Hikvision DS-2SE7C144IW-AES5 DS-2SE7C144IW-AE S5 4MP 32x TandemVu IR Network Speed Dome

Hikvision Network Speed Dome Camera User Manual - Page 71

For DS-2SE7C144IW-AES5.

PDF File Manual, 108 pages, Read Online | Download pdf file

DS-2SE7C144IW-AES5 photo
Loading ...
Loading ...
Loading ...
8.2.3 Set Line Crossing Detecon
Line crossing detecon is used to detect the object movement of crossing a predened line. When
it occurs, the device takes linkage
acons as response.
Steps
1.
Go to Conguraon → Event → Smart Event → Line Crossing Detecon .
2.
Select a channel.
3.
Check Enable.
4.
Oponal: Click Lock to lock PTZ control to prevent the interrupon from other PTZ related acon
during conguraon.
Normally, the PTZ control is automacally locked when you enter the conguraon interface.
You can manually resume the lock when the countdown is over.
5.
Adjust the live image to the desired scene by using PTZ control buons.
Note
PTZ control is only available for Camera 01.
6.
Draw detecon line.
1) Select a Line No.. Up to 4 lines can be set in the scene.
2) Click Detecon Area.
A yellow line is displayed on live image.
3) Click on the line, and drag its end points to adjust the length and
posion.
4) Select the Direcon for the detecon line.
Direcon
It stands for the direcon from which the object goes across the line.
A<->B
The object going across the line from both
direcons can be detected and alarms are
triggered.
A->B
Only the object crossing the congured line from side A to side B can be detected.
B->A
Only the object crossing the congured line from side B to side A can be detected.
Network Speed Dome User Manual
59
Loading ...
Loading ...
Loading ...