Hestan GWD30TQ 30" Outdoor Warming Drawer with 2.3 cu. ft. Capacity, Digital Control, Convection Fan, Power Indicator Light and Halogen Interior Lighting in Bora Bora Turquoise

User Manual - Page 21

For GWD30TQ.

PDF File Manual, 52 pages, Read Online | Download pdf file

GWD30TQ photo
Loading ...
Loading ...
Loading ...
EN
©2021 Hestan Commercial Corporation
20
C
L
C
L
3
1
4
"
[82.6]
11
64
"
[4.3]
FOR
LIGHT PIPE
2
1
4
"
[57.2]
2
39
64
"
[66.3]
3
32
"
[2.5]
TYP.
X [11] DEEP
8 PLACES
10
13
32
"
[264.3]
29
27
32
"
[758]
3
1
4
"
1
9
32
"
[32.6]
1
61
64
BACK VIEW
NOTE: DIMENSIONS IN [ ] ARE IN mm.
[82.6]
"
[49.6]
7
16
"
PILOT HOLES
7/16” [11 mm]
dia. 3/32”
[2.5 mm]
7" 7"
3
4
"
[177.8] [177.8]
[19.1]
INSTALLATION - CUSTOM DRAWER FRONT (-OV MODELS)
CUSTOM PANEL REQUIREMENTS:CUSTOM PANEL REQUIREMENTS:
Have a typical thickness of 3/4” [19 mm].
Have all edges finished.
If using wood, the back must be sealed to prevent moisture damage.
Be capable of withstanding temperatures above 158°F [70°C].
PREPARING CUSTOM DRAWER FRONTPREPARING CUSTOM DRAWER FRONT
1. Mark pilot holes on the back side of the panel according to the dimensions indicated in the
drawing below.
2. Drill pilot holes with a 3/32” [2.5 mm] drill bit. Be careful not to drill all the way through the
panel. Pilot holes should only be 7/16” [11 mm] deep.
Loading ...
Loading ...
Loading ...