Friedrich CCV10A10A Chill Premier Inverter Smart Window Air Conditioner

User Manual - Page 7

For CCV10A10A.

PDF File Manual, 15 pages, Read Online | Download pdf file

CCV10A10A photo
Loading ...
Loading ...
Loading ...
12 13
C. INSTALLATION OF THE UNIT
C.4 Window Installation
C.4.1 Remove the Packaging
CAUTION:
Heavy object. Team handling is required during the installation process.
When handling the unit, be careful to avoid cuts from the sharp metal edges and aluminum
fins on the front and rear coils.
1. Removing All the Packaging
Carefully remove all the packaging straps and wraps from the air conditioner and accessories.
Left curtain frame,
pre-assembled in factory.
Left curtain,
pre-assembled in factory.
Top channel,
pre-assembled in factory.
Right curtain frame,
pre-assembled in factory.
Right curtain,
pre-assembled in factory.
Bottom channel,
pre-assembled in factory.
Figure C.4.1
C.4.2 Applying the Adhesive Foam Seal
Measure the length of the upper window frame, trim the adhesive foam seal to the appropriate length and apply as shown.
Figure C.4.2
C.4 Window Installation (Continued)
C.4.3 Placing Inside An Open Window
Carefully lift the air conditioner with a helper to the windowsill
and pull down the sash, making sure the air conditioner is
centered and its bottom rail is flush against the windowsill.
NOTE: The air conditioner should be tilted about 3˚ for better
drainage of condensate and rainwater. Use a level: about 1/3
bubble willshow correct slant.
Figure C.4.3
C.4.4 Securing the Side Brackets
Extend the side brackets from both sides of the air conditioner onto the left and right window frames and secure by installing four 3/4’’ screws
as shown.
NOTE: Install the upper screws first, then the lower screws.
Figure C.4.4
C. INSTALLATION OF THE UNIT
CAUTION
Excessive Weight Hazard
Use two or more people when
installing your air conditioner.
Failure to do so can result in
back or other injury.
Loading ...
Loading ...
Loading ...