Loading ...
Loading ...
Loading ...
25
en
Connection in Recirculation Version
All the items named in this procedure are
included in the recirculation kit. The correspond-
ing accessory numbers can be found at the end
of these operating instructions.
qPut connection 15 into the connection support
7.3, previously x with the upper bracket sup-
port chimne 7.2.1, and secure with a screw.
qInsert the connection extension pieces laterally
14.1 in connection 15.
qMake sure that the outlet of the extension
pieces 14.1 is horizontally and vertically aligned
with the chimney outlets.
qConnect the air outlet connection 15 to the
hood body outlet using either a pipe ø 150 mm.
qUse the jubilee clips 25 to ensure a x connec-
tion between pipe and hood outlet and between
pipe and connection (15).
qEnsure that the activated charcoal lters have
been inserted.(see parag. “Activated carbon
lter” in Filters and Maintenance chapter)
Installation
Loading ...
Loading ...
Loading ...