bodily injury, fire or explosion, solvent cements
must be kept away from all ignition sources (i.e., sparks,
open flames, and excessive heat) as they are combustible
liquids. Avoid breathing cement vapors or contact with skin
and/or eyes.
PREFERRED
Figure 4
background
13
TRANSITION NO LESS
THAN 45 DEGREES TO
HORIZONTAL PLANE TO
AVOID CREATING A WATER
TRAP IN VENT PIPING.
ACCEPTABLE
Figure 5
NO TRANSITION ON
HORIZONTAL PLANE,
THIS CREATES A
WATER TRAP AND
RESTRICTS FLUE
GASES
Figure 6
Vent Pipe Connection
The vent pipe outlet is sized to accept 2” pipe. Secure vent
pipe directly into the furnace tting with the appropriate
glue. Alternately, a small section of 2” pipe may be glued in
the furnace socket and a rubber coupling installed to allow
removal for future service. Piping should be routed in a man-
ner to avoid contact with refrigerant lines, metering devices,
condensate drain lines, etc. If necessary, clearances may
be increased by creating an o󰀨set using two 45° elbows
(Figure 7).
Combustion Air Pipe Connection
If the furnace is being installed without a combustion air
pipe, a 90° elbow should be used on the combustion air
intake to guard against blockage.
On up ow / horizontal models, secure the combustion
air intake pipe to the air intake coupling using a rubber
coupling supplied with the furnace. The rubber coupling
may be omitted by inverting the intake coupling and gluing
pipe directly to it. Piping may also be glued to the intake
coupling in its original position by using a plastic coupling.
On counterow units secure the combustion air intake
pipe to the air intake coupling using the rubber coupling
and worm gear hose clamps provided with the unit. The
counterow rubber coupling allows service removal of air
intake piping internal to the furnace blower compartment.
The combustion air intake pipe can also be secured directly
to the counterow unit air intake pipe coupling.
Termination Locations
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
Figure 7
WARNING
The rubber elbow is not designed to support a load. When
the rubber elbow is mounted externally to the furnace
cabinet, extreme care must be taken to adequately support
field-supplied vent/flue piping, as damage can result in leaks
causing bodily injury or death due to exposure to flue gases,
including carbon monoxide.
Vent & Intake Pipe Options for Condensate
Management
The RF000142 coupling (Figure 10) can be secured
directly to the furnace intake and/or vent if condensation
is a concern. If the RF000142 is used on the combustion
air inlet, it must be installed with the arrow pointing
up. It should be noted, the combustion air will actually
be moving in a direction opposite of the arrow on the
RF000142 coupling. It must have a eld supplied, trapped
drain tube free-draining to proper condensate disposal
location. A loop in the drain tube can serve as a trap. The
unused RF000142 drain tting should be capped. A eld
supplied tee installed in the intake and/or vent pipe is
also an acceptable method of catching condensation. For
vertical vent piping, a PVC wye can be used for catching
condensation (see Figure 9). Any of these options must
have a eld supplied trapped drain tube or pipe, free-
draining to proper condensate disposal location. A loop in
the drain tube can serve as a trap.
background
14
COMBUSTION AIR INTAKE OPTIONS
Figure 8
Vent Piping with PVC WYE
Figure 9
CAUTION
Be sure not to damage internal wiring or other components
when reinstalling coupling and screws.
Alternate Vent & Intake Pipe Connections
When installing a furnace horizontally with the left side
down, alternate ue and combustion air pipe connections
may be used. This method allows the ue and combustion
air piping to be run vertically through the side of the
furnace (facing up in horizontal left). The alternate vent
location is the 3” hole directly in line with the induced draft
blower outlet.
When using the horizontal alternate vent conguration, you
must use the RF000142 vent drain kit. For Upow models,
see Figures 10, 11, and 12 & follow steps below.
NOTE: In the horizontal left installation
position, a means of condensate collection
must be provided to keep vent pipe condensate
from entering the draft inducer housing. If
the vent drain elbow is eliminated from the
installation, the RF000142 kit must be used.
1. Remove the four screws from the vent pipe ange on
top the furnace.
2. Remove the internal elbow, vent pipe & gasket.
3. Cut the internal vent pipe 2 1/2” from the ange.
Discard the un-anged section.
4. Remove the 3” plastic plug (in line with the inducer
outlet) and insert it in the space vacated by removal of
the internal vent pipe.
5. Install the RF000142 drain coupling with arrow facing
up, on the draft inducer outlet.
6. Insert the 2 ½” anged section of pipe with gasket
through the 3” hole and connect to RF000142 drain
coupling. Secure it with gear clamp provided.
7. Use the four self-tapping screws removed in step 1 to
secure ange to cabinet.
8. Connect drain hose to the uncapped port on the
RF000142 coupling, refer to page 25, section
entitled “Horizontal Installation with Left Side Down –
Alternate” for drain connection details.
When using the alternate venting location, either in a
horizontal left side down installation or a vertical installation
using down – venting, the alternate combustion air opening
can be used. A locating dimple is located on the right side of
the furnace cabinet. The locating dimple is 1-7/8” measured
from the front edge of the cabinet in line with the knock out.
To use the alternate combustion air location:
1. Remove screws and combustion air ange and gasket
from cabinet.
2. Insert the 3” cabinet plug from the drain bag assembly
in the unused combustion air hole.
3. Drill a pilot hole at the cabinet dimple (size dictated by
knockout tool used).
4. Use a knockout tool to create a 3” diameter hole.
5. Secure the combustion air ange & gasket to the
furnace cabinet using the self-tapping screws removed
in step 1.
background
15
VENT-DRAIN
RF000142 Coupling
Figure 10
Insert flange. Cut 2 ½” long.
RF000142
SEE FIGURE 10
Figure 11
Figure 12
Vent Pipe
Use alternate vent
& combination
air locations
Combustion Air Pipe
Field Supplied
Drain Tee on Vent Pipe
Condensate trapped
to prevent flue gas from escaping
and routed to field supplied
condensate disposal
1/4” per foot min.
slope to furnace
6’ Max.
Floor
B
a
s
e
m
e
n
t
/
C
r
a
w
l
s
p
a
c
e
DOWN VENTING UPFLOW MODEL FURNACES ONLY
All piping and fittings must be joined per material manufacturers specifications
to prevent separation and flue gas leaks.
Figure 13
For Downow models, see Figures 10, 14-15 & follow the
steps below for using the alternate vent location.
1. Remove the four screws from the vent pipe ange on
top of the furnace.
2. Remove the two screws from the blower deck holding
the ue elbow as well as the clamp hose holding it to
the internal vent pipe.
3. Remove the internal elbow, and internal vent pipe with
gasket.
4. Remove the 3” plastic plug from the furnace wrapper
(in line with the inducer outlet).
5. Seal up the unused vent hole on the top panel and the
unused vent hole on the blower deck from the burner
cabinet side. These holes should be sealed up using
sheet metal squares and then metallic tape. Please
make sure to seal up the openings really well.
6. Install the RF000142 drain coupling on the draft
inducer outlet with the arrow facing away from the
inducer outlet. Secure it with the gear clamp provided.
7. Measure and cut the internal vent pipe so that the
gasket and ange side of the pipe are ush with the
furnace side wrapper when the pipe is inserted into the
RF000142 drain coupling. Discard the un-anged cut
section.
a. B Cabinet: Pipe would need to be about 3.75” long
from the ange.
b. C Cabinet: Pipe would need to be about 7” long
from the ange.
c. D Cabinet: Pipe would need to be about 11” long
from the ange.
8. Insert the anged section of pipe with gasket through
the 3” hole and connect to RF000142 drain coupling.
Secure it with gear clamp provided.
9. Use the four self-tapping screws removed in step 1 to
secure ange to cabinet.
background
16
10. Connect drain hose to the uncapped port on the
RF000142 coupling, refer to page 25, section entitled
“CounterFlow Models Installed Horizontally with Left
Side Down – Alternate” for drain connection details.
The alternate vent location may also be used when
installing the downow furnace in the vertical orientation
using either vertical venting or down venting. When using
the alternate vent location, you must use the RF000142
vent drain kit. When installing in this conguration, please
follow the steps from the paragraph above to remove
the internal vent pipe in order to utilize the alternate vent
location.
When using the alternate venting location, either in
a horizontal left side down installation or a vertical
installation, an alternate combustion air opening can be
used. The at area located underneath the alternate vent
hole on the right side of the furnace wrapper may be used
as an alternate combustion air opening.
To use the alternate combustion air location:
1. Remove the 4 screws holding the internal combustion
air pipe from the cabinet. Remove the internal
combustion air pipe.
2. Remove the 4 screws holding the combustion air
ange & gasket from the blower deck.
3. Insert the 3” cabinet plug that was removed from the
alternate vent hole into the blower deck hole from the
burner cabinet side. Seal up the rest of the unused
combustion air holes using sheet metal squares and
then metallic tape. Please make sure to seal up the
openings really well.
4. Drill a pilot hole in the area below the vent hole (size
dictated by knockout tool used).
5. Use a knockout tool to create a 3” diameter hole.
6. Secure the combustion air ange & gasket to the
outside of the furnace cabinet using the self-tapping
screws removed in step 1.
SCALE 0:1
Flanged Pipe
RF000142
Figure 14
Figure 15
Vent/Flue Pipe Terminations
Products of combustion must always be vented outside. A
vent pipe must never terminate in an attic, crawl space, or
any other part of a dwelling. Follow the vent pipe & intake
pipe termination requirements listed below as well as all
applicable local, State and National codes.
All terminations (vent and/or intake) must be located at
least 12” above ground level or the anticipated snow level.
All vent terminations (non-direct and direct vent) must
terminate at least 3 feet above any forced air inlet located
within 10 feet.
The vent termination of a non-direct vent application must
terminate at least 4 feet below, 4 feet horizontally from, or
1 foot above any door, window, or gravity air inlet into any
building.
The vent termination of a direct vent application must
terminate at least 12” from any opening through which ue
gases may enter a building (door, window, or gravity air
inlet).
The vent termination of vent pipe run vertically through a
roof must terminate at least 12” above the roof line (or the
anticipated snow level) and be at least 12” from any
vertical wall (including any anticipated snow build up).
A vent termination shall not terminate over public walkways
or over an area where condensate or vapor could create a
nuisance or hazard or could be detrimental to the
operation of regulators, relief valves, or other equipment.
The combustion air intake termination of a direct vent
application should not terminate in an area which is
frequently dusty or dirty.
background
17
Vent & combustion air pipes may terminate vertically
through a roof, or horizontally through an outside wall. The
combustion air intake and vent pipe can be terminated
in two di󰀨erent pressure zones. The intake vent can
terminate on one side of the building, while the ue vent
can be terminated on another side of the building or
through the roof. In addition, the combustion air intake can
be terminated in a su󰀩ciently ventilated attic. Vertical vent
pipe terminations should be as shown in gure 21. The
penetration of pipes through the roof must be sealed water
tight with proper ashing such as is used with a plastic
plumbing vent.
Figure 16
Figure 17
Horizontal vent pipe terminations should be as shown in
the following gures. To secure the pipe passing through
the wall and prohibit damage to piping connections, a
coupling should be installed on either side of the wall and
solvent cemented to a length of pipe connecting the two
couplings. The length of pipe should be the wall thickness
plus the depth of the socket ttings to be installed on the
inside and outside of the wall. The wall penetration should
be sealed with silicone caulking material.
Non-Direct Vent
Vent/Flue Termination
No Terminations
Above Walkway
Non-Direct Vent
Vent/Flue Termination
Direct Vent
Vent/Flue Termination
Forced Air
Inlet
Non-Direct Vent
&
Direct Vent
Vent/Flue Terminations
Grade or Highest
Anticipated
Snow Level
Figure 18
12" MIN.
VENT/FLUE TEE (
or
45° ELBOW
TURNED DOWN or
90° ELBOW TURNED
DOWN
OPTIONAL)
Horizontal Termination (Single Pipe)
Above Highest Anticipated Snow Level
Figure 19
12" MIN. TO GRADE OR
HIGHEST ANTICIPATED
SNOW LEVEL
6” MAX
4” MIN
Standard Horizontal Terminations (Dual Pipe)
Figure 20
background
18
COMBUSTION AIR INTAKE
(OPTIONAL)
*Not required for
single pipe installation
TEE (OPTIONAL)
9
6
”
M
A
X
.
-
3
”
M
I
N.
R
O
O
F
L
I
N
E
12” MIN
HEIGHT DIFFERENCE
BETWEEN
INTAKE AND VENT
12” MIN TO ROOF OR HIGHEST
ANTICIPATED SNOW LEVEL
Figure 21
STRAIGHT
ELBOWS
Direct Vent (Dual Pipe) Piping
Figure 22
1 2 3 4 5 6 7 8
2 75 70 65 60 55 50 45 40
3 114 107 100 93 86 79 72 65
2 75 70 65 60 55 50 45 40
3 114 107 100 93 86 79 72 65
2 50 45 40 35 30 25 20 15
3 143 136 129 122 115 108 101 94
2 60 55 50 45 40 35 30 25
3 113 106 99 92 85 78 71 64
2 60 55 50 45 40 35 30 25
3 120 113 106 99 92 85 78 71
2 45 40 35 30 25 20 15 10
3 103 96 89 82 75 68 61 54
2 45 40 35 30 25 20 15 10
3 151 144 137 130 123 116 109 102
*R9T961205DN
3 185 178 171 164 157 150 143 136
2 100 95 90 85 80 75 70 65
3 110 103 96 89 82 75 68 61
2 45 40 35 30 25 20 15 10
3 110 103 96 89 82 75 68 61
2 35 30 25 20 15 10 5 NA
3 103 9
6 89 82 75 68 61 54
2 45 40 35 30 25 20 15 10
3 110 103 96 89 82 75 68 61
*R 9T96/*D9T96 Direct Vent (2 - Pipe) and Non-Direct Vent (1- Pipe)
Maximum Allowable Length of Vent/Flue Pipe
MODEL
Pipe Size
(in.)
Number of Elbows
*R9T960303AN
&
*R9T960403AN
*R9T960603AN
*R9T960603BN^
*R9T960803BN
*R9T960804CN
*R9T961004CN
*R9T961005CN
*D9T960403BN
*D9T960603BN
*D9T960803BN
*D9T961005CN
^ *R9T960603BN-add 45' of 2" pipe for upflow.
NOTE: For installations at or above 5,000 feet altitude, use 3” pipe.
background
19
90°
ELBOWS
3” - 24”
Alternate Horizontal Vent Termination (Dual Pipe)
Figure 23
VENT/FLUE
TEE
COMBUSTION
AIR INTAKE.
DISTANCE BETWEEN
COMBUSTION AIR
INTAKE AND GRADE
DISTANCE BETWEEN
VENT AND GRADE
Figure 24
Combustion Air Intake may also be snorkeled to obtain 12” min ground clearance.
90°
ELBOWS
3”-24” BETWEEN PIPES
Alternate vent termination above anticipated
snow level (dual pipe)
Figure 25
Vent/Flue and Combustion Air Pipe
Terminations
3” MIN
12” MIN TO GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL
3”MIN
24”MAX
12” MIN SEPARATION
Termination of Multiple Direct Vent Furnaces
Figure 26
Vent/Intake Terminations For Installation
of Multiple Direct Vent Furnaces
If more than one direct vent furnace is to be installed vertically
through a common roof top, maintain the same minimum
clearances between the exhaust vent and air intake termi-
nations of adjacent units as with the exhaust vent and air
intake terminations of a single unit.
If more than one direct vent furnace is to be installed horizon-
tally through a common side wall, maintain the clearances
as in the following gure. Always terminate all exhaust vent
outlets at the same elevation and always terminate all air
intakes at the same elevation.
Concentric Vent Termination
Refer to the directions provided with the Concentric Vent Kit
or IO-619 for installation specications.
Side Wall Vent Kit
This kit is to be used with 2” or 3” direct vent systems. The
vent kit must terminate outside the structure and may be in-
stalled with the intake and exhaust pipes located side-by-side
or with one pipe above the other. These kits are NOT intended
for use with single pipe (non-direct vent) installations.
Refer to the directions furnished with the Side Wall Vent
Kit (p/n 0170K00000S or 0170K00001S) for installation
specications.
Vertical Installation
Horizontal Installation
Side Wall Vent Kit
Figure 27
background
20
#
3
#1
#2
#4
#5
#
6
#7
#8
#9
#10
#11
100 Degree
Elbow
Coupling
Figure 28
NOTE: Drain components shown for information purposes
only. For horizontal installations, a Horizontal Drain Kit may be
needed. Refer to the Specications Sheet for kit part number.
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
WARNING
HIGH VOLTAGE
To avoid personal injury, electrical shock
or death, the furnace must be electrically
grounded in accordance with local codes or
in their absence, with the latest edition of the
national electric code.
Condensate Drain Lines & Drain
Trap
A condensing gas furnace achieves its high level of e󰀩cien-
cy by extracting heat from the products of combustion to
the point where condensation takes place. The condensate
must be collected in the furnace drain trap and routed to
an appropriate drain location in compliance with local and
national codes.
Follow the bullets listed below when installing the drain
system. Refer to the following sections for specic details
concerning furnace drain trap installation and drain hose
hook ups.
• The drain trap supplied with the furnace must be
used.
• The drain trap must be primed at time of
installation.
• The drain line between furnace and drain location
must meet local and national codes.
• The drain line between furnace and drain location
must maintain a 1/4 inch per foot downward slope
toward the drain.
• Do not trap the drain line in any other location
than at the drain trap supplied with the furnace.
• If the drain line is routed through an area which
may see temperatures near or below freezing,
precautions must be taken to prevent condensate
from freezing within the drain line.
• If an air conditioning coil is installed with the
furnace, a common drain may be used. An open
tee must be installed in the drain line, to relieve
positive air pressure from the coil’s plenum. This
is necessary to prohibit any interference with the
function of the furnace’s drain trap.
General Drain Information
All furnace models come with a factory installed drain trap.
For vertical installations, the trap will remain in the factory
position. All furnace models installed horizontally require
the trap to be relocated. Many drain hoses have a built–in
grommet which will provide a cabinet seal when installed. See
instructions below for your model and installation position.
NOTE: Both sides of the drain trap must be primed prior
to initial furnace start up.
Field Supplied Drain
Drain the furnace and air conditioning coil if applicable, in
compliance with code requirements. In horizontal installa-
tions, a eld installed rubber coupling will allow the drain trap
to be removed for cleaning. The drain trap must be primed
before initial furnace start up. When an air conditioning coil
drain is connected to the eld supplied furnace drain, it must
be vented with an open tee installed at a height no higher
than the bottom of the furnace collector box to prevent air
conditioning condensate from backing up into the furnace if
the common drain became blocked.
background
21
Upflow Model Installed Vertically
The trap and factory installed hoses remain as shipped.
The furnace drain may exit either the right or left side of the
furnace cabinet. Both sides of the cabinet have two .875”
diameter holes which can be used interchangeably for drain
and low voltage wiring purposes. If a higher drain exit is need-
ed, a .875” diameter hole may be added in the area shown
in Figure 30. Any unused cabinet opening must be sealed.
Do not allow drain hose to sag or trap water.
Side Cut-Out
12”
3”
Right side shown.
Acceptable
area for
drain hole.
Figure 29
Drain Exiting Right Side
1. Locate and Install the 45º pipe / hose drain coupling
from the outside of the cabinet (barbed end goes in the
cabinet) through hole in the right side of the cabinet
and secure with two eld supplied #8 self-tapping
screws (see Figure 31).
2. Locate the long drain hose #3 and cut at line “A”.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and secure
with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
Installer selects right or left side drain
and installs this hose accordingly.
Hose #1
Hose #2
45 degree
barb-pipe
adapter
45 degree
barb-pipe
adapter
Figure 30
Drain Exiting Left Side
1. Install the 45 degree pipe / hose drain coupling from
the outside of the cabinet (barbed end goes in the
cabinet) through the hole in the left side of the cabinet
and secure with two eld supplied #8 self-tapping
screws (see Figure 31).
2. Locate the long drain hose #3 and cut at “B” line for a
17.5” cabinet; cut at line “C” for a 21” cabinet; do not
cut for a “D” width cabinet.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and secure
with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on eld supplied / installed drain on outlet of furnace
trap.
Upflow Model Installed Horizontally with
Right Side Down (See Figure 31)
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
1. Remove the clamps from both ends of the drain hoses.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and two hoses from the blower deck
4. Remove the two plugs from the right side of the cabinet
and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #2 (factory
installed) and cut 1” away from the 45 degree bend,
discard the 45 degree section. Insert hose #2 from
outside the cabinet through the cabinet drain hole
nearest the top. Secure it to the barbed tting in the
elbow with a red clamp.
background
22
7. Unused vent-drain elbow drip leg port must be
sealed to prevent ue gases from escaping. Insert
the rubber plug removed in Step 6 into the unused
elbow drain port; Inserting a blunt tool such as a
3/16” Allen wrench into the center of the rubber
plug will stretch the plug and allow complete
insertion.
8. Locate hose #5 and cut 3” from the non-grommet end.
Discard the section without the grommet.
9. Insert the cut end of tube #5 through the lower cabinet
drain hole.
10. Connect hose #6 & hose #5 using 100º elbow and
secure with two red clamps.
11. (Draining the Collector Box) Remove cap from left
side collector box drain port (bottom in horizontal left
position) and install it on the right side (top) collector
box drain port.
12. Install the non-grommet end of hose #11 from outside
the cabinet in the upper drain hole. Install on collector
box and secure with a silver clamp.
13. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
14. Refer to Field Supplied Drain section for instructions on
eld supplied / installed drain on outlet of furnace trap.
Hose #6
Hose #5
Hose #11
Figure 32
Upflow Model Installed Horizontally with
Left Side Down-Alternate (See Figure 33)
*Also see Front Cover Pressure Switch Tube Location on
page 11
1. (Draining the RF000142 Coupling) Locate hose #2
(factory installed). Cut o󰀨 and discard the 45°radius end.
2. Install 90°radius end of hose #2 on RF000142 drain
outlet and secure with a red clamp.
3. Insert coupling in hose #2 and secure with a red clamp.
4. Locate hose #5 and cut 3” from the non-grommet end.
Discard the section without the grommet.
6. For models DM96VE0303AN, DM96VE0403AN and
DM96VE0603AN; locate the hose #2 (factory installed)
and cut 1.5” length from the end of the hose. Insert
hose #2 from outside the cabinet through the cabinet
drain’s hole nearest to the top. Secure it to the barbed
tting in the elbow with a red clamp.
7. (Draining the Collector Box) Install the non-grommet
end of hose #11 from outside the cabinet in the bottom
drain hole. Install on collector box and secure with a
silver clamp.
8. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
9. Refer to Field Supplied Drain section for instructions on
eld supplied / installed drain on outlet of furnace trap.
Hose #11
Hose #2
Figure 31
Upflow Model Installed Horizontally with
Left Side Down (See Figure 32)
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
*Also see Front Cover Pressure Switch Tube Location on
page 11
1. Remove the clamps from the two drain tubes on the trap.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and hoses from the blower deck.
4. Remove the two plugs from the left side of the cabinet
and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #6. Measuring
from the non-grommet end; cut o󰀨 and discard 1 ½”
for a “D” width cabinet, 5” for a “C” width cabinet, 8 ½”
for a “B” width cabinet.
6. Remove the rubber plug from vent – drain elbow side
port. Place hose #6 on the vent – drain elbow side port
and secure with a silver clamp.
background
23
5. Insert the cut end of tube #5 through the lower cabinet
drain hole.
6. Insert 100 degree elbow in the cut end of hose #5.
7. Locate hose #6. Using red clamps, connect between
the coupling and 100 degree elbow, cutting o󰀨 excess
tubing.
8. (Draining the Collector Box) Remove cap from left
side collector box drain port (bottom in horizontal left
position) and install it on right side (top) collector box
drain port.
9. Install the non-grommet end of hose #11 from outside
the cabinet in the upper drain hole. Install on collector
box and secure with a silver clamp.
10. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
Insert flange. Cut 2 ½” long.
R 000142F
Figure 33
Counterflow Model Installed Vertically
The furnace drain may exit the right or left side of the furnace
cabinet (left side preferred) Trap and factory installed hoses
remain as shipped if the drain will exit the left side of the
cabinet. Draining from the right side requires relocation of
the trap to outside the cabinet.
Drain Exiting Left Side (See Figure 34)
1. Install a eld supplied rubber coupling secured with
a 1 1/4” clamp to enable removing the trap for future
cleaning. Alternately, a PVC tting may be glued on
the trap outlet.
2. Install drain per local and National codes.
Hose #4 x 3
Hose #5
Figure 34
Drain Exiting Right Side (See Figure 35)
1. Remove hose clamps and hoses from trap.
2. Remove trap and factory installed drain tube assemblies.
3. (Draining the Vent Elbow) Insert the non-grommet end
hose #10 into the cabinet back drain hole. Insert a
coupling into the drip leg of the vent-drain elbow and
secure with a silver clamp. Secure hose #10 on vent -
drain elbow barb tting with a silver clamp.
4. (Draining the Collector Box) Insert non-grommet end of
hose #9 into the cabinet front drain hole and secure on
collector box drain port with a silver clamp.
5. Mate the drain trap inlets to the hoses and secure with
silver clamps.
6. Line up the trap mounting holes with the pre-drilled holes
in the furnace and secure with 2 screws removed in step
2.
7. Refer to Field Supplied Drain section for instructions on
eld supplied / installed drain on outlet of furnace trap.
Figure 35
background
24
Counterflow Model Installed Horizontal-
ly with Right Side Down (See Figure 36)
Minimum 5 1/2” clearance is required for the drain trap be-
neath the furnace.
NOTE: For horizontal installations, some of the required
hoses are found in the factory-installed hose assemblies.
Remove the hose clamps to obtain the respective hoses
needed for installation, and install per the following directions.
1. Remove the drain trap and factory installed drain tube
assemblies.
2. Remove two 1’’ plugs from right side of cabinet.
3. (Draining the Collector Box) From outside the cabinet,
insert the non-grommet end hose #7 into the back drain
hole and secure to collector box drain port using a silver
clamp.
4. (Draining the Vent Elbow) Insert the straight barbed
coupling into the vent - drain elbow drip leg and secure
with a red clamp.
5. From outside the cabinet, insert the non-grommet end
of hose #8 into the front cabinet drain hole and secure
on the vent - drain elbow barb tting using a red clamp.
6. Place the drain hoses on the trap inlets and secure with
silver clamps. The outlet of the trap must face the original
bottom of furnace.
7. Using the two sheet metal screws provided in the cabinet,
secure the trap to the furnace.
8. Refer to Field Supplied Drain section for instructions on
eld supplied/installed drain on outlet of furnace trap.
Hose #8
Hose #7
Hose #7
Hose #7
Figure 36
Counterflow Model Installed Horizontal-
ly with Left Side Down (See Figure 37)
*Also see Front Cover Pressure Switch Tube Location on
page 11.
Minimum 5 1/2” clearance is required for the drain trap be-
neath the furnace.
NOTE: For horizontal installations, some of the required
hoses are found in the factory-installed hose assemblies.
Remove the hose clamps to obtain the respective hoses
needed for installation, and install per the following directions.
1. Remove the factory installed drain trap and hose
assemblies. Leave the 100° elbow inserted and
clamped in the vent-drain elbow.
2. Remove two 1”plugs from left side of cabinet
3. (Draining the Collector Box) Remove the cap from
the left side of the collector box drain port (bottom in
horizontal left position) and install it on right side drain
port.
4. Place radius end of hose #4 (factory installed) on the
collector box drain port and secure with a silver clamp.
5. Insert hose #2 from outside the cabinet in the front
drain hole.
6. Connect hose #4 & hose #2 together using a straight
barbed coupling and two gold clamps (factory
installed).
7. (Draining the Vent Elbow) Remove rubber plug from
vent – drain elbow side port.
8. The unused vent-drain elbow drip leg port must be
plugged to prevent ue gases from escaping. Insert
rubber plug removed in step 7 into the 100°elbow.
(Inserting a blunt tool such as a 3/16’’ Allen wrench
into the center of the rubber plug will stretch the plug
and allow complete insertion)
9. Place radius end of hose #4 on the side port of vent
– drain elbow and secure with a gold clamp.
10. Insert a ½” diameter PVC pipe (factory installed) into
hose #4 and secure with a gold clamp.
11.Insert the non-grommet end of hose #5 (factory
installed) from outside the cabinet in the back drain
hole.
12. Insert 100º elbow in hose #5 and secure with a red
clamp.
13. Locate hose #4 and cut a cut o󰀨 a 4” straight section
and discard the radius end.
14. Connect the 4” straight section of hose #4 to the 100º
elbow and the PVC pipe and secure with red clamps.
15. Connect the hoses to the trap inlets and secure with
silver clamps, drain trap outlet must point to the original
bottom of the furnace.
16.Using the two sheet metal screws provided in the
cabinet, secure the trap to the furnace.
17. Refer to Field Supplied Drain section for instructions on
eld supplied / installed drain on outlet of furnace trap.
background
25
Hose #4
Hose #5
Hose #4
Hose #2
Figure 37
Counterflow Model Installed Horizontal-
ly with Left Side Down - Alternate
Minimum 5 1/2” clearance is required for the drain trap be-
neath the furnace
*Also see Front Cover Pressure Switch Tube Location on
page 10 and the alternate vent connections on page 15.
1. Remove the factory installed drain trap and hose
assemblies.
2. Remove two 1”plugs from left side of cabinet.
3. (Draining the Collector Box) Remove the cap from
the left side of the collector box drain port (bottom
in horizontal left position) and install it on right side
drain port.
4. Place radius end of hose #4 (factory installed) on the
collector box drain port and secure with a silver clamp.
5. Insert hose #2 from outside the cabinet in the front
drain hole.
6. Connect hose #4 & hose #2 together using a straight
barbed coupling and two gold clamps (factory
installed).
7. (Draining the RF000142 Coupling) Place radius end
of hose #4 on the uncapped port of the coupling and
secure with a gold clamp.
8. Insert a ½” diameter PVC pipe (factory installed) into
hose #4 and secure with a gold clamp.
9. Insert the non-grommet end of hose #5 (factory
installed) from outside the cabinet in the back drain
hole.
10. Insert 100º elbow in hose #5 and secure with a red
clamp.
11. Locate hose #4 and cut a cut o󰀨 a 4” straight section
and discard the radius end.
12. Connect the 4” straight section of hose #4 to the 100º
elbow and the PVC pipe and secure with red clamps.
13. Connect the hoses to the trap inlets and secure with
silver clamps, drain trap outlet must point to the original
bottom of the furnace.
14. Using the two sheet metal screws provided in the
cabinet, secure the trap to the furnace.
15. Refer to Field Supplied Drain section for instructions on
eld supplied / installed drain on outlet of furnace trap.
SCALE 0:1
Flanged Pipe
RF000142
Electrical Connections
Wiring Harness
The wiring harness is an integral part of this furnace. Wires
are color coded for identication purposes. Refer to the
wiring diagram for wire routings. If any of the original wire
as supplied with the furnace must be replaced, it must be
replaced with wiring material having a temperature rating of
at least 105° C. Any replacement wiring must be a copper
conductor.
WARNING
HIGH VOLTAGE
To avoid the risk of electrical shock, wiring
to the unit must be polarized and grounded.
WARNING
HIGH VOLTAGE
To avoid personal injury or death due to
electrical shock, disconnect electrical power
before servicing or changing any electrical
wiring.
CAUTION
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and dangerous
operation. Verify proper operation after servicing.
background
26
115 Volt Line Connections
Before proceeding with electrical connections, ensure that
the supply voltage, frequency, and phase correspond to that
specied on the unit rating plate. Power supply to the furnace
must be NEC Class 1, and must comply with all applicable
codes. The furnace must be electrically grounded in accor-
dance with local codes or, in their absence, with the latest
edition of The National Electric Code, ANSI NFPA 70 and /
or The Canadian Electric Code CSA C22.1.
Use a separate fused branch electrical circuit containing prop-
erly sized wire, and fuse or circuit breaker. The fuse or circuit
breaker must be sized in accordance with the maximum
overcurrent protection specied on the unit rating plate. An
electrical disconnect must be provided at the furnace location.
Connect hot, neutral, and ground wires as shown in the wir-
ing diagram located on the unit’s blower door. Metal conduit
is not considered a substitute for an actual ground wire to
the unit. For direct vent applications, the cabinet opening to
the junction box must be sealed air tight using either a UL
approved bushing such as Heyco Liquid Tight or by applying
non-reactive UL approved sealant to bushing.
Line polarity must be observed when making eld connec-
tions. Line voltage connections can be made through either
the right or left side panel. The furnace is shipped congured
for a left side electrical connection with the junction box
located inside the burner compartment. To make electri-
cal connections through the opposite side of the furnace,
the junction box must be relocated to the other side of the
burner compartment prior to making electrical connections.
To relocate the junction box, follow the steps shown below.
NOTE: Wire routing must not interfere with circulator blower
operation, lter removal, or routine maintenance.
Junction Box Relocation
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a
precaution when removing hole plugs.
WARNING
HIGH VOLTAGE
To avoid the risk of injury, electrical shock
or death, the furnace must be electrically
grounded in accordance with local codes or
in their absence, with the latest edition of the
National Electrical Code.
Line voltage connections can be made through either the
right or left side panel. The furnace is shipped congured
for a left side electrical connection. To make electrical
connections through the opposite side of the furnace, the
junction box must be relocated to the left side prior to making
electrical connections. To relocate the junction box, perform
the following steps.
1. Remove the burner compartment door.
2. Remove and save the two screws securing the junction
box to the side panel.
3. Relocate junction box and associated plugs and
grommets to opposite side panel. Secure with screws
removed in step 2.
To ensure proper unit grounding, the ground wire should run
from the furnace ground screw located inside the furnace
junction box all the way back to the electrical panel. NOTE:
Do not use gas piping as an electrical ground. To conrm
proper unit grounding, turn o󰀨 the electrical power and per-
form the following check.
1. Measure resistance between the neutral (white)
connection and one of the burners.
2. Resistance should measure 10 ohms or less.
This furnace is equipped with a blower door interlock switch
which interrupts unit voltage when the blower door is opened
for servicing. Do not defeat this switch.
24 Volt Thermostat Wiring
WIRE ROUTING MUST NOT INTERFERE WITH CIRCULATOR BLOWER
OPERATION, FILTER REMOVAL OR ROUTINE MAINTENANCE.
IMPORTANT NOTE
Low voltage connections can be made through either the
right or left side panel. Thermostat wiring entrance holes
are located in the blower compartment. The following gure
shows connections for a “heat/cool system”.
This furnace is equipped with a 40 VA transformer to facilitate
use with most cooling equipment. Consult the wiring diagram,
located on the blower compartment door, for further details
of 115 Volt and 24 Volt wiring.
Thermostat - Single -Stage Heating with Single-Stage
Cooling
NOTE: To apply a single-stage Heating Thermostat, the thermostat
selector switch on the Integrated Control Module must be set on
single-stage.
Figure 38
WARNING
TO PREVENT PERSONAL INJURY OR DEATH DUE TO ELECTRIC
SHOCK, DISCONNECT ELECTRICAL POWER BEFORE INSTALL-
ING OR SERVICING THIS UNIT.
background
27
Y
C
Y
C
G
R
W/W1
Y2
Y/Y1
C
G
R
W/W1
W2
ROOM THERMOSTAT
INTEGRATED FURNACE
CONTROL MODULE
REMOTE COOLING UNI
T
(SINGLE STAGE)
W2
Thermostat - Two-Stage Heang with Single-Stage Cooling
Thermostat - Two-Stage Heating with Single-Stage Cooling
Figure 39
Thermostat - Two-Stage Heang with Two-Stage Cooling
Y1
C
Y1C
G
R
W1
Y2
Y/Y1
C
G
R
W/W1
W2
ROOM THERMOSTAT
INTEGRATED FURNACE
CONTROL MODULE
REMOTE COOLING UNI
T
(TWO STAGE)
W2
Y2
Y2
Thermostat - Two-Stage Heating with Two-Stage Cooling
Thermostat Wiring Diagrams
Figure 40
Single-Stage Heating Thermostat
Application
A single-stage heating thermostat may be used to control
this furnace, however the furnace is setup by default to use a
two-stage heating thermostat. To use a single stage heating
thermostat the installer must make the desired selections
in the user menus using the push button switches on the
control board.
When a single stage heating thermostat is used there are
two options for controlling the timed transition from low to
high re: 1) Auto 2) Fixed Time
• Press the Left or Right menu switch to get to the A H S
menu.
• The menu will display these options; no 10 20 30 60 AUt
• Fixed time options are expressed in minutes on the
display as;10 20 30 60.
• If AUt (Automatic) is selected, the actual timing for the
transition to 2nd stage heat will be calculated by the
control board based on length of run time of previous
heating cycles (duty cycle).
• Press the center switch to save the selection.
In Auto mode, the transition to 2nd stage heat will vary be-
tween 1 to 12 minutes
Duty Cycle %
Timing to 2nd
Stage Gas Heat
Demand
0-38 12 minutes Light
39-50 10 minutes
Light to
Average
51-62 7 minutes Average
63-75 5 minutes
Average
to Heavy
76-88 3 minutes Heavy
89-100 1 minutes Heavy
Fossil Fuel Applications
This furnace can be used in conjunction with a heat pump
in a fossil fuel application. A fossil fuel application refers to
a combined gas furnace and heat pump installation which
uses an outdoor temperature sensor to determine the most
cost e󰀩cient means of heating (heat pump or gas furnace).
A heat pump thermostat with three stages of heat is required
to properly use a two-stage furnace in conjunction with a heat
pump. Refer to the fossil fuel kit installation instructions for
additional thermostat requirements.
Strictly follow the wiring guidelines in the fossil fuel kit instal-
lation instructions. All furnace connections must be made
to the furnace two-stage integrated control module and the
“FURNACE” terminal strip on the fossil fuel control board.
Twinning
For Furnace Twinning information, please refer to the Furnace
Twinning installation manual IO-2001. Please scan the QR
code below to open the document.
WARNING
All accessories that may become a potential ignition source
if installed, such as electronic air cleaners, must only be
powered through a daikin accessory control board kit. If an
electronic air cleaner is already installed in the duct work
and not connected to the accessory control board, it will
have to be disabled or removed. Ensure that any additional
wiring from the indoor unit to the accessory control board
is routed and protected from damage and wear, avoiding the
flue pipe and any joints that may need brazed or disconnected
for service. Refer to the product specification sheet for the
accessory control board kit part number.
background
28
115 Volt Line Connection of Accessories
(Humidifier and Electronic Air Cleaner)
The furnace integrated control module is equipped with line
voltage accessory terminals for controlling power to an op-
tional eld-supplied humidier and/or electronic air cleaner.
The accessory load specications are noted in the chart
below:
Humidifier
1.0 Amp maximum at 120 VAC
Electronic Air Cleaner
1.0 Amp maximum at 120 VAC
Turn OFF power to the furnace before installing any acces-
sories. Follow the humidier or air cleaner manufacturers’
instructions for locating, mounting, grounding, and controlling
these accessories. Accessory wiring connections are to be
made through the 1/4” quick connect terminals provided on
the furnace integrated control module. The humidier and
electronic air cleaner hot terminals are identied as HUM H
and EAC H. The humidier and electronic air cleaner neutral
terminals are identied as NEUTRAL. All eld wiring must
conform to applicable codes. Connections should be made
as shown.
If it is necessary for the installer to supply additional line
voltage wiring to the inside of the furnace, the wiring must
conform to all local codes, and have a minimum temperature
rating of 105°C. All line voltage wire splices must be made
inside the furnace junction box.
The integrated control module humidier terminal (HUM
H) is energized with 115 volts whenever the induced draft
blower is energized. The integrated control module electron-
ic air cleaner terminal (EAC H) is energized with 115 volts
whenever the circulator blower is energized. This terminal
can also be used to provide 115 volt power to a humidier
transformer. The remaining primary transformer wire would
be connected to the Line N on the control board.
WARNING
HIGH VOLTAGE
To avoid personal injury or death due to
electrical shock, disconnect electrical power
before servicing or changing any electrical
wiring.
115 VAC HUM
115 VAC EAC
115 VAC Accessories - Accessories Wiring
Figure 41
24 Volt Humidifier ConneCtion
The furnace integrated control module is equipped with
a low voltage terminal for providing power to an optional
eld-supplied 24 volt humidier. The 24V HUM terminal is
energized any time the draft inducer is powered. See con-
nection diagram below.
Note: This is a 24 volt circuit only, the common connection
must be on C terminal of the low voltage terminal strip (where
thermostat wires are connected). Wiring for this circuit must
NOT be connected to the line N location where line voltage
neutral wires are connected.
Low Voltage Ventilation
The Ventilation connections provide a dry contact for eld
ventilator wiring connections. These connections are normally
open and energize during the R-32 fault/alarm condition. VT
IN and a VT OUT connections are provided on the control
board and are shown in the image below.
Low Voltage A2L Alarm
The A2L alarm connection provides 24VAC for eld alarm
wiring connections. These connections are normally open
and energize during the R-32 fault/alarm condition. An A2L
Alarm connection is provided on the control board and is
shown in the image below.
Field Installed Accessories
Additional accessories that do not have dedicated
terminals on the furnace control board may require an
additional daughter board to be installed. Please refer to
service manual on your product for more information.
background
29
24 VOLT HUM. &
HUMIDISTAT
24 VOLT VENTILATION
(OPTIONAL)
24 VOLT A2L ALARM
(OPTIONAL))
R-32
SENSOR
Accessories - Accessories Wiring
Figure 42
Gas Supply and Piping
WARNING
To avoid possible unsatisfactory operation of equipment or
damage due to underfiring of equipment, use the proper size
of natural/propane gas piping needed when running pipe from
the meter/tank to the furnace.
Natural Gas Minimum: 4.5" w.c. Maximum: 10.0" w.c.
Propane Gas Minimum: 11.0" w.c. Maximum: 13.0" w.c.
INLET GAS SUPPLY PRESSURE
The furnace rating plate includes the approved furnace gas
input rating and gas types. The furnace must be equipped
to operate on the type of gas applied. This includes any con-
version kits required for alternate fuels and/or high altitude.
Inlet gas supply pressures must be maintained within the
ranges specied in the adjacent table. The supply pressure
must be constant and available with all other household gas
red appliances operating. The minimum gas supply pres-
sure must be maintained to prevent unreliable ignition. The
maximum must not be exceeded to prevent unit overring.
Propane Gas/High Altitude
Installations
WARNING
Possible property damage, personal injury or death may
occur if the correct conversion kits are not installed. The
appropriate kits must be applied to ensure safe and proper
furnace operation. All conversions must be performed by a
qualified installer or service agency.
This furnace is shipped from the factory congured for natural
gas at standard altitude. Propane gas installations require
an orice and spring change to compensate for the energy
content di󰀨erence between natural and propane gas.
High altitude installations may require both a pressure switch
and an orice/spring change. These changes are necessary
to compensate for the natural reduction in the density of both
the gas fuel and the combustion air at higher altitude.
If converting to LP gas, a low pressure switch should be
installed per the LP kit. This low pressure switch will prevent
the furnace from ring when the LP gas supply pressure is
too low to support proper combustion.
Installation of this furnace at altitudes above 7000 ft (2134 m)
shall be made in accordance with the Listed High Altitude
Conversion Kit available with this furnace.”
L'installation de ce générateur de chaleur à des altitudes
supérieures à 7000 pi (2134 m) doit être effectuée
conformément aux instructions accompagnant la trousse de
conversion pour haute altitude fournie avec cet appareil.
For installations above 7000 feet, please refer to the
furnace Specication Sheets for required kit(s).
Contact the distributor for a tabular listing of appropriate
manufacturer’s kits for propane gas and/or high altitude
installations. The indicated kits must be used to insure safe
and proper furnace operation. All conversions must be per-
formed by a qualied installer, or service agency.
HIGH STAGE LOW STAGE
#45 (1)
#50 (2)
LPM-34 (1) 1.25MM (1)
LPM-30* (2) #57 (2)
PRESSURE
SWITCH
(1) FOR USE WITH ALL MODELS EXCEPT *R9T960303AN
ALTITUDE KIT ORIFICE
MANIFOLD PRESSURE
3.5" w.c. 1.9" w.c.
0 - 7000
PROPANE
NATURAL NONE
GAS
10.0" w.c. 6.0" w.c.
NONE
NONE
(2) FOR USE WITH ONLY *R9T960303AN
High Altitude Derate
When this furnace is installed at high altitude, the ap-
propriate High Altitude orice kit must be applied. This is
required due to the natural reduction in the density of both
the gas fuel and combustion air as altitude increases. The
kit will provide the proper design certied input rate within
the specied altitude range.
High altitude kits are purchased according to the installation
altitude and usage of either natural or propane gas. Consult
the furnace Specication Sheet for appropriate kits.
Do not derate the furnace by adjusting the manifold pressure
to a lower pressure than specied on the furnace rating plate.
The combination of the lower air density and a lower manifold
pressure will prohibit the burner orice from drawing the prop-
er amount of air into the burner. This may cause incomplete
combustion, ashback, and possible yellow tipping.
background
30
In some areas the gas supplier may articially derate the gas
in an e󰀨ort to compensate for the e󰀨ects of altitude. If the
gas is articially derated, the appropriate orice size must be
determined based upon the BTU/ft
3
content of the derated
gas and the altitude. Refer to the National Fuel Gas Code,
NFPA 54/ANSI Z223.1, and information provided by the gas
supplier to determine the proper orice size.
A di󰀨erent pressure switch may be required at high altitude
regardless of the BTU/ft
3
content of the fuel used. Consult
the furnace Specication Sheet for pressure switch.
Gas Valve
This unit is equipped with a 24 volt gas valve controlled
during furnace operation by the integrated control module.
As shipped, the valve is congured for natural gas. The
valve is eld convertible for use with propane gas by re-
placing the regulator spring with a propane gas spring from
an appropriate manufacturer’s propane gas conversion kit.
Taps for measuring the gas supply pressure and manifold
pressure are provided on the valve.
The gas valve has a manual ON/OFF control located on the
valve itself. This control may be set only to the “ON” or “OFF”
position. Refer to the lighting instructions label or Startup
Procedure & Adjustment for use of this control during start
up and shut down periods.
Gas Piping Connections
The gas piping supplying the furnace must be properly sized
based on the gas ow required, specic gravity of the gas,
and length of the run. The gas line installation must comply
with local codes, or in their absence, with the latest edition of
the National Fuel Gas Code, NFPA 54/ANSI Z223.1.
To connect the furnace to the building’s gas piping, the install-
er must supply a ground joint union, drip leg, manual shuto󰀨
valve, and line and ttings to connect to gas valve. In some
cases, the installer may also need to supply a transition piece
from 1/2” pipe to a larger pipe size.
The following stipulations apply when connecting gas piping.
Refer to Gas Piping Connections gure for typical gas line
connections to the furnace.
• Gas piping must be supported external to the furnace
cabinet so that the weight of the gas line does not
distort the burner rack, manifold or gas valve.
• Use black iron or steel pipe and ttings for building
piping. Where possible, use new pipe that is properly
chamfered, reamed, and free of burrs and chips. If old
pipe is used, be sure it is clean and free of rust, scale,
burrs, chips, and old pipe joint compound.
• Use pipe joint compound on male threads ONLY.
Always use pipe joint compound (pipe dope) that
is APPROVED FOR ALL GASES. DO NOT apply
compound to the rst two threads.
• Use ground joint unions.
• Install a drip leg to trap dirt and moisture before it can
enter the gas valve. The drip leg must be a minimum
of three inches long.
WARNING
Possible property damage, personal injury or death may
occur if the correct conversion kits are not installed. The
appropriate kits must be applied to ensure safe and proper
furnace operation. All conversions must be performed by a
qualified installer or service agency.
Natural Gas Capacity of Pipe
In Cubic Feet of Gas Per Hour (CFH)
Length of Nominal Black Pipe Size
Pipe in Feet 1/2" 3/4" 1" 1 1/4" 1 1/2"
10 132 278 520 1050 1600
20 92 190 350 730 1100
30 73 152 285 590 980
40 63 130 245 500 760
50 56 115 215 440 670
60 50 105 195 400 610
70 46 96 180 370 560
80 43 90 170 350 530
90 40 84 160 320 490
100 38 79 150 305 460
(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on
0.60 Specific Gravity Gas)
CFH =
BTUH Furnace Input
Heating Value of Gas (BTU/Cubic Foot)
• Install a 1/8” NPT pipe plug tting, accessible for test
gage connection, immediately upstream of the gas
supply connection to the furnace.
• Always use a back-up wrench when making the
connection to the gas valve to keep it from turning.
The orientation of the gas valve on the manifold
must be maintained as shipped from the factory.
Maximum torque for the gas valve connection is 375
in-lbs; excessive over-tightening may damage the
gas valve.
• Install a manual shuto󰀨 valve between the gas meter
and unit within six feet of the unit. If a union is installed,
the union must be downstream of the manual shuto󰀨
valve, between the shuto󰀨 valve and the furnace.
• Tighten all joints securely.
• Connect the furnace to the building piping by one of
the following methods:
– Rigid metallic pipe and ttings.
– Semi-rigid metallic tubing and metallic ttings.
Aluminum alloy tubing must not be used in exterior
locations. In order to seal the grommet cabinet
penetration, rigid pipe must be used to reach the
outside of the cabinet. A semi-rigid connector to
the gas piping may be used from there.
• Use listed gas appliance connectors in accordance
with their instructions. Connectors must be fully in
the same room as the furnace.
• Protect connectors and semirigid tubing against
physical and thermal damage when installed. Ensure
aluminum-alloy tubing and connectors are coated to
protect against external corrosion when in contact
with masonry, plaster, or insulation, or subjected to
repeated wetting by liquids such as water (except rain
water), detergents, or sewage.
background
31
The gas piping may enter the left or right side of the furnace
cabinet. The installer must supply rigid pipe long enough to
reach the outside of the cabinet to seal the grommet cabinet
penetration. A semi-rigid connector to the gas piping can be
used outside the cabinet per local codes. 1/2” NPT pipe and
ttings are required. For models with an “L” shaped mani-
fold, a 4 1/2” long nipple is required. For models with a hook
shaped manifold, a 2” long nipple is required.
A semi-rigid connector to the gas piping can be used outside
the cabinet per local codes. From the elbow, the length of pipe
and the ttings required will vary by the side chosen, location
of union and cabinet width. The union may be placed inside
or outside of the cabinet.
Alternate
Gas Line
Location
Gas Valve
Burners
Manual Shut Off Valve
(upstream from
ground joint
pipe union)
Drip Leg
Grommet
in Standard
Gas Line
Hole
*Ground
Joint
Pipe
Union
*Ground
Joint
Pipe
Union
*NOTE: Union may be inside furnace cabinet where allowed by local codes.
Manifold
UPFLOW
Figure 43
Gas Connections
WARNING
TO AVOID THE POSSIBILITY OF EXPLOSION OR FIRE, NEVER
USE A MATCH OR OPEN FLAME TO TEST FOR LEAKS.
Gas Piping Checks
Before placing unit in operation, leak test the unit and gas
connections.
Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector, or
other approved testing methods.
NOTE: Never exceed specied pressures for testing. Higher
pressure may damage the gas valve and cause subsequent
overring, resulting in heat exchanger failure.
Disconnect this unit and shuto󰀨 valve from the gas supply
piping system before pressure testing the supply piping sys-
tem with pressures in excess of 1/2 psig (3.48 kPa).
Isolate this unit from the gas supply piping system by closing
its external manual gas shuto󰀨 valve before pressure testing
supply piping system with test pressures equal to or less than
1/2 psig (3.48 kPA).
Propane Gas Tanks and Piping
WARNING
If the gas furnace is installed in a basement, an excavated
area or confined space, it is strongly recommended to
contact a propane supplier to install a gas detecting warning
device in case of a gas leak.
• Since propane gas is heavier than air, any leaking gas
can settle in any low areas or confined spaces.
• Propane gas odorant may fade, making the gas
undetectable except with a warning device.
A gas detecting warning system is the only reliable way to de-
tect a propane gas leak. Rust can reduce the level of odorant
in propane gas. Do not rely on your sense of smell. Contact
a local propane gas supplier about installing a gas detecting
warning system. If the presence of gas is suspected, follow
the instructions listed in the Safety Considerations section
of this manual.
All propane gas equipment must conform to the safety stan-
dards of the National Fire Protection Association, NFPA 58.
For satisfactory operation, propane gas pressure must be
10” WC at the furnace manifold with all gas appli ances in
operation. Maintaining proper gas pressure depends on
three main factors:
1. Vaporization rate, depending on temperature of the
liquid, and “wetted surface” area of the con tainer or
containers.
2. Proper pressure regulation. (Two-stage regulation is
recommended for both cost and e󰀩ciency).
3. Pressure drop in lines between regulators, and
between second stage regulator and the appliance.
Pipe size will depend on length of pipe run and total
load of all appliances.
Complete information regarding tank sizing for vaporiza-
tion, recommended regulator settings, and pipe sizing is
available from most regulator manufacturers and propane
gas suppliers.
Since propane gas will quickly dissolve white lead and most
standard com mercial compounds, special pipe dope must
be used. Always use a pipe thread sealant approved for all
gases.
Refer to the illustration for typical propane gas installations
and piping.
200 PSIG
Maximum
5 to 15 PSIG
(20 PSIG Max.)
Continuous
11" W.C.
Second Stage
Regulator
First Stage
Regulator
Propane Gas Installation (Typ.)
Figure 44
background
32
Circulating Air & Filters
Duct work - Air Flow
Duct systems and register sizes must be properly designed
for the CFM and external static pressure rat ing of the furnace.
Design the ductwork in accor dance with the recommended
methods of “Air Conditioning Contractors of America” Manual D.
Install the duct system in accordance with Standards of the
National Fire Protection Association, NFPA 90A and 90B.
A closed return duct system must be used, with the return duct
connected to the furnace. NOTE: Ductwork must never be
attached to the back of the furnace. For upow installations
requiring 1600 CFM or more, use either two side returns or
bottom return or a combination of side /bottom to help reduce
noise and provide smoother airow for heating. Flexible joints
may be used for supply and return con nections to reduce
noise transmission. To prevent the blower from inter fering
with combustion air or draft when a central return is used, a
connecting duct must be installed between the unit and the
utility room wall. Never use a room, closet, or alcove as a
return air chamber.
2"
NOTE:
RAISE FURNACE BY AT LEAST 2"
FROM THE MAX LEVEL OF OVER
FLOW WATER IN CONDENSATE
OVERFLOW DRAIN PAN.
RETURN AIR DUCT
PLEASE ENSURE THE
BOTTOM OF FURNACE
IS SEALED PROPERLY
IF SIDE RETURN
DUCTS ARE USED
DRAIN PIPE
CONDENSATE OVERFLOW
DRAIN PAN
BLOCK AT EACH CORNER
UNDERNEATH THE FURNACE
Checking Duct Static
Refer to your furnace rating plate for the maximum ESP
(external duct static) rating.
WARNING
Never allow the products of combustion, including carbon
monoxide, to enter the return ductwork or circulation air
supply.
Total external static refers to everything external to the fur-
nace cabinet. Cooling coils, lters, ducts, grilles, registers
must all be considered when reading your total external static
pressure. The supply duct pressure must be read between
the furnace and the cooling coil.
This reading is usually taken by removing the “A” shaped
block o󰀨 plate from the end on the coil; drilling a test hole
in it and reinstalling the block o󰀨 plate. Take a duct static
reading at the test hole. Tape up the test hole after your test
is complete. The negative pressure must be read between
the lter and the furnace blower.
Too much external static pressure will result in insu󰀩cient air
that can cause excessive temperature rise. This can cause
limit switch tripping and heat exchanger failure.
To determine total external duct static pressure, proceed as
follows;
1. With clean lters in the furnace, use a manometer to
measure the static pressure of the return duct at the inlet
of the furnace. (Negative Pressure)
2. Measure the static pressure of the supply duct. (Positive
Pressure)
3. The di󰀨erence between the two numbers is the total
external static pressure.
Example:
static reading from return duct = -.1” w.c.
static reading from supply duct = .3” w.c.
total external static pressure on this system = .4” w.c.
NOTE: Both readings may be taken simultaneously and read
directly on the manometer if so desired. If an air conditioner
coil or Electronic Air Cleaner is used in conjunction with the
furnace, the readings must also include these components,
as shown in the following drawing.
4. Consult proper tables for the quantity of air.
If the total external static pressure exceeds the maximum
listed on the furnace rating plate, check for closed dampers,
registers, undersized and/or oversized poorly laid out duct
work.
The temperature rise of the furnace must be within the tem-
perature rise range listed on the furnace rating plate.
Checking Static Pressure
Figure 45
WARNING
Edges of sheet metal holes may be sharp. Use gloves as
a precaution when removing sheet metal from return air
openings.
background
33
Bottom Return Air Opening
[Upflow Models]
The bottom return air opening on upow models utilizes a
“lance and cut” method to remove sheet metal from the duct
opening in the base pan. To remove, simply press out the
lanced sections by hand to expose the metal strips retaining
the sheet metal over the duct opening. Using tin snips, cut
the metal strips and remove the sheet metal covering the
duct opening. In the corners of the opening, cut the sheet
metal along the scribe lines to free the duct anges. Using
the scribe line along the duct ange as a guide, unfold the
duct anges around the perimeter of the opening using a pair
of seamer pliers or seamer tongs.
NOTE: Airow area will be reduced by approximately 18% if
duct anges are not unfolded. This could cause performance
issues and noise issues.
When the furnace is used in connection with a cooling unit,
the furnace should be installed upstream of the cooling coil.
When the furnace is installed without a cooling coil, it is rec-
ommended that a removable access panel be provided in the
outlet air duct. This opening shall be accessible when the
furnace is installed and shall be of such a size that the heat
exchanger can be viewed for visual light inspection or such
that a sampling probe can be inserted into the airstream.
The access panel must be made to prevent air leaks when
the furnace is in operation.
When the furnace is heating, the temperature of the return
air entering the furnace must be between 55°F and 100°F.
CUT FOUR CORNERS
AFTER REMOVING SHEET
METAL
CUT USING TIN SNIPS
PRESS OUT BY HAND
SCRIBE LINES OUTLINING
DUCT FLANGES
Duct Flange Cut Outs
Figure 46
Filters - Read This Section Before Installing
The Return Air Duct work
Filters must be used with this furnace. Discuss lter maintenance
with the building owner. Filters do not ship with this furnace, but
must be provided, sized and installed externally by the installer.
Filters must comply with UL900 or CAN/ULCS111 standards.
Damage or repairs due to the installation of the furnace
without lters is not covered under the warranty.
On upow units, guide dimples locate the side return cutout
locations. Use a straight edge to scribe lines connecting the dim-
ples. Cut out the opening on these lines. NOTE: An undersized
opening will cause reduced airow.
Refer to the following table to determine lter area require-
ments.
Upflow Models Minimum Recommended Filter Size
*R9T960303AN 1 - 16 X 25 Side or 1 - 14 X 24 Bo�om Return
*R9T960403AN 1 - 16 X 25 Side or 1 - 14 X 24 Bo�om Return
*R9T960603AN 1 - 16 X 25 Side or 14 X 24 Bo�om Return
*R9T960603BN 1 - 16 X 25 Side or Bo�om Return
*R9T960803BN 1 - 16 X 25 Side or Bo�om Return
*R9T960804CN 1 - 16 X 25 Side or Bo�om Return
*R9T961004CN 2 - 16 X 25 Side or 1 - 20 X 25 Bo�om Return
*R9T961005CN 2 - 16 X 25 Side or 1 - 20 X 25 Bo�om Return
*R9T961205DN 2 - 16 X 25 Side or 1 - 24 X 24 Bo�om Return
Downflow Models
*D9T960403BN 2 - 10 X 20 or 1 - 14 X 25 Top Return
*D9T960603BN 2 - 10 X 20 or 1 - 14 X 25 Top Return
*D9T960803BN 2 - 14 X 20 or 1 - 16 X 25 Top Return
*D9T961005CN 2 - 14 X 20 or 1 - 20 X 25 Top Return
¹ = Use 2 - 16 X 25 filters and two side returns or 20 X 25 filter on bo�om
return if furnace is connected to a cooling unit over 4 tons nominal capacity
Larger filters may be used, filters may also be centrally located
A combina�on of one side & bo�om may be used instead of both sides
Change lters before occupants take ownership of a
new home!
Upright Installations
Depending on the installation and/or customer preference, di󰀨er-
ing lter arrangements can be applied. Filters can be installed
in the central return register or a side panel external lter rack
kit (upows). As an alternative a media air lter or electronic air
cleaner can be used as the requested lter. Consider installing
an air cleaner with deep-pleated media lter at the time of
furnace installation. A deep-pleated lter with a MERV rating
of 8 (minimum) will often provide better ltration to protect
equipment and the air distribution system than a standard 1”
lter and often has lower static pressure loss than a 1” lter.
Also a deep-pleated lter will typically require less frequent
replacement intervals. Avoid using highly restrictive 1” lters
which produce static pressure loss greater than .25” W.C. In
some installations the minimum lter size required will not
lend itself to a lter installation on the side of the furnace.
The installation of a centrally installed air cleaner cabinet
or a return duct lter installation may o󰀨er more practicality.
Clean Comfort™ brand MERV 11 air cleaners have 5¼”
media lters and are available in the following congura-
tions. Consult your distributor for information on our com-
plete line of IAQ Clean Comfort™ products.
The gure below shows possible lter locations.
background
34
Horizontal Installations
Filters must be installed in either the central return register or in
the return air duct work.
FILTER
AIR FLOW
CENTRAL
RETURN
GRILLE
FILTER
SIDE RETURN
EXTERNAL FILTER
RACK KIT
(EITHER SIDE)
Figure 47
Startup Procedure & Adjustment
Furnace must have a 115 VAC power supply properly con-
nected and grounded. Proper polarity must be maintained
for correct operation. In addition to the following start-up and
adjustment items, refer to further information in Operational
Checks section.
Furnace Cabinet
Check that all furnace cabinet sealing components are in
place (plugs, grommets, gaskets).
NOTE: If the furnace bottom panel has not been removed
for a return duct connection, all perforations must be sealed
with duct sealant compound or other suitable method to
prevent air leakage. For optimal performance verify that all
door gaskets are properly in place and replace as needed
to prevent air leakage.
Drain Trap Priming
The drain trap MUST be primed prior to furnace startup. To
prime, ll both sides of the drain trap with water. This ensures
proper furnace drainage upon startup and prohibits the
possibility of ue gases escaping through the drain system.
Furnace Operation
Purge gas lines of air prior to startup. Be sure not to purge
lines into an enclosed burner compartment.
Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector, or
other approved method. Verify that all required kits (propane
gas, high altitude, etc.) have been appropriately installed.
NOTE: This furnace is equipped with a control board
that is capable of monitoring for R-32 refrigerant leaks
in the indoor evaporator coil. Please verify that the R-32
sensor wire is plugged in to the furnace control board
before startup, if applicable. If furnace is not paired with
an R-32 Refrigeration system, the default settings in the
furnace control board will need to be changed. Please
see the R-32 section for additional information.
Furnace Startup
1. Close the manual gas shuto󰀨 valve external to the
furnace.
2. Turn o󰀨 the electrical power to the furnace.
3. Set the room thermostat to the lowest possible setting.
4. Remove the burner compartment door.
NOTE: This furnace is equipped with an ignition device
which automatically lights the burner. Do not try to light the
burner by hand.
5. Move the furnace gas valve manual control to the OFF
position.
6. Wait ve minutes then smell for gas. Be sure to check
near the oor as some types of gas are heavier than
air.
7. If you smell gas after ve minutes, immediately follow
the Safety Considerations on page 2 of this manual.
If you do not smell gas after ve minutes, move the
furnace gas valve manual control to the ON position.
8. Replace the burner compartment door.
9. Open the manual gas shuto󰀨 valve external to the
furnace.
10. Turn on the electrical power to the furnace.
11. Adjust the thermostat to a setting above room
temperature.
12. After the burners are lit, set the thermostat to desired
temperature.
Furnace Shutdown
1. Set the thermostat to the lowest setting.
The integrated control will close the gas valve and
extinguish ame. Following a 15 second delay, the
induced draft blower will be de-energized. The
circulator blower will shut o󰀨 after the time delay
expires (selectable 90, 120, 150, 180 seconds).
2. Remove the burner compartment door and move the
furnace gas valve manual control to the OFF position.
3. Close the manual gas shuto󰀨 valve external to the
furnace.
4. Replace the burner compartment door.
Gas Supply Pressure Measurement
Gas Pressure Test
The line pressure supplied to the gas valve must be within
the range specied below. The supply pressure can be mea-
sured at the gas valve inlet pressure tap or at a hose tting
installed in the gas piping drip leg. The supply pressure must
be measured with the burners operating. To measure the gas
supply pressure, use the following procedure.
1. Turn OFF gas to furnace at the manual gas shuto󰀨
valve external to the furnace.
2. Connect a calibrated manometer (or appropriate gas
pressure gauge) at either the gas valve inlet pressure
tap or the gas piping drip leg. See White-Rodgers
36J54 gas valve gure for location of inlet pressure
tap.
background
35
NOTE: If measuring gas pressure at the drip leg, a eld-
supplied hose barb tting must be installed prior to making
the hose connection. If using the inlet pressure tap on the
White-Rodgers 36J54 gas valve, then use the 36G/J Valve
Pressure Check Kit, Part No. 0151K00000S.
3. Turn ON the gas supply and operate the furnace and
all other gas consuming appliances on the same gas
supply line.
4. Measure furnace gas supply pressure with burners
firing. Supply pressure must be within the range
specied in the Inlet Gas Supply Pressure table.
If supply pressure di󰀨ers from table, make the necessary
adjustments to pressure regulator, gas piping size, etc., and/
or consult with local gas utility.
5. Turn OFF gas to furnace at the manual shuto󰀨 valve
and disconnect manometer. Reinstall plug before
turning on gas to furnace.
6. Turn OFF any unnecessary gas appliances stated in
step 3.
INLET GAS SUPPLY PRESSURE
Natural Gas Minimum: 4.5” w.c. Maximum: 10.0” w.c.
Propane Gas Minimum: 11.0” w.c. Maximum: 13.0” w.c.
Inlet Gas Pressure
Gas Manifold Pressure Measurement and
Adjustment
CAUTION
To prevent unreliable operation or equipment damage,
the gas manifold pressure must be as specified on the unit
rating plate. Only minor adjustments should be made by
adjusting the gas valve pressure regulator.
Only small variations in gas pressure should be made by
adjusting the gas valve pressure regulator. The manifold
pressure must be measured with the burners operating. To
measure and adjust the manifold pressure, use the following
procedure.
1. Turn OFF gas to furnace at the manual gas shuto󰀨
valve external to the furnace.
2. Turn o󰀨 all electrical power to the system.
3. Outlet pressure tap connections:
White-Rodgers 36J54 valve: Back outlet pressure
test screw (inlet/outlet pressure tap) out one turn
(counterclockwise, not more than one turn).
4. Attach a hose and manometer to the outlet pressure
tap (White-Rodgers valve).
5. Turn ON the gas supply.
6. Turn on power and close thermostat “R” and “W1”
contacts to provide a call for low stage heat.
7. Measure the gas manifold pressure with burners ring.
Adjust manifold pressure using the Manifold Gas
Pressure table shown below.
ManifoldGasPressureChart
Gas Range Nominal
Natural 3.2 - 3.8" w.c. 3.5" w.c.
Propane 9.7 - 10.3" w.c. 10.0" w.c.
Manifold Gas Pressure
8. Remove regulator cover screw from the low (LO)
outlet pressure regulator adjust tower and turn screw
clockwise to increase pressure or counterclockwise to
decrease pressure. Replace regulator cover screw.
9. Close thermostat “R”, “W1” and “W2” contacts to
provide a call for high stage heat.
10. Remove regulator cover screw from the high (HI)
outlet pressure regulator adjust tower and turn screw
clockwise to increase pressure or counterclockwise to
decrease pressure. Replace regulator cover screw.
11. Turn o󰀨 all electrical power and gas supply to the
system.
12. Remove the manometer hose from the hose barb tting
or outlet pressure tap.
13. Replace outlet pressure tap:
White-Rodgers 36J54 valve: Turn outlet pressure
test screw in to seal pressure port (clockwise, 7 in-lb
minimum).
14. Turn on electrical power and gas supply to the system.
15. Close thermostat contacts “R” and “W1/W2” to
energize the valve.
Using a leak detection solution or soap suds, check for
leaks at outlet pressure tap plug (Honeywell valve) or screw
(White-Rodgers valve). Bubbles forming indicate a leak.
SHUT OFF GAS AND REPAIR ALL LEAKS IMMEDIATELY!
NOTE: For natural gas to LP gas conversion, consult your
dealer for appropriate conversion.
background
36
INLET OUTLET
Gas Valve On/Off
Selector Switch
White-Rodgers Model 36J54 (Two-Stage)
Gas Input Rate Measurement (Natural Gas
Only)
The actual gas input rate to the furnace must never be greater
than that specied on the unit rating plate. To measure natural
gas input using the gas meter, use the following procedure.
1. Turn OFF the gas supply to all other gas-burning
appliances except the furnace.
2. While the furnace is operating at high re rate, time
and record one complete revolution of the gas meter
dial measuring the smallest quantity, usually the dial
that indicates 1/2 cu. ft. per revolution. You will use
this number to calculate the quantity of gas in cubic
ft. if the furnace would consume if it ran steadily for
one hour (3600 seconds).
3. If the 1/2 cu. ft. dial was used, multiply your number x 2.
EXAMPLE: If it took 23 seconds to complete one
revolution of the 1/2 ft. dial (23 x 2 = 46).
This tells us that at this rate, it would take 46 seconds to
consume one cu. ft. of gas. 3600 / 46 = 78.
This tells us that in one hour, the furnace would consume
78 cu. ft. of gas.
The typical value range for 1 cu. ft. of natural gas is around
1000 BTU. Check with your gas utility, if possible. In this
example, the furnace is consuming 78,000 BTUH.
NOTE: The nal manifold pressure cannot vary
by more than ± 0.3” w.c. for Natural and + 0.5” for
LP from the specied setting. Consult your local
gas supplier if additional input rate adjustment is
required.
4. Turn ON gas to and relight all other appliances
turned o󰀨 in step 1. Be certain that all appliances
are functioning properly and that all pilot burners are
operating.
Temperature Rise
Temperature rise must be within the range specied on the
unit rating plate. An incorrect temperature rise may result
in condensing in or overheating of the heat exchanger. An
airow and temperature rise table is provided in the Speci-
cation Sheet applicable to your model. Determine and adjust
temperature rise as follows:
1. Operate furnace with burners ring for approximately
ten minutes. Ensure all registers are open and all
duct dampers are in their nal (fully or partially open)
position.
2. Place thermometers in the return and supply ducts
as close to the furnace as possible. Thermometers
must not be inuenced by radiant heat by being able
to “see” the heat exchanger.
3. Subtract the return air temperature from the supply
air temperature to determine the air temperature rise.
Allow adequate time for thermometer readings to
stabilize.
4. Adjust temperature rise by adjusting the circulator
blower speed. Increase blower speed to reduce
temperature rise. Decrease blower speed to increase
temperature rise. Refer to Startup Procedure and
Adjustment - Circulator Blower Speeds for speed
changing details.
SUPPLY
AIR
RETURN
AIR
Temperature Rise Measurement
Figure 48
WARNING
TO AVOID PERSONAL INJURY OR DEATH DUE TO ELECTRICAL SHOCK, TURN
OFF POWER TO THE FURNACE BEFORE CHANGING SPEED TAPS.
Blower Heat Off Delay Timings
The integrated control module provides a selectable heat o󰀨
delay function. The heat o󰀨 delay period may be set to 90,
120, 150, 180 seconds. The delay is factory shipped at 150
seconds but may be changed to suit the installation require-
ments and/or homeowner preference.
background
37
R-32 Information
R-32 Function
This furnace is equipped with a control board that is capable
of shutting o󰀨 the gas heat and turning on the blower fan in
case of an R-32 refrigerant leak in the indoor evaporator
coil. If the cooling unit that is paired with this furnace does
not utilize R-32 as the refrigerant, the R-32 functionalities in
the furnace control board will need to be turned o󰀨 for the
furnace to run properly.
R-32 function on the control board is ON by default. The
R-32 function can be disabled through the furnace control
by entering the A2L Function Enabled menu and selecting
“no”. If A2L function is disabled, the furnace control will ignore
all A2L functions. If A2L function is enabled, the control will
monitor the R-32 sensor information.
To enter the A2L Function Enabled menu, press the left or
right button until LED displays “A2E”. Press the center button
and the LED will display the selected option (yes or no). Press
the left or right button to select one of the two options and
press the center button twice to conrm the option.
R-32 Sensor Wire Routing
IMPORTANT NOTE: Wiring routing must not interfere
with circulator blower operation, lter removal or routine
maintenance. Wire should not be routed near hot surfac-
es and should be protected from sharp edges.
The R-32 Sensor wire coming from the indoor evaporator
coil will need to be routed into the furnace and connected to
the connection point on the furnace control board. This wire
should be routed alongside the thermostat wires through the
low voltage openings in the left or right side of the furnace
blower compartment. Please see the electrical section for the
location of the R-32 Sensor connection on the control board.
The R-32 function on the furnace control board may need
to be enabled or disabled if any element of the installation
changes from the original setup. The specic scenario will
depend on each installation, so please refer to the evapo-
rator coil’s installation manual to verify what is required for
your setup. For example, if the furnace was initially installed
with an evaporator coil that utilized R-410A refrigerant, and
the coil is later replaced with one that uses R-32 refrigerant,
then R-32 function mode on the furnace control board must
be enabled, and the R-32 sensor wire must be connected to
the furnace control board.
Furnace Start-Up
During furnace start up, the furnace control will identify the
connected R-32 sensor and will start monitoring the sensor
communication. A green LED located next to the sensor
connection will indicate if there is communication between
the furnace control and the R-32 sensor. The LED will be
ON during the duration of the startup and then will either
start blinking or turn OFF. The blinking LED signies that
communication with the R-32 sensor is present. The LED
OFF signies that there is no signal with the sensor.
If there are no alarms or faults, the furnace will go into reg-
ular run mode after a warm up period. The furnace control
monitors the R-32 sensor once per second.
R-32 Refrigerant Leak
If the R-32 sensor on the indoor evaporator coil detects a
specied concentration of R-32 refrigerant, the furnace will
enter Mitigation Mode to dilute the refrigerant concentrations
in case of a leak. In Mitigation Mode, the furnace will do the
following:
1. Display the A2L Refrigerant Leakage error code
(EAL)
2. Shut down the gas operation
3. Energize the optional ventilation and alarm outputs.
4. Run the fan at max CFM airow
Once the R-32 sensor stops detecting a leak, the fan will
continue to run for 5 minutes. After the 5 minutes, if there
are no other alarms or faults, the control will de-energize the
optional ventilation and alarm outputs and then go back to
the original operating mode per the thermostat.
A2L Verification
The A2L Function Verication menu allows the installer to
verify if the R-32 function operates properly. This menu
simulates the refrigerant leak process and is only able to be
used when there are no active alarms or faults. To verify the
R-32 functions, enter the A2L Function Verication menu and
select “YES”. To enter the A2L Function Verication menu,
press the left or right button until LED displays “A2u”. Press
the center button and the LED will display the selected op-
tion (yes or no). Press the left or right button to select one of
the two options and press the center button twice to conrm
the option. Once “YES” is selected, the furnace will do the
following:
1. Display the A2L Refrigerant Leakage code (EAL)
2. Shut down the gas operation
3. Energize the optional ventilation and alarm outputs.
4. Run the fan at max CFM airow
The control will exit the verication function if:
1. The 5 minute timeout expires or
2. An alarm or fault is detected or
3. The user turns OFF the A2L Function Verication.
NOTE: To verify gas heating operation shuts down, give
furnace a call for heat before entering into A2L Function
Verication.
background
38
Airflow Table *R9T96
HEATING AIFLOW
MODEL
THERMOSTAT
CALL
RECOMMENDED
LO & HI FIRE
SPEEDS
TAP
#
EXTERNAL STATIC PRESSURE, (INCHES WATER COLUMN)
0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
CFM RISE CFM RISE CFM RISE CFM RISE CFM RISE CFM CFM CFM
*R9T960303AN
W/W1
(LO FIRE)
F01
F01 753 25 708 26 663 28 616 30 568 33 513 470 423
F03 NOT RECOMMENDED HEATING SPEED
F04 880 21 843 22 807 23 768 24 723 26 683 643 590
W2
(HI FIRE)
F04
F02 915 29 883 30 845 32 809 33 773 34 730 690 650
F04 880 30 843 32 807 33 768 35 723 37 683 643 590
F05 1055 25 1022 26 990 27 959 28 930 29 891 858 825
*R9T960403AN
W/W1
(LO FIRE)
F01
F01 733 34 691 36 650 38 602 41 553 45 498 448 402
F03 NOT RECOMMENDED HEATING SPEED
F04 915 27 881 28 846 29 814 31 780 32 737 695 652
W2
(HI FIRE)
F02
F02 1051 34 1024 35 996 36 966 37 935 38 907 868 836
F04 915 39 881 40 846 42 814 44 780 46 737 695 652
F05 1138 31 1114 32 1092 33 1064 33 1035 34 1006 977 947
*R9T960603AN
W/W1
(LO FIRE)
F01
F01 900 40 867 42 830 44 798 46 758 48 718 682 645
F03 NOT RECOMMENDED HEATING SPEED
F04 866 42 830 44 797 46 759 48 717 50 675 634 591
W2
(HI FIRE)
F02
F02 1292 41 1272 42 1248 43 1227 43 1206 44 1184 1162 1137
F04 NOT RECOMMENDED HEATING SPEED
F05 1223 44 1195 45 1176 45 1149 46 1124 47 1101 1074 1047
*R9T960603BN
W/W1
(LO FIRE)
F01
F01 914 41 864 43 815 46 762 49 704 53 654 604 560
F03 NOT RECOMMENDED HEATING SPEED
F04 960 39 917 41 864 43 812 46 764 49 708 661 614
W2
(HI FIRE)
F02
F02 1121 48 1083 49 1041 51 996 54 953 56 906 861 818
F04 NOT RECOMMENDED HEATING SPEED
F05 1164 46 1123 47 1084 49 1042 51 1003 53 960 920 871
*R9T960803BN
W/W1
(LO FIRE)
F01
F01 1205 41 1169 43 1131 44 1091 46 1053 47 1014 974 934
F03 NOT RECOMMENDED HEATING SPEED
F04 1152 43 1112 45 1076 46 1035 48 996 50 954 916 868
W2
(HI FIRE)
F02
F02 1415 50 1385 51 1355 52 1322 54 1291 55 1255 1219 1186
F04 NOT RECOMMENDED HEATING SPEED
F05 1321 54 1287 55 1251 57 1217 58 1181 60 1146 1112 1072
*R9T960804CN
W/W1
(LO FIRE)
F01
F01 1289 39 1234 40 1180 42 1122 44 1058 47 991 917 840
F03 1297 38 1246 40 1199 42 1142 44 1083 46 1020 949 872
F04 1194 42 1137 44 1079 46 1014 49 948 52 873 792 712
W2
(HI FIRE)
F02
F02 1836 39 1784 40 1741 41 1703 42 1664 43 1628 1585 1537
F04 NOT RECOMMENDED HEATING SPEED
F05 1748 41 1696 42 1650 43 1612 44 1574 45 1526 1478 1428
*R9T961004CN
W/W1
(LO FIRE)
F01
F01 1475 42 1421 44 1369 45 1314 47 1260 49 1207 1152 1097
F03 NOT RECOMMENDED HEATING SPEED
F04 1259 49 1197 52 1138 55 1074 58 1015 60 947 885 821
W2
(HI FIRE)
F02
F02 1791 50 1741 51 1699 52 1652 54 1609 55 1561 1513 1465
F04 NOT RECOMMENDED HEATING SPEED
F05 1710 52 1660 54 1613 55 1583 56 1517 59 1470 1421 1374
*R9T961005CN
W/W1
(LO FIRE)
F04
F01 1259 49 1197 52 1138 55 1074 58 1015 60 947 885 821
F03 NOT RECOMMENDED HEATING SPEED
F04 1347 46 1286 48 1231 51 1172 53 1115 56 1055 995 933
W2
(HI FIRE)
F02
F02 1791 50 1741 51 1699 52 1652 54 1609 55 1561 1513 1465
F04 NOT RECOMMENDED HEATING SPEED
F05 1921 46 1879 47 1840 48 1791 50 1751 51 1705 1656 1610
*R9T961205DN
W/W1
(LO FIRE)
F04
F01 1766 42 1712 44 1666 45 1612 46 1558 48 1506 1450 1395
F03 NOT RECOMMENDED HEATING SPEED
F04 1684 44 1620 46 1561 48 1499 50 1438 52 1378 1318 1259
W2
(HI FIRE)
F02
F02 2205 48 2157 49 2110 51 2064 52 2021 53 1974 1925 1879
F04 NOT RECOMMENDED HEATING SPEED
F05 2031 53 1981 54 1933 55 1901 56 1850 58 1799 1750 1702
NOTE:
1. Default low fire heating speed is f01
2. Default high fire heating speed is f02
3. Duct work must be sized for highest airflow.
If furnace is paired to low ton outdoor, the
ductwork should be sized for higher heating
airflow.
background
39
Airflow Table *R9T96
*D9T960403BN
W/W1
(LO FIRE)
F01
F01 727 34 677 37 623 40 565 44 510 49 455 403 351
F03 NOT RECOMMENDED HEATING SPEED
F04 878 28 839 30 797 31 751 33 701 36 653 607 561
W2
(HI FIRE)
F02
F02 923 39 882 40 841 42 798 45 752 47 704 660 614
F04 878 41 839 42 797 45 751 47 701 51 653 607 561
F05 1106 32 1076 33 1044 34 1010 35 974 37 939 899 860
*D9T960603BN
W/W1
(LO FIRE)
F01
F01 1167 32 1118 33 1069 35 1022 37 974 38 928 877 833
F03 NOT RECOMMENDED HEATING SPEED
F04 NOT RECOMMENDED HEATING SPEED
W2
(HI FIRE)
F02
F02 1332 40 1289 41 1245 43 1200 44 1160 46 1120 1081 1036
F04 NOT RECOMMENDED HEATING SPEED
F05 1248 43 1204 44 1159 46 1113 48 1071 50 1028 983 943
*D9T960803BN
W/W1
(LO FIRE)
F01
F01 1167 43 1124 44 1087 46 1040 48 995 50 954 916 869
F03 NOT RECOMMENDED HEATING SPEED
F04 1217 41 1174 42 1130 44 1086 46 1045 48 1003 962 925
W2
(HI FIRE)
F02
F02 1317 54 1277 56 1240 57 1201 59 1161 61 1122 1081 1045
F04 NOT RECOMMENDED HEATING SPEED
F05 1300 55 1263 56 1225 58 1186 60 1142 62 1099 1062 1023
*D9T961005CN
W/W1
(LO FIRE)
F01
F01 1366 46 1307 48 1248 50 1188 52 1130 55 1069 1007 938
F03 1295 48 1230 51 1168 53 1105 56 1044 58 981 911 843
F04 NOT RECOMMENDED HEATING SPEED
W2
(HI FIRE)
F02
F02 1833 48 1785 50 1736 51 1688 53 1640 54 1593 1543 1497
F04 1634 54 1578 56 1525 58 1471 60 1416 62 1363 1311 1265
F05 2028 44 1994 45 1937 46 1899 47 1863 48 1814 1769 1724
NOTE:
1. Default low fire heating speed is f01
2. Default high fire heating speed is f02
3. Duct work must be sized for highest airflow.
If furnace is paired to low ton outdoor, the
ductwork should be sized for higher heating
airflow.
background
40
Airflow Table *D9T96
NOTE:
1. Default speed for fan is f03
2. Default speed for low cooling (y1) / 1 stage (y) is f04
3. Default speed for 2nd stage (y2) cooling is f05
4. Aiflow & wattage data is funace only. Watts may
increase if undersized ducting is used.
5. Airflows over 1600 cfm require 2 side return or
side & bottom return. A minimm 20x25 size filter is
required.
FAN & COOLING AIFLOW
MODEL
THERMOSTAT
CALL
TAP #
EXTERNAL STATIC PRESSURE (INCHES WATER COLUMN)
0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
CFM CFM CFM CFM CFM Watts CFM Watts CFM Watts CFM Watts
*R9T960303AN Y/Y1, Y2, G
F01 753 708 663 616 568 118 513 125 470 131 423 136
F02 915 883 845 809 773 177 730 182 690 189 650 196
F03 529 518 461 394 343 75 288 81 223 86 N/A N/A
F04 880 843 807 768 723 161 683 168 643 175 590 181
F05 1055 1022 990 959 930 241 891 249 858 256 825 263
F06 1101 1072 1040 1010 980 269 949 275 918 283 881 290
F07 1190 1162 1134 1104 1077 322 1042 328 1013 336 982 345
F08 1183 1157 1130 1103 1077 322 1047 331 1018 338 988 347
F09 1229 1206 1178 1153 1128 359 1100 365 1070 372 1042 328
*R9T960403AN Y/Y1, Y2, G
F01 733 691 650 602 553 111 498 117 448 124 402 130
F02 1051 1024 996 966 935 240 907 248 868 254 836 262
F03 665 620 570 517 462 93 407 100 359 104 309 109
F04 915 881 846 814 780 174 737 180 695 186 652 193
F05 1138 1114 1092 1064 1035 288 1006 298 977 307 947 313
F06 887 855 823 790 751 164 705 170 666 176 608 183
F07 1189 1163 1138 1111 1085 321 1059 331 1032 341 1001 349
F08 1266 1243 1218 1197 1172 372 1148 383 1123 394 1099 400
F09 1342 1324 1305 1280 1263 440 1239 452 1216 463 1193 473
*R9T960603AN Y/Y1, Y2, G
F01 900 867 830 798 758 175 718 182 682 189 645 196
F02 1292 1272 1248 1227 1206 429 1184 438 1162 447 1137 456
F03 688 649 603 551 499 104 447 110 405 115 359 120
F04 866 830 797 759 717 161 675 168 634 175 591 181
F05 1223 1195 1176 1149 1124 370 1101 381 1074 388 1047 398
F06 1037 1004 975 950 921 243 886 251 853 258 823 266
F07 1079 1053 1025 1000 970 271 941 278 911 285 873 292
F08 1128 1099 1075 1050 1022 300 993 310 965 319 937 326
F09 1171 1148 1124 1096 1070 330 1045 339 1017 348 988 355
*R9T960603BN Y/Y1, Y2, G
F01 914 864 815 762 704 150 654 155 604 162 560 168
F02 1121 1083 1041 996 953 230 906 236 861 245 818 252
F03 758 696 636 572 512 104 460 110 412 115 N/A N/A
F04 960 917 864 812 764 164 708 171 661 179 614 184
F05 1164 1123 1084 1042 1003 249 960 258 920 268 871 276
F06 1219 1180 1141 1102 1062 277 1020 286 978 294 940 303
F07 1273 1240 1207 1171 1128 309 1089 318 1051 327 1012 336
F08 1307 1270 1235 1198 1160 329 1122 336 1083 346 1043 354
F09 1427 1390 1362 1327 1297 408 1260 414 1224 423 1193 434
*R9T960803BN Y/Y1, Y2, G
F01 1205 1169 1131 1091 1053 261 1014 270 974 279 934 289
F02 1415 1385 1355 1322 1291 394 1255 403 1219 407 1186 417
F03 696 635 568 500 442 91 390 96 336 101 255 104
F04 1152 1112 1076 1035 996 239 954 248 916 258 868 267
F05 1321 1287 1251 1217 1181 328 1146 336 1112 345 1072 355
F06 901 851 801 746 690 142 638 149 587 154 543 160
F07 1112 1076 1032 992 949 219 905 228 858 236 819 246
F08 1290 1252 1215 1182 1143 311 1107 319 1071 329 1032 337
F09 1471 1440 1409 1377 1347 427 1314 436 1283 446 1247 456
*R9T960804CN Y/Y1, Y2, G
F01 1289 1234 1180 1122 1058 217 991 226 917 234 840 242
F02 1836 1784 1741 1703 1664 496 1628 515 1585 528 1537 540
F03 1297 1246 1199 1142 1083 224 1020 233 949 242 872 250
F04 1194 1137 1079 1014 948 188 873 197 792 205 712 212
F05 1748 1696 1650 1612 1574 438 1526 450 1478 462 1428 474
F06 1451 1399 1354 1309 1256 288 1200 298 1142 306 1077 316
F07 1587 1534 1489 1445 1406 352 1354 362 1298 372 1244 383
F08 1683 1633 1589 1546 1502 405 1460 416 1406 428 1355 440
F09 1919 1890 1846 1807 1771 566 1735 585 1694 600 1650 613
background
41
Airflow Table *D9T96
NOTE:
1. Default speed for fan is f03
2. Default speed for low cooling (y1) / 1 stage (y) is f04
3. Default speed for 2nd stage (y2) cooling is f05
4. Aiflow & wattage data is funace only. Watts may
increase if undersized ducting is used.
5. Airflows over 1600 cfm require 2 side return or
side & bottom return. A minimm 20x25 size filter is
required.
*R9T961004CN Y/Y1, Y2, G
F01 1475 1421 1369 1314 1260 307 1207 317 1152 326 1097 337
F02 1791 1741 1699 1652 1609 482 1561 493 1513 504 1465 516
F03 924 846 767 684 606 124 529 130 463 136 398 142
F04 1259 1197 1138 1074 1015 218 947 226 885 236 821 244
F05 1710 1660 1613 1583 1517 427 1470 440 1421 451 1374 462
F06 1592 1536 1486 1436 1383 363 1331 373 1281 383 1233 393
F07 1627 1574 1524 1474 1423 382 1370 392 1320 403 1271 414
F08 1921 1879 1840 1791 1751 577 1705 588 1656 604 1610 617
F09 2026 1981 1929 1901 1858 659 1819 677 1773 685 1733 701
*R9T961005CN Y/Y1, Y2, G
F01 1259 1197 1138 1074 1015 218 947 226 885 236 821 244
F02 1791 1741 1699 1652 1609 482 1561 493 1513 504 1465 516
F03 1176 1108 1044 980 913 188 845 197 779 206 718 213
F04 1347 1286 1231 1172 1115 247 1055 256 995 265 933 275
F05 1921 1879 1840 1791 1751 577 1705 588 1656 604 1610 617
F06 1446 1404 1335 1280 1226 291 1171 300 1117 309 1062 319
F07 1618 1567 1510 1460 1413 379 1364 390 1312 401 1262 411
F08 2009 1964 1918 1886 1852 656 1811 671 1759 676 1722 693
F09 2161 2122 2084 2048 2010 739 1973 755 1940 776 1914 796
*R9T961205DN Y/Y1, Y2, G
F01 1766 1712 1666 1612 1558 387 1506 401 1450 412 1395 425
F02 2205 2157 2110 2064 2021 679 1974 694 1925 709 1879 726
F03 1118 1035 952 860 750 149 663 156 590 165 519 171
F04 1684 1620 1561 1499 1438 345 1378 358 1318 371 1259 383
F05 2031 1981 1933 1901 1850 541 1799 556 1750 570 1702 585
F06 1220 1145 1070 995 907 177 811 187 725 194 651 201
F07 1357 1311 1243 1175 1107 223 1021 233 932 243 861 254
F08 1906 1877 1828 1778 1726 474 1674 487 1622 501 1568 515
F09 2454 2396 2347 2296 2250 889 2202 905 2157 922 2113 941
*D9T960403BN Y/Y1, Y2, G
F01 727 677 623 565 510 101 455 106 403 111 351 116
F02 923 882 841 798 752 159 704 165 660 172 614 177
F03 632 574 510 448 388 80 332 85 277 89 234 93
F04 878 839 797 751 701 146 653 151 607 157 561 162
F05 1106 1076 1044 1010 974 243 939 250 899 256 860 263
F06 1188 1156 1123 1091 1062 290 1029 296 998 302 964 309
F07 1237 1205 1174 1145 1115 317 1081 324 1050 332 1016 341
F08 1281 1252 1222 1195 1163 347 1134 357 1104 362 1071 369
F09 1382 1354 1327 1302 1276 418 1246 424 1219 432 1190 439
*D9T960603BN Y/Y1, Y2, G
F01 1167 1118 1069 1022 974 237 928 246 877 252 833 259
F02 1332 1289 1245 1200 1160 327 1120 335 1081 343 1036 353
F03 680 609 532 460 397 85 337 90 252 94 201 97
F04 903 839 783 719 661 139 601 144 546 150 497 155
F05 1248 1204 1159 1113 1071 280 1028 290 983 299 943 306
F06 963 907 852 803 745 160 689 166 639 173 587 179
F07 1393 1348 1309 1267 1230 368 1189 375 1152 383 1116 391
F08 1450 1407 1366 1330 1290 409 1251 412 1221 421 1186 430
F09 1468 1436 1393 1359 1323 418 1285 427 1248 436 1210 445
*D9T960803BN Y/Y1, Y2, G
F01 1167 1124 1087 1040 995 250 954 258 916 264 869 272
F02 1317 1277 1240 1201 1161 336 1122 344 1081 350 1045 360
F03 733 669 606 543 482 99 424 104 372 109 300 115
F04 1217 1174 1130 1086 1045 274 1003 282 962 289 925 297
F05 1300 1263 1225 1186 1142 322 1099 331 1062 339 1023 348
F06 919 872 820 764 711 149 658 156 605 162 553 168
F07 1126 1085 1042 998 953 234 910 241 866 249 824 255
F08 1375 1341 1301 1264 1226 375 1189 382 1154 391 1118 402
F09 1440 1402 1366 1330 1295 414 1260 423 1224 430 1187 439
*D9T961005CN Y/Y1, Y2, G
F01 1366 1307 1248 1188 1130 255 1069 264 1007 273 938 282
F02 1833 1785 1736 1688 1640 509 1593 519 1543 529 1497 540
F03 1295 1230 1168 1105 1044 227 981 236 911 244 843 252
F04 1634 1578 1525 1471 1416 382 1363 391 1311 400 1265 411
F05 2028 1994 1937 1899 1863 683 1814 690 1769 702 1724 713
F06 1773 1721 1671 1621 1571 465 1521 474 1470 485 1421 495
F07 1908 1860 1813 1766 1720 569 1672 581 1624 591 1578 602
F08 1965 1919 1873 1829 1783 617 1736 627 1688 637 1643 648
F09 2096 2053 2014 1973 1931 726 1890 736 1849 752 1803 758
background
42
Normal Sequence of Operation
Power Up
Upon being powered up, the control board will perform in-
ternal and polarity checks. The control will display I d L, idle
mode until a call from the thermostat is received.
Continuous Fan Mode Speed Selection
When a 24 vac signal is present on the G terminal, the blower
motor will operate on selected continuous blower speed. The
EAC-H will also be energized as long as the blower motor
is energized.
When the R to G circuit is opened, the blower motor will shut
down if no other function requires blower motor operation.
To change the main blower speed in circulation mode, follow
the following steps:
1. Press left or right switch until LED displays “F S d “. Press
center switch and the LED will display the selected speed
number as Fxx (xx: Blower speed number from 01 to 09).
SP3 is default speed for circulation.
2. The control will display an available speed number every
time Left/Right switches are pressed. All 9 speeds are
available for circulation.
3. Press the center button to select the desired speed. The
control will immediately apply that speed setting.
THERMOSTAT
CALL
AVAILABLE
SPEEDS
G
F01
F02
F03 (DEFAULT)
F04
F05
F06
F07
F08
F09
HeAtinG mode SPeed SeleCtion
To change the main blower speed in HEATING mode, follow
the following steps:
1. Press left or right button till LED displays “gA1 “(for single
stage HEATING) or “gA2 “(for Two stage HEATING).
Press center button and LED will display the selected
speed number as Fxx (xx: Blower speed number).
2. The control shall rotate available speed number every
time Left/Right switches are pressed. Table below shows
the available speeds for Low & High heat mode.
3. When the center switch is pressed, the current displayed
speed shall be selected, and control shall apply the newly
selected speed in next heating call.
Note: Always refer to the Heating Chart to choose from
available heating speeds.
THERMOSTAT CALL AVAILABLE SPEEDS
W/W1
F01 (DEFAULT)
F03
F04
W2
F02 (DEFAULT)
F04
F05
Heating Mode
Call for 1st Stage Heat
• On a call for heat, the thermostat contacts close & the
control board receives 24 vac on the W1 terminal.
• The control board microcomputer runs its self-check
routine.
• The control veries the limit switch is closed (24 vac on
Pin 8 of the 12 Pin connector).
• The control veries that pressure switch circuit is open
(0 vac on Pin 5).
• The control module performs a gas valve circuitry check
to verify gas valve relay state and presence of no voltage
at the valve.
• The system will energize the Induced draft blower.
• The pre-purge period begins once the low re pressure
switch is detected closed. (24 vac on Pin 5).
• After the completion of pre-purge, the control will ener-
gize the igniter.
• After completion of the igniter warm-up period:
• The gas valve is energized.
• The igniter is de-energized as soon as ame is sensed.
• After 30 seconds the indoor blower is energized on
heating speed.
• When using a single-stage heating thermostat the fur-
nace will transition to 2nd stage gas heat by either a
xed time or auto mode, depending on menu selections
made by the installer.
• The inducer motor is enabled at high speed.
• Closure of the second stage pressure switch will energize
the high re stage of the gas valve.
• The 2nd stage gas heat speed of the indoor blower is
energized
-When the thermostat is satised;
background
43
• The gas valve is de-energized.
• The inducer remains energized for the post purge period
(15 seconds).
• The indoor blower runs for the selected o󰀨 delay period
(90 seconds by default, adjustable from 30 – 180 sec-
onds).
Call for 2nd Stage Heat During 1st Stage Heat Operation
• The control board receives a 24 vac signal on the W2
terminal.
• The inducer motor is enabled at high speed.
• Closure of the second stage pressure switch will energize
the high re stage of the gas valve.
• The 2nd stage gas heat speed of the indoor blower is
energized.
Note: A call for second stage without a call for rst stage will
be ignored.
CoolinG mode SPeed SeleCtion
To change the main blower speed in COOLING mode, follow
the following steps:
1. Press left or right button till LED displays “AC1 “(for single
stage COOLING) or “AC2 “(for Two stage COOLING).
Press center button and LED will display the selected
speed number as Fxx (xx: Blower speed number from
1 to 9).
2. The control shall rotate available speed number every
time Left/Right switches are pressed. All 9 speeds are
available for both Single and Two Stage cooling.
3. When the center switch is pressed, the current displayed
speed shall be selected, and control shall apply the newly
selected speed in next cooling call.
THERMOSTAT CALL AVAILABLE SPEEDS
Y/Y1
F01
F02
F03
F04 (DEFAULT)
F05
F06
F07
F08
F09
SinGle StAGe CoolinG SPeed tABle for 2 StAGe ifC
THERMOSTAT CALL AVAILABLE SPEEDS
Y2
F01
F02
F03
F04
F05 (DEFAULT)
F06
F07
F08
F09
tWo StAGe CoolinG SPeed tABle for 2 StAGe ifC
Cooling Mode
Low Stage Cooling Mode Sequence:
On a call for low stage cooling, the Y/Y1 or Y/Y1 and G ther-
mostat contacts close signaling the furnace control board
with 24 vac. on Y/Y1 or Y/Y1 and G terminals.
• The 7-Segment will display the cool mode; 1 A C
• The compressor and condenser fan are energized.
• The circulator fan is energized at low cool speed after a
cool on delay. The electronic air cleaner will also be en-
ergized. After the thermostat is satised, the compressor
and condenser fan are de-energized and the Cool Mode
Fan O󰀨 Delay period begins.
• Following the Cool Mode Fan O󰀨 Delay period, the cool
circulator and air cleaner relay are de-energized.
2nd Stage Cooling Mode Sequence:
On a call for 2nd stage cooling, the Y2 or Y2 and G thermostat
contacts close signaling the furnace control board with 24
vac. on Y2 or Y2 and G terminals.
• The 7-Segment will display the cool mode; 2 A C
• The compressor and condenser fan are energized.
• The circulator fan is energized at cool speed after a cool
on delay. The electronic air cleaner will also be energized.
• After the thermostat is satised, the compressor and
condenser fan are de-energized and the Cool Mode Fan
O󰀨 Delay period begins.
• Following the Cool Mode Fan O󰀨 Delay period, the cool
circulator and air cleaner relay are de-energized.
background
44
Operational Checks
The burner ames should be inspected with the burner
compartment door installed. Flames should be stable, quiet,
soft, and blue (dust may cause orange tips but they must not
be yellow). Flames should extend directly outward from the
burners without curling, oating, or lifting o󰀨. Flames must
not impinge on the sides of the heat exchanger ring tubes.
Safety Circuit Description
WARNING
DO NOT BYPASS SAFETY DEVICES.
A number of safety circuits are employed to ensure safe and
proper furnace operation. These circuits serve to control any
potential safety hazards and serve as inputs in the moni-
toring and diagnosis of abnormal function. These circuits
are continuously monitored during furnace operation by the
integrated control module.
Integrated Control Module
The integrated control module will display furnace status
including faults, mode of operation and air ow, on three
seven segment displays.
Primary Limit
The primary limit control is located on the partition panel and
monitors heat exchanger compartment temperatures. It is
a normally-closed (electrically), automatic reset, tempera-
ture-activated sensor. The limit guards against overheating
as a result of insu󰀩cient conditioned air passing over the
heat exchanger.
Auxiliary Limit
The auxiliary limit controls are located on or near the circula-
tor blower and monitors blower compartment temperatures.
They are a normally-closed (electrically), automatic reset,
temperature-activated sensor. These limits guard against
overheating as a result of insu󰀩cient conditioned air passing
over the heat exchanger.
Rollout Limit
The rollout limit controls are mounted on the burner/manifold
assembly and monitor the burner ame. They are normal-
ly-closed (electrically), manual-reset sensors. These limits
guard against burner ames not being properly drawn into
the heat exchanger.
Pressure Switches
The pressure switches are normally-open (closed during
operation) negative air pressure-activated switches. They
monitor the airow (combustion air and ue products) through
the heat exchanger via pressure taps located on the induced
draft blower and the coil front cover. These switches guard
against insu󰀩cient airow (combustion air and ue products)
through the heat exchanger and/or blocked condensate drain
conditions.
Flame Sensor
The ame sensor is a probe mounted to the burner/manifold
assembly which uses the principle of ame rectication to
determine the presence or absence of ame.
Troubleshooting
Electrostatic Discharge (ESD)
Precautions
Use the following precautions during furnace installation
and servicing to protect the integrated control module from
damage. By putting the furnace, the control, and the person
at the same electrostatic potential, these steps will help
avoid exposing the integrated control module to electrostatic
discharge. This procedure is applicable to both installed and
uninstalled (ungrounded) furnaces.
1. Disconnect all power to the furnace. Do not touch the
integrated control module or any wire connected to the
control prior to discharging your body’s electrostatic
charge to ground.
2. Firmly touch a clean, unpainted, metal surface of the
furnace away from the control. Any tools held in a
person’s hand during grounding will be discharged.
3. Service integrated control module or connecting
wiring following the discharge process in step 2. Use
caution not to recharge your body with static electricity;
(i.e., do not move or shu󰀪e your feet, do not touch
ungrounded objects, etc.). If you come in contact with
an ungrounded object, repeat step 2 before touching
control or wires.
4. Discharge your body to ground before removing a new
control from its container. Follow steps 1 through 3 if
installing the control on a furnace. Return any old or
new controls to their containers before touching any
ungrounded object.
Diagnostic Chart
Refer to the Troubleshooting Chart in the back of this manual
for assistance in determining the source of unit operational
problems.
External Lockout
- A control lockout resulting from an external fault
sensed by the control, such as an unsuccessful
recycle or retry period, or a limit trip. Once in
External Lockout, the control will shut down for a
period of one hour before attempting another trial
for ignition.
Internal Lockout
- A failure internal to the control board.
Fault Recall
Retrieving Fault Codes
background
45
Resetting From Lockout
Furnace lockout results when a furnace is unable to achieve
ignition after three attempts during a single call for heat. It is
characterized by a non-functioning furnace and a one ash
diagnostic LED code. If the furnace is in “lockout”, it can be
reset in any of the following ways.
1. Automatic reset. The integrated control module will
automatically reset itself and attempt to resume normal
operations following a one hour lockout period.
2. Manual power interruption. Interrupt 115 volt power to
the furnace for 1 - 20 seconds.
3. Manual thermostat cycle. Lower the thermostat so that
there is no longer a call for heat then reset to previous
setting. Interrupt thermostat signal to the furnace for
1 - 20 seconds.
NOTE: If the condition which originally caused the lockout
still exists, the control will return to lockout. Refer to the
Troubleshooting Chart for aid in determining the cause.
Maintenance
WARNING
HIGH VOLTAGE
To avoid personal injury or death due to
electrical shock, disconnect electrical
power before performing any service or
maintenance.
Annual Inspection
The furnace should be inspected by a qualied installer, or
service agency at least once per year. This check should be
performed at the beginning of the heating season. This will
ensure that all furnace components are in proper working
order and that the heating system functions appropriately.
Pay particular attention to the following items. Repair or
service as necessary.
• Flue pipe system. Check for blockage and/or
leakage. Check the outside termination and the
connections at and internal to the furnace.
• Heat exchanger. Check for corrosion and/or buildup
within the heat exchanger passageways.
• Burners. Check for proper ignition, burner ame,
and ame sense.
• Drainage system. Check for blockage and/or
leakage. Check hose connections at and internal
to furnace.
• Wiring. Check electrical connections for tightness
and/or corrosion. Check wires for damage.
• Filters.
• R-32 Sensor Wire. Check R-32 sensor wire
connection for tightness and check wire for damage.
WARNING
HIGH VOLTAGE
TO AVOID ELECTRICAL SHOCK, INJURY OR DEATH,
DISCONNECT ELECTRICAL POWER BEFORE PERFORMING ANY
MAINTENANCE. IF YOU MUST HANDLE THE IGNITER, HANDLE
WITH CARE. TOUCHING THE IGNITER ELEMENT WITH BARE
FINGERS, ROUGH HANDLING OR VIBRATION COULD DAMAGE
THE IGNITER RESULTING IN PREMATURE FAILURE. ONLY A
QUALIFIED SERVICER SHOULD EVER HANDLE THE IGNITER.
Filters
Filter Maintenance
Improper lter maintenance is the most common cause of
inadequate heating or cooling performance. Filters should
be cleaned (permanent) or replaced (disposable) every two
months or as required. When replacing a lter, it must be
replaced with a lter of the same type and size.
CAUTION
TO ENSURE PROPER UNIT PERFORMANCE, ADHERE TO THE
FILTER SIZES GIVEN IN THE RECOMMENDED MINIMUM FILTER
SIZE TABLE OR SPECIFICATION SHEET APPLICABLE TO YOUR
MODEL.
Filter Removal
Depending on the installation, di󰀨ering lter arrangements
can be applied. Filters can be installed in either the central
return register or a side panel external lter rack (upow
only). A media air lter or electronic air cleaner can be used
as an alternate lter. Follow the lter sizes given in the Rec-
ommended Minimum Filter size table to ensure proper unit
performance.
To remove lters from an external lter rack in an upright
upow installation, follow the directions provided with external
lter rack kit.
Horizontal Unit Filter Removal
Filters in horizontal installations are located in the central
return register or the ductwork near the furnace.
To remove:
1. Turn OFF electrical power to furnace.
2. Remove lter(s) from the central return register or
ductwork.
3. Replace filter(s) by reversing the procedure for
removal.
4. Turn ON electrical power to furnace.
Media Air Filter or Electronic Air Cleaner
Removal
Follow the manufacturer’s directions for service.
background
46
Burner Flame
Figure 49
Burners
Visually inspect the burner ames periodically during the
heating season. Turn on the furnace at the thermostat and
allow several minutes for ames to stabilize, since any dis-
lodged dust will alter the ames normal appearance. Flames
should be stable, quiet, soft, and blue (dust may cause or-
ange tips but they must not be yellow). They should extend
directly outward from the burners without curling, oating, or
lifting o󰀨. Flames must not impinge on the sides of the heat
exchanger ring tubes.
Induced Draft and Circulator Blowers
The bearings in the induced draft blower and circulator blower
motors are permanently lubricated by the manufacturer. No
further lubrication is required. Check motor windings for
accumulation of dust which may cause overheating. Clean
as necessary.
Condensate Trap and Drain System (Quali-
fied Servicer Only)
Annually inspect the drain tubes, drain trap, and eld-sup-
plied drain line for proper condensate drainage. Check drain
system for hose connection tightness, blockage, and leaks.
Clean or repair as necessary.
Flame Sensor (Qualified Servicer Only)
Under some conditions, the fuel or air supply can create a
nearly invisible coating on the ame sensor. This coating
acts as an insulator causing a drop in the ame sense signal.
If the ame sense signal drops too low the furnace will not
sense ame and will lock out. The ame sensor should be
carefully cleaned by a qualied servicer using steel wool.
Before Leaving an Installation
• Cycle the heating, cooling and fan only operations to
verify each operation is working properly.
• Review the Owner’s Manual with the homeowner and
discuss proper furnace operation and maintenance.
• Leave literature packet near furnace.
Repair and Replacement Parts
• When ordering any of the listed functional parts, be
sure to provide the furnace model, manufacturing, and
serial numbers with the order.
• Although only functional parts are shown in the parts
list, all sheet metal parts, doors, etc. may be ordered
by description.
• Parts are available from your distributor.
Functional Parts List:
Auxiliary Limit Switch
Blower Cuto󰀨
Blower Housing
Blower Motor
Blower Mounting Bracket
Blower Wheel
Door Switch
Flame Sensor
Gas Manifold
Gas Valve
Heat Exchanger
Igniter
Induced Draft Blower
Integrated Control Module
Natural Gas Orice
Pressure Switch
Primary Limit Switch
Propane Gas Orice
Rollout Limit Switch
Transformer
background
47
2 Stage Status Codes
Main Menu Option Menu
Active Alarm menu
Er r Exx
( xx: code numbers )
Last 10 Faults
F10 Exx
( xx: code numbers )
Code Release Number
Cr
CR Number
Reset to Factory Default
r Fd yes, no
Blower Speed for Continuous Fan Mode
FSd Fxx
( xx: Blower Speed Number F01,
F02.. )
Blower Speed for 1st Stage Compressor
Mode
AC1 Fxx
( xx: Blower Speed Number F01,
F02.. )
Blower Speed for 2nd Stage Compressor
Mode
AC2 Fxx
( xx: Blower Speed Number F01,
F02.. )
Cool On Delay
Cnd
Delay, Seconds
Default set at 7 Secs,
Adjustments can be made in 7
Secs increments from 0 to 35
Secs
Cool Off Delay
Cf d
Delay, Seconds
Default set at 65 Secs,
Adjustments can be made in 5
Secs increments from 0 to 120
Secs
Fan Speed for Low-Stage Gas
Heat Mode
gA1 Fxx
( xx: Blower Speed Number F01,
F02.. )
Fan Speed for High-Stage Gas
Heat Mode
gA2 Fxx
( xx: Blower Speed Number F01,
F02.. )
Gas Heat On Delay
gnd
Delay, Seconds
Default set at 30 Secs,
Adjustments can be made in 5
Secs increments from 5 to 30
Secs
Gas heat Off Delay
gFd
Delay, Seconds
Default set at 90 Secs,
Adjustments can be made in 30
Secs increments from 30 to 180
Secs
Automatic Heat Staging - For Two Stage
Control
AHS
no, 10, 20, 30,
60, AUt
Refer to Section " CHANGING
HEATING MODE SETTING"
A2L Function Verification
A2u yes, no
Refer to the R-32 Information
Section
A2L Function Enabled
A2E yes, no
Refer to the R-32 Information
Section
Menu Description
LED Display
Notes
background
48
2 Stage Status Codes
Status Menu
Idle
I dL
Continuous Fan
FAn
Compressor Cooling, Low Stage
1AC
Compressor Cooling, High Stage
2AC
Gas Heat, Low Stage
gH1
Gas Heat, High Stage
gH2
OEM test Mode
EOL
Mode
Main
Menu
background
49
Troubleshooting Chart
To View & Clear Fault Codes
Press either the Left or Right switch until F10 is displayed.
Press the center switch to view stored faults.
Press and hold the center switch for 5 to 30 seconds.
All stored faults will be erased, and the display will ash - - - three times and return to F10.
Symptom
LED
Status
Fault Description Corrective Actions
Normal operation
I dL
Normal operation None
Locate and correct gas interruption
Check front cover pressure switch operation and verify
proper drainage (hose, wiring, contact operation),
correct if necessary
Replace or realign igniter
Check flame sense signal, clean sensor if coated or
oxidized
Check flue piping for blockage, proper length, elbows,
and termination
Verify proper induced draft blower performance
Pressure switch circuit is closed at start
of heating cycle
Pressure switch contacts sticking
Short in pressure switch circuit wiring
Pressure switch circuit is not closed
Pressure switch hose blocked pinched,
or connected improperly
Inspect flue and/or inlet air piping for blockage, proper
length, elbows, and termination
Check drain system, correct as necessary
Check induced draft blower performance, correct as
necessary
Incorrect pressure switch set point or
malfunctioning switch contacts
Check pressure switch operation, replace as needed
Loose or improperly connected wiring Tighten or correct wiring connection
Primary limit circuit is open
Check filters and ductwork for blockage Clean filters or
remove obstruction
Insufficient conditioned air over the heat
exchanger
Check circulator blower speed and performance
Blocked filters, restrictive ductwork,
improper circulator blower speed, or
failed circulator blower motor
Correct speed or replace blower motor if necessary
Loose or improperly connected wiring in
high limit circuit
Tighten or correct wiring connection
Induced draft blower
runs continuously with
no furnace operation
EE2
Inspect pressure switch hose, repair/replace if
necessary
Blocked flue and/or inlet air pipe, blocked
drain system or weak induced draft
blower
Circulator blower runs
continuously
No furnace operation
EE3
Furnace fails to
operate
EE0
Furnace lockout due to an excessive
number of ignition “retries” (3 total)
Failure to establish flame
Loss of flame after establishment
Furnace fails to
operate
EE1
Replace low stage pressure switch Repair short in
wiring
background
50
Troubleshooting Chart
Symptom
LED
Status
Fault Description Corrective Actions
Flame sensed with no call for heat Correct short at flame sensor or in flame sensor wiring
Short to ground in flame sense circuit
Lingering burner flame Slow closing gas
valve
Open fuse Replace fuse
Short in low voltage wiring Locate and correct short in low voltage wiring
Flame sense micro amp signal is
minimal
Flame sensor is coated/oxidized
Flame sensor incorrectly positioned in
burner fame
Check inlet air piping for blockage, proper length,
elbows, and termination
Compare current gas pressure to rating plate and
adjust as needed
Problem with igniter circuit
Check and correct wiring from integrated control
module to igniter
Improperly connected or shorted igniter
Poor unit ground
Igniter relay fault on integrated control
module
Check igniter output from control, replace if necessary
High stage pressure switch circuit is
closed at start of heating cycle.
High stage pressure switch contacts
sticking
Shorts in pressure switch circuit wiring Repair short in wiring
Inspect pressure switch hose, repair/replace if
necessary
Inspect flue and/or inlet air piping for blockage, proper
length, elbows, and termination
Check drain system, correct as necessary
Check induced draft blower performance, correct as
necessary
Tighten or correct wiring connection
Polarity of 115 volt AC is reversed Correct polarity, check and correct wiring if necessary
Poor unit ground Verify proper ground, correct if necessary
Gas valve is not energized when it
should be
Check wiring in gas valve circuit
External Gas Valve Error Replace integrated control board
Furnace fails to
operate
EEb
Furnace fails to
operate
EEA
Furnace fails to
operate
EEL
Diagnose and replace shorted igniter as needed Verify
and correct unit ground wiring if needed
Furnace fails to
operate on high stage;
furnace operates
normally on low
stage Induced draft
blower operating
EE8
Diagnose and replace high stage pressure switch if
needed
Induced draft blower
and circulator blower
runs continuously
No furnace operation
EE4
Check for lingering or lazy flame Verify proper
operation of gas valve
Furnace fails to
operate on high stage;
furnace operates
normally on low stage
Induced draft blower
operating
EE9
High stage pressure switch circuit is not
closed
No furnace operation
EE5
Normal furnace
operation
EE6
Clean flame sensor if coated or oxidized Inspect for
proper flame sensor alignment
Lazy burner flame due to improper gas
pressure or combustion air
background
51
Troubleshooting Chart
Symptom
LED
Status
Fault Description Corrective Actions
Gas valve is energized when it should not
be
Check wiring in gas valve circuit
Internal gas valve error Replace integrated control board
Furnace fails to operate
.
No 115 power to furnace or no 24 volt
power to integrated control module
.
Restore high voltage power to furnace and integrated
control module
.
Blown fuse or tripped circuit breaker
Correct condition which caused fuse to open, replace
fuse
Integrated control module is non-
functional
Replace non-functional integrated control module.
Furnace fails to operate E10
Grounding fault
Poor neutral connection
Verify neutral wire connection to furnace & continuity to
ground source
Furnace fails to operate E11 Open roll out switch
Check for correct gas pressure Check for correct
burner alignment
Check for and correct burner restriction
Furnace fails to operate
EEn
Ignitor Open
Check for Ignitor wiring.
Replace Damaged Ignitor
Furnace fails to operate EEJ Inducer relay Error Replace int
egrated control board
Twinning feature not
working
EEH
TWIN Error
Check for wiring connections.
Replace integrated control board
Furnace fails to operate EEE
Internal Faults or IRQ Loss in Control
Board
Replace integrated control board
Furnace fails to
operate and goes
to hard lockout
EbL
Main blower motor is consuming
very little current after heat on
delay, below an expected value
Check for loose motor wiring connections.
Verify if the blower motor voltage, amps and proper
speed setting. If blower motor is not operating
correctly, replace the motor.
Furnace fails to
operate and goes
to hard lockout
EbU
Main blower moto
r is consuming
too much current during inducer
pre-purge, above an expected
value.
Verify wiring connections to and from motor
are not loose.
Verify that line voltage wires to the control
and the main blower motor are not reversed
at the control.
Furnace stops heating
and only the fan is
operating
EAF
Furnace has lost communication with the
R-32 sensor and the furnace is in
mitigation mode.
Verify wire connection to R-32 sensor is not loose.
Verify that the R-32 sensor wire is not damaged.
Replace R-32 Sensor.
Furnace stop
s heating
and only the fan is
operating
EAL
R-32 sensor has detected a refrigerant
leak and furnace is in mitigation mode.
Investigate the indoor coil for a refrigerant leak.
Furnace will resume normal operation once a leak is not
detected and the 5 minute delay period is over.
Furnace stops heating
and only the fan is
operating
EAS
R-32 sensor has detected a fault and the
furnace is in mitigation mode.
Investigate the R-32 sensor.
Replace the R-32 sensor.
Furnace stops heating
and only the fan is
operating
Ear
A2L relay in the furnace control board
has detected a fault and the furnace is in
mitigation mode.
Investigate A2L relay.
Cycle power on the furnace.
Replace integrated control board.
Furnace fails to operate EEC
None
Integrated control module
LED display provides no
signal
Furnace may not be paired with an R-32 cooling
unit. Refer to the R-32 Information Section.
background
52
HIGH VOLTAGE!
Disconnect ALL power before servicing or installing this unit. Multiple
power sources may be present. Failure to do so may cause property
damage, personal injury or death.
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
Wiring Diagram
ERROR CODE STATUS
READ CODES FROM LEFT TO RIGHT
SEVEN SEGMENT DISPLAY
Seg#3 Seg#2 Seg#1
INTERNAL FAULTS OR IRQ LOSS EEE
LOCKOUT DUE TO EXCESSIVE RETRIES RECYCLE EE0
LOW STAGE PRESSURE SWITCH STUCK CLOSED E E1
LOW STAGE PRESSURE SWITCH OPEN EE2
OPEN HIGH LIMIT SWITCH EE3
FLAME DETECTED WHEN NO FLAME SHOULD BE PRESENT EE4
OPEN FUSE EE5
LOW FLAME SIGNAL EE6
IGNITOR RELAY FAULT EEL
HIGH STAGE PRESSURE SWITCH STUCK CLOSED EE8
HIGH STAGE PRESSURE SWITCH OPEN EE9
REVERSED LINE POLARITY OR GROUNDING ERROR EEA
INTERNAL GAS VALVE ERROR EEb
EXTERNAL GAS VALVE ERROR EEC
OPEN ROLLOUT SWITCH E11
IGNITOR OPEN EEn
INDUCER RELAY ERROR EEJ
ERROR CODE STATUS
READ CODES FROM LEFT TO RIGHT
SEVEN SEGMENT DISPLAY
Seg#3 Seg#2 Seg#1
TWIN ERROR EEH
GROUNDING ERROR E10
LOW CIRCULATOR CURRENT EbL
CIRCULATOR CURRENT UNEXPECTED EbU
A2L COMMUNICATION ALARM EAF
A2L LEAKAGE ALARM EAL
A2L INTERNAL ALARM EAS
A2L RELAY ALARM EAr
FRONT COVER
PRESSURE
SWITCH
GR
GND
N
JUNCTION
BOX
L
DISCONNECT
WH
BK
GND
GR
GND
RD
24
VAC
115
VAC
BK
WH
WH
PK
RD
WH
BK
RD
PK
40 VA
TRANSFORMER
G
C
SENSOR
FLAME
1 ROLL OUT SWITCH
SOME UNITS MAY HAVE
PU
RD
1
WH
WH
LIMIT CONTROL
AUTO RESET PRIMARY
WH
1
WH
BK
RD
L
N
BK
GND
BLOWER
CIRCULATOR
CONNECTOR
2 CIRCUIT
2
3
IGNITER
SURFACE
HOT
2
BLOWER
DRAFT
INDUCED
BK
BLOWER COMPARTMENT
ECM MOTOR
HARNESS
RD
BURNER COMPARTMENT
1
2
3
4
5
6
7
8
9
10
11
12
EAC-H
XFMR-H
CIRC-H
LINE-H
E20
E39
E2
E1
E15
E8
E5
E4
E3
E7
E6
E25
5
E26W14
HUM-H
K8
1
LEFT
CENTER
RIGHT
SW331313 SW1
R223
SW2
6
R226
YL
RD
OR
BK
BK
WH
WH
WH
WH
RD
BK
WH
BL
GR
BR
PU
PU
NEUT2
NEUT1
CIRC-N
EAC-N
HUM-N
XFMR-N
LINE-N
INTEGRATED CONTROL MODULE
RD
5
2
1
4
3
RD
BK
OR
BL
YL
YL
BL
OR
BK
RD
T1
T2
T3
T4
T5
COM
RD
PK
RD
YL
PU
LIMIT
CONTROL
AUXILIARY
AUTO RESET
TWIN
24V HUM
E21
E24
W/W1
R
Y/Y1
G
C
Y2
W2
BK
GND
RD
OR
A2L
ALARM
SPARE
VT-
OUT
VT-
IN
A2L MODE IS ENABLED
BY DEFAULT
REFER TO INSTALLATION MANUAL
FOR FURTHER INSTRUCTIONS
GND
1
2
5V
SWITCH ASSEMBLY
ID BLOWER TWO-STAGE PRESSURE
3
WH
GY
C
1
BR
2
LO
HI
GY
(WHITE
RODGERS)
GAS VALVE
TWO STAGE
YL
GY
OR
YL
NO
SWITCH
PRESSURE
LOW FIRE
C
NO
SWITCH
PRESSURE
HIGH FIRE
YL
C
YL
0140F20004-B
TO 115 VAC/ 1
/60 HZ
POWER SUPPLY WITH
OVERCURRENT
PROTECTION DEVICE
WARNING: DISCONNECT
POWER BEFORE
SERVICING. WIRING
TO UNIT MUST BE
PROPERLY POLARIZED
AND GROUNDED
BK
A2L SENSOR
CONNECTOR
NOTES:
1. MANUFACTURER'S SPECIFIED REPLACEMENT
PARTS MUST BE USED WHEN SERVICING.
2. IF ANY OF THE ORIGINAL WIRE AS SUPPLIED
WITH THE FURNACE MUST BE REPLACED IT MUST
BE REPLACED WITH WIRING MATERIAL
HAVING A TEMPERATURE RATING OF AT LEAST
105
˚
C. USE COPPER CONDUCTORS ONLY.
3. UNIT MUST BE PERMANENTLY GROUNDED AND
CONFORM TO N.E.C. AND LOCAL CODES.
4. TO RECALL THE LAST 6 FAULTS, MOST RECENT
TO LEAST RECENT, DEPRESS SWITCH FOR MORE
THAN 2 SECONDS WHILE IN STANDBY
(NO THERMOSTAT INPUTS)
5. WHEN THIS FURNACE IS PAIRED WITH NON
R-32 REFRIGERANT SYSTEMS, DEFAULT SETTINGS
WILL NEED TO BE CHANGED. REFER TO
INSTALLATION MANUAL FOR FURTHER
INSTRUCTIONS.
BLOWER
COMPARTMENT
DOOR-SWITCH
(OPEN WHEN
DOOR OPEN)
SWITCH (PRESSURE)
FIELD SPLICE
FIELD GROUND
EQUIPMENT GROUND
PROTECTION DEVICE
PLUG CONNECTION
SWITCH (TEMPERATURE)
JUNCTION
OVERCURRENT
TERMINAL
IGNITER
HIGH VOLTAGE (115V)
HIGH VOLTAGE FIELD
LOW VOLTAGE (24V)
LOW VOLTAGE FIELD
WIRE
COLOR:
YL
WH
BL
BK
RD
OR
PK
GY
TN
GR
BR
YELLOW
WHITE
BLUE
BLACK
RED
ORANGE
BROWN
PINK
GRAY
TAN
GREEN
PURPLE
VIOLET
COLOR
DESIGNATION:
PU
VT
NO
C
background
53
For all side wall horizontally vented gas fueled equipment installed
in every dwelling, building or structure used in whole or in part for
residential purposes, including those owned or operated by the
Commonwealth and where the side wall exhaust vent termination
is less than seven (7) feet above nished grade in the area of the
venting, including but not limited to decks and porches, the following
requirements shall be satised:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS.
At the time of installation of the side wall horizontal vented
gas fueled equipment, the installing plumber or gastter shall
observe that a hard wired carbon monoxide detector with an
alarm and battery back-up is installed on the oor level where
the gas equipment is to be installed. In addition, the installing
plumber or gastter shall observe that a battery operated
or hard wired carbon monoxide detector with an alarm is
installed on each additional level of the dwelling, building or
structure served by the side wall horizontal vented gas fueled
equipment. It shall be the responsibility of the property owner
to secure the services of qualied licensed professionals for
the installation of hard wired carbon monoxide detectors
a. In the event that the side wall horizontally vented gas
fueled equipment is installed in a crawl space or an attic,
the hard wired carbon monoxide detector with alarm and
battery back-up may be installed on the next adjacent
oor level.
b. In the event that the requirements of this subdivision can
not be met at the time of completion of installation, the
owner shall have a period of thirty (30) days to comply with
the above requirements; provided, however, that during
said thirty (30) day period, a battery operated carbon
monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each
carbon monoxide detector as required in accordance with
the above provisions shall comply with NFPA 720 and be
ANSI/UL 2034 listed and IAS certied.
3. SIGNAGE. A metal or plastic identication plate shall be
permanently mounted to the exterior of the building at a
minimum height of eight (8) feet above grade directly in line
with the exhaust vent terminal for the horizontally vented
gas fueled heating appliance or equipment. The sign shall
read, in print size no less than one-half (1/2) inch in size,
“GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL
OBSTRUCTIONS”.
4. INSPECTION. The state or local gas inspector of the
side wall horizontally vented gas fueled equipment shall
not approve the installation unless, upon inspection, the
inspector observes carbon monoxide detectors and signage
installed in accordance with the provisions of 248 CMR
5.08(2)(a)1 through 4.
EXEMPTIONS
The following equipment is exempt from 248 CMR 5.08(2)(a)1
through 4:
1. The equipment listed in Chapter 10 entitled “Equipment Not
Required To Be Vented” in the most current edition of NFPA
54 as adopted by the Board; and
Special Instructions for Products Installed
in the State of Massachusetts
2. Product Approved side wall horizontally vented gas fueled
equipment installed in a room or structure separate from the
dwelling, building or structure used in whole or in part for
residential purposes.
VENT/FLUE
TEE
COMBUSTION
AIR INTAKE.
DISTANCE BETWEEN
COMBUSTION AIR
INTAKE AND GRADE
DISTANCE BETWEEN
VENT AND GRADE
(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT
VENTING SYSTEM PROVIDED. When the manufacturer
of Product Approved side wall horizontally vented gas
equipment provides a venting system design or venting
system components with the equipment, the instructions
provided by the manufacturer for installation of the
equipment and the venting system shall include:
3. Detailed instructions for the installation of the venting system
design or the venting system components; and
4. A complete parts list for the venting system design or venting
system.
(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT
VENTING SYSTEM NOT PROVIDED. When the
manufacturer of a Product Approved side wall horizontally
vented gas fueled equipment does not provide the parts
for venting the ue gases, but identies “special venting
systems”, the following requirements shall be satised by
the manufacturer:
5. The referenced “special venting system” instructions shall
be included with the appliance or equipment installation
instructions; and
6. The “special venting systems” shall be Product Approved by
the Board, and the instructions for that system shall include
a parts list and detailed installation instructions.
(e) A copy of all installation instructions for all Product
Approved side wall horizontally vented gas fueled
equipment, all venting instructions, all parts lists for venting
instructions, and/or all venting design instructions shall
remain with the appliance or equipment at the completion
of the installation.
background
54
START-UP CHECKLIST
Furnace
ELECTRICAL
Line Voltage (Measure L1 to N and N to Ground Voltage) L - N
N - G
Secondary Voltage (Measure Transformer Output Voltage) R - C
Blower Amps
BLOWER EXTERNAL STATIC PRESSURE
Return Air Sta�c Pressure IN. W.C.
Supply Air Sta�c Pressure IN. W.C.
Total External Sta�c Pressure (Ignoring +/- from the reading above, add total here) IN. W.C.
TEMPERATURES
Return Air Temperature (Dry bulb / Wet bulb) DB °F WB °F
DB °F WB °F
Hea�ng Supply Air Temperature DB °F
Temperature Rise DB °F
Delta T (Differenc
e between Supply and Return Temperatures) DB °F
GAS PRESSURES
Gas Inlet Pressure IN. W.C.
Gas Manifold Pressure (Low Fire) IN. W.C.
Gas Manifold Pressure (High Fire) IN. W.C.
Gas Type (NG) = Natural Gas / (LP) = Liquid Propane
Addi�onal Checks
Check wire rou�ngs for any rubbing
Check for kinked pressure switch tubing.
Check flue elbow for alignment and clamp �ghtness.
Check screw �ghtness on blower wheel.
Check factory wiring and wire c
onnec�ons.
Check product for proper clearances as noted by installa�on instruc�ons
°F to °C formula: (°F - 32) divided by 1.8 = °C °C to °F formula: (°C mul�plied by 1.8) + 32 = °F
Model Number
Serial Number
Cooling Supply Air Temperature (Dry bulb / Wet bulb)
Check R-32 sensor wire is connected properly (if applicable)
background
55
this page intentionally left blank
background
56
19001 Kermier Rd. Waller, TX 77484
www.goodmanmfg.com • www.amana-hac.com
© 2025 Daikin Comfort Technologies Manufacturing, Inc.
is a registered trademark of Maytag Corporation or its related companies and is used under license. All rights
reserved.
CUSTOMER FEEDBACK
We are very interested in all product comments.
Please ll out the feedback form on one of the following links:
Goodman
®
Brand Products: (hp://www.goodmanmfg.com/about/contact-us).
Amana
®
Brand Products: (hp://www.amana-hac.com/about-us/contact-us).
You can also scan the QR code on the right for the product brand
you purchased to be directed to the feedback page.
GOODMAN
®
BRAND
AMANA
®
BRAND

Specifications

Indexed Terms: Gas Furnace, Two-stage

Goodman GR9T960804CN Questions and Answers

Questions and Answers

Related Products