Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/56454325-ds-kd-e/bg21.png)
Figure 2-18 Placement of Lines
6.
Connect the cables.
1) Connect the lines and
module-connecng line to the corresponding
interfaces of the main unit, then place the main unit into the upper grid.
2) Connect the other end of the module-connecng line to the input interface
of the sub module.
3) Organize the cable with cable
e in the package. The suggested cable
connecon picture as shown below.
Module Door
Staon User Manual
24
Loading ...
Loading ...
Loading ...