Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/48233989-sr84x039g/bg1c.png)
黀
ǩ
23. Locate the following Door Rail Items:
1 PR Box Rail Truck Roller (PN 20137)
2 Bolt ½” x 6” (PN 19787)
1 Rail (PN 19748)
3 Rail Support Outside (PN 19774)
3 Rail Support Inside (PN 19773)
2 Stop Bolt (PN 19831)
2 Nut (PN 19825) and
2 Spacer (PN 12785)
24. Install a ½” Bolt (PN 19787) into the
center of each Roller Truck (PN 20137)
from the top. The head of the Bolt should
rest solidly between the inner flanges of
the Roller, locking it into place.
25. Install two sets of rollers into Rail and
secure with a rubber band or tape to
temporarily hold them in place during
assembly.
½” Bolts shown
installed in Roller
Assemblies
28
Loading ...
Loading ...
Loading ...