Zyxel XMG-105HP-GB0101F XMG-105HP 5-Port 2.5G Unmanaged Switch with 10G Uplink

Zyxel XMG-100 Series User Guide - Page 14

For XMG-105HP-GB0101F.

PDF File Manual, 37 pages, Read Online | Download pdf file

XMG-105HP-GB0101F photo
Loading ...
Loading ...
Loading ...
Chapter 2 Hardware Installation and Connection
XMG-100 Series User’s Guide
14
2.4.1 Installation Requirements
Distance above the floor: At least 1.8 m (5.9 feet)
Two M4 screws and a #2 Philips screwdriver
Two screw anchors (optional)
Figure 6 Screw Specifications for Wall Mounting
1 Select a position free of obstructions on a wall strong enough to hold the weight of the Switch.
2 Mark two holes on the wall at the appropriate distance apart for the screws.
WARNING! Be careful to avoid damaging pipes or cables located inside
the wall when drilling holes for the screws.
3 If using screw anchors, drill two holes for the screw anchors into the wall. Push the anchors into the full
depth of the holes, then insert the screws into the anchors. Do NOT insert the screws all the way in –
leave a small gap of about 0.5 cm.
If not using screw anchors, use a screwdriver to insert the screws into the wall. Do NOT insert the screws
all the way in – leave a gap of about 0.5 cm.
4 Make sure the screws are fastened well enough to hold the weight of the Switch with the connection
cables.
5 Align the holes on the back of the Switch with the screws on the wall. Hang the Switch on the screws.
Note: Make sure there is enough clearance between the wall and the Switch to allow
ventilation.
Loading ...
Loading ...
Loading ...