Broan 619004EX - 36-Inch Convertible Wall-Mount Chimney Range Hood

Installation Guide - Page 8

For 619004EX. Series: ELITE 61000
Also, The document are for others Broan models: 614804EX

PDF File Manual, 40 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
- 8 -
FASTEN FLUE TO HOOD AND BRACKET
WITH MOUNTING SCREWS (3,9x9,5mm)
8" ROUND
METAL DUCT
DECORATIVE
FLUE
DUCT TAPE
FLUE MOUNTING BRACKET
CONNECT DUCTWORK
1. Use mounting screws (4,8x38mm) and
drywall anchors to secure flue mounting
bracket to the ceiling and wall as shown.
2. Use 8" round metal duct to connect the
discharge collar on the hood to the
ductwork above.
3. Use duct tape to make all joints secure
and air tight.
4. Connect the upper flue to the bracket with
mounting screws (3,9x9,5mm).
5. Slide the lower flue downward, until it fits
properly around hood.
6. Secure lower flue to hood with mounting
screws (3,9x9,5mm).
MOUNTING
SCREWS
(4,8x38mm)
Exterior or In-Line
blower
Blower connection at hood:
1. Run 2-wire plus ground power cable from
the exterior or In-Line blower to the hood’s
wiring box marked “motor connection”.
2. Remove the cover from the wiring box and
remove one knockout.
3. Feed 6” of cable through the knockout
opening and secure the cable to the wiring
box with an appropriate connector.
4. Make electrical connections at the hood.
Connect white-to-white, red-to-black and
green-to-ground.
5. Replace the wiring box cover and screws.
make sure wires are not pinched between
the cover and box.
Exterior or In-Line blower connection:
1. Make electrical connections at the exterior
or In-Line blower (see instructions provided
with the exterior or In-Line blower).
Power connection at hood:
1. Plug the power cord into the electrical wall
receptacle.
BLOWER CONNECTION AT HOOD
BOX MARKED
“MOTOR
CONNECTION”
CONNECT:
WHITE-TO-WHITE,
RED-TO-BLACK,
GREEN-TO-GROUND.
Loading ...
Loading ...
Loading ...