Pyle PCBLCO103 Cable Cover Ramp Safety Track, 2-Ch

ASSEMBLY INSTRUCTIONS

For PCBLCO103.

PDF File Manual, 2 pages, Read Online | Download pdf file

PCBLCO103 photo
HEAVY DUTY
3 CHANNEL SYSTEM
ASSEMBLY:
• Inspect areas for safety hazards
• Assemble sections by aligning female connectors over male connectors
• Press with foot to secure female connectors to male connectors
• Open cover and install cables down into channels
• Close cover flush with base
• Test installation for intended use
• Periodically inspect installation
CHANNEL CAPACITY:
LOAD CAPACITY:
The Cable/Hose Protection System has different load supporting capabilities depending on type of vehicle and
temperature. Suitability must be verified by testing under actual conditions.
OPERATING TEMPERATURE:
-40
˚
F to 120
˚
F (-40
˚
C to 48
˚
C)
CHEMICAL RESISTANCE:
Tested for compatibility with common motor oils, gasoline and diesel fuel.
Limited resistance to brake fluids and other chemicals.
MATERIAL:
UV-stabilized polyurethane elastomer
NO. OF
CHANNELS
3 Channel
14,210
lbs./Tire (6446 kg)
LOAD CAPACITY PER TIRE
MAX LOAD 70
˚
F (21
˚
C)
28,420 lbs./Axle (12,892 kg)
LOAD CAPACITY PER AXLE
MAX LOAD 70
˚
F (21
˚
C)
CABLE/HOSE MANAGEMENT COMPONENTS
CHANNEL CAPACITY - MAX. DIAMETER INCHES (mm)
3 Channels 2.25 in. (58.0 mm) width x 2.25 in. (58 mm) height
Simply interlock with
Dog Bone connectors to
extend protection length.
CABLE PROTECTORS
®
ASSEMBLY INSTRUCTIONS
#ZIS-GD3
Ver: 2/11
Pyle PCBLCO103
2 Channel 0.98’’ x 1.18’’ -inches (Each)
2
Up to 44,000 lbs.
Up to 11,000 lbs.