Husqvarna 340IBT WITHOUT BATTERY AND CHARGER Leaf Blower

Operator's Manual - Page 13

For 340IBT WITHOUT BATTERY AND CHARGER.

PDF File Manual, 24 pages, Read Online | Download pdf file

340IBT WITHOUT BATTERY AND CHARGER photo
Loading ...
Loading ...
Loading ...
Remove the battery before
you do maintenance, other
checks or assemble the
product.
The operator must only do the
maintenance and servicing
shown in this operator's
manual. Speak to your
servicing dealer for
maintenance and servicing of
a larger extension.
Keep all nuts, bolts and
screws tight to be sure the
product is in safe working
condition.
Replace worn or damaged
parts.
If you do not do maintenance,
it decreases the life cycle of
the product and increases the
risk of accidents.
Special training is necessary
for all servicing and repair
work, especially for the safety
devices on the product. If not
all checks in this operator's
manual are approved after
maintenance, speak to your
servicing dealer. We
guarantee that there are
professional repairs and
servicing available for your
product.
Only use original spare parts.
Assembly
Introduction
WARNING: Read and understand the
safety chapter before you assemble the
product.
To assemble the tube and handle on
the product
1. Put the clamp (A) on the flexible tube (B) and push
the flexible tube onto the blower outlet (C).
C
A
B
D
2. Put the screw (D) on the clamp below the tube and
tighten the screw.
3. Attach the transport strap (E) to the guide track of
the joint swivel (F).
F
E
4. Put the clamp (G) on the flexible tube (B) and
attach the joint swivel (F).
G
B
H
F
5. Put the screw (H) on the clamp below the tube and
tighten the screw.
1166 - 007 - 30.06.2020 13
Loading ...
Loading ...
Loading ...